- Company Overview: Giza Systems is a lead system integrator in Egypt and Middle East acquired by Solutions STC.
- Role Responsibilities:
- Lead cross-functional teams, ensuring collaboration and alignment across different departments to achieve project objectives.
- Organized and facilitated meetings with stakeholders to discuss project business needs, set the vision, and define expectations.
- Establishing new strategic partnerships with regional and global companies to align with and support the company's objectives.
- Conducted market research to identify potential projects and assess their feasibility in MEA.
- Collaborated closely with the sales team to align opportunities with market demands and company objectives.
- Developed a framework that aligns with stakeholder requirements, ensuring clarity and consistency throughout the project.
- Prepared and submitted business requirements, discussing outcomes with stakeholders and vendors to initiate technical execution.
- Designed and delivered solution architecture and data flow diagrams that addressed business needs comprehensively.
- Identified and resolved technical challenges, providing optimized solutions to maintain project progress and quality.
Accomplished Projects :
EMAAR MISR SMART CITY COC (Jan 2023 – Present)
- Establishment of the HW architecture and data flow between the COC Components
- Verify integration solution between the subsystems and the IOT platform
- Workshops attendance with the stakeholders to discuss the use-cases and the required KPIs
- Workshop attendance with the vendors to ensure of received features to match the business needs
- Leading AVEVA system platform, WSO2 and GIS teams to ensure implementing the client requirements
- Follow up the progress of the project and gather the client comments and discuss the requirements
- Giza Systems is a lead system integrator in Egypt and Middle East.
SABIC Industrial Smart City POC (KSA) (Oct 2023 – Oct 2024)
- Leading team of implementation of the use cases related to health and safety.
- Verify the IIOT devices according to the client requirements.
- Verify the communication protocols of the IIOT devices with IDP platform.
- Leading team of the dashboard design according to the client requirements
- Leading the tests with the clients to ensure customer satisfaction.
MISC Smart City (KSA) (April 2023 – Oct 2023)
- Preparation of guidelines documents of the use-cases including the system architecture, features, and the communication protocol.
- Consultation role on the use cases applied on Honeywell IOT platform (HCS) and the subsystems' vendors.
- Approval on the UAT documents.
Egypt International Olympic Smart City (Egypt) (Oct 2021 – Present)
- Confirmation of the hardware specifications that satisfy the requirements.
- Attend the meetings with the client to discuss the use cases.
- Execution of the POCs for the three scopes (SCADA system, Street lighting and Waste management system) to ensure of the functionality of the systems and the communication with IOT platform according to the use cases.
- Communicate with the vendors to check and optimize the solutions.
Shoiba Power plant (KSA) (Jan 2022 –June 2022)
- Preparation of the technical documents
- Follow up and instruct a team in preparation and execution of the scope in the following:
- Extract the logic from the old PLC and study the philosophy document.
- Create a mapping sheet to be compatible with the new replacement.
- Create SCADA system using Wonderware platform.
Supply of Unit Control Boards for Kiambere Power Station (Kenya) (Sep 2019 – Jan 2020)
- Follow up the implementation of the ECP & MCP with a panel builder.
- Modifying the drawing according to as built using AutoCAD.
- FAT Implementation
Supply, installation, testing, commissioning, and Startup of 55 RTUs (Sep 2019 – Dec 2020)
- Preparing of FDS, FAT, SAT, Training, Maintenance & Troubleshooting Documentations.
- Programming of logic on SCADAPACK 535E using workbench software.
- FAT test implementation
HASSA Irrigation Zone 2,3,7 (KSA) (Jan 2021 – Aug 2021)
- Adding temperature measurements and totalizers to PLC and Clear SCADA Program for the pump station (Zone 3)
- SAT test implementation for Pump station (Zone 2)
- Programming and commissioning of manual and automatic mode for pump station (Zone 2)
- Programming of manual and automatic mode of the irrigation network on Honeywell RC 500 controller (Zone7)
- Simulation integration test with RC 500 and Clear SCADA (Zone7)
- Testing the radio communication between the server and the RTUs in the network using GE radio.
- Testing the repeater radio between the remote radios with the master radio.
Scada System for water station in Tabuk (KSA) (Feb 2021)
- SAT test implementation.
- PLC and Citect SCADA programming and commissioning. implementation
Juba electricity station in Wadi Eldwaser (KSA) (Sep 2021)
- Dosing Pump Analog FB wiring modification in the control panel and PLC programming
- Testing Automatic Mode of the Dosing Pump