Adel Nabih Shaker

Adel Nabih Shaker

Mechanical Projects Manager
Hurghada,BA

Summary

Experienced Mechanical Projects Manager and Engineer with 28+ years in mechanical works and plumbing installations. Skilled in project management, team leadership, and ensuring technical specifications are met. Proficient in monitoring project costs, making adjustments, and overseeing complex mechanical systems for timely completion. Demonstrated success in delivering high-quality results, maintaining standards, and driving project success through effective communication, leadership, and operational excellence. Expertise in implementing and designing various projects including internal plumbing, infrastructure networks, irrigation stations, swimming pools, water treatment plants, sanitation systems, and fire networks.

Overview

28
28
years of professional experience
6
6
years of post-secondary education
1
1
Language

Work History

Mechanical Projects Manager

RED SEA for Construction (RSC)
Alalamen, MT
01.2022 - Current
  • Company Overview: one of ORASCOM Companies
  • Latin Quarter Project -at New Alamein
  • Responsible for:
  • 1- all project activates.
  • 2- Follow up the entire project activates quality and duration with the project schedule.
  • 3- Arrangement for material orders on time.
  • 4- Coordinating works between different activates.
  • 5- Preparing daily & monthly reports.
  • 6-Preparing shop drawings
  • 7- Preparing work schedule, budget, bill of quantities.
  • 9- Review and comments all mechanical designs.
  • 10- Implementing , preparing shop drawing for general external networks including rainwater 1600 mm , drainage networks 2000mm, fire networks 350 mm, irrigation and fresh water networks and all utilities.
  • Improved overall project quality by conducting thorough design reviews and addressing potential issues proactively.
  • Monitored ongoing projects closely to ensure compliance with established specifications, codes, regulations, and guidelines.
  • Established strong relationships with clients by providing consistent updates on project status and addressing concerns promptly.
  • Achieved successful project completion by demonstrating strong leadership skills, clear communication, and a commitment to excellence in all aspects of mechanical project management.
  • Prepared, checked, and coordinated documentation to support component design and application.
  • Analyzed existing structures to create plans for modifications and improvements.
  • Reduced project timelines through effective communication and coordination with multidisciplinary teams.
  • Created innovative solutions to architectural problems, enabling successful project completion.
  • Managed procurement activities to secure necessary equipment, materials, and resources within budget constraints.
  • Implemented effective change management strategies to address scope modifications while minimizing disruptions to project timelines.
  • Enhanced project efficiency by streamlining mechanical processes and implementing cost-effective solutions.
  • Developed detailed project schedules to track progress and maintain accountability for on-time delivery.
  • Collaborated with stakeholders to identify project requirements, ensuring alignment of expectations and deliverables.
  • Identified opportunities for process improvements, resulting in increased efficiency and reduced costs.
  • Provided expert guidance during all phases of the construction process, contributing valuable insights based on extensive mechanical engineering experience.
  • Resolved technical challenges by drawing upon expertise in mechanical engineering principles and industry best practices.
  • Oversaw subcontractor performance, enforcing strict adherence to safety standards and quality control measures.
  • Recruited, placed, and oversaw project staff for optimal project results.
  • Conducted regular site inspections to assess progress against established milestones and initiate corrective actions as needed.
  • Led cross-functional teams in the development of innovative solutions for complex mechanical systems integration challenges.
  • Negotiated contracts with vendors and suppliers to keep material costs within set budgets.
  • Presented project information and status updates to customers and fielded concerns.
  • Evaluated existing procedures and made proactive adjustments to meet changing demands.

Mechanical Projects Manager

RED SEA for Construction (RSC)
Hurghada, Red Sea
03.2021 - 12.2022
  • Company Overview: one of ORASCOM Companies
  • Fanadir New Marina project - 15 Town house
  • Connected 15 Basement car barking including all mechanical utilities.
  • - Reviewing all designs for the project's mechanical and sanitary works and making the final assessment.
  • - Implementing all public network and infrastructure works for the project, including drainage, nutrition, fire, and irrigation networks inside the basements, and exposing them to public suspicions.
  • - Review and modify the design of the ventilation network for the basements, including the ventilation fans and jet fans And fully supervising its implementation.
  • - Implementing all sanitary works inside buildings.
  • - Implementing full connectivity for all networks in the project with the public networks in El Gouna Resort.
  • Reduced project timelines through effective communication and coordination with multidisciplinary teams.
  • Conducted regular site inspections to assess progress against established milestones and initiate corrective actions as needed.
  • Managed procurement activities to secure necessary equipment, materials, and resources within budget constraints.
  • Oversaw subcontractor performance, enforcing strict adherence to safety standards and quality control measures.
  • Provided expert guidance during all phases of the construction process, contributing valuable insights based on extensive mechanical engineering experience.
  • Prepared, checked, and coordinated documentation to support component design and application.
  • Evaluated bids from contractors to select the best-suited partners for successful project execution.
  • Implemented effective change management strategies to address scope modifications while minimizing disruptions to project timelines.
  • Created innovative solutions to architectural problems, enabling successful project completion.
  • Led cross-functional teams in the development of innovative solutions for complex mechanical systems integration challenges.
  • Evaluated existing procedures and made proactive adjustments to meet changing demands.
  • Analyzed existing structures to create plans for modifications and improvements.
  • Improved overall project quality by conducting thorough design reviews and addressing potential issues proactively.

Mechanical Projects Manager

RED SEA for Construction (RSC)
Hurghada, Red Sea
12.2018 - 12.2022
  • Company Overview: one of ORASCOM Companies
  • Tawila villas - town house with public swimming pools.
  • Shedwan villas- town house with public swimming pools.
  • Improved overall project quality by conducting thorough design reviews and addressing potential issues proactively.
  • Achieved successful project completion by demonstrating strong leadership skills, clear communication, and a commitment to excellence in all aspects of mechanical project management.
  • Evaluated bids from contractors to select the best-suited partners for successful project execution.
  • Analyzed existing structures to create plans for modifications and improvements.
  • Led cross-functional teams in the development of innovative solutions for complex mechanical systems integration challenges.
  • Maintained comprehensive documentation of all project activities, ensuring accurate record-keeping for future reference or audits.
  • Negotiated contracts with vendors and suppliers to keep material costs within set budgets.
  • Managed procurement activities to secure necessary equipment, materials, and resources within budget constraints.
  • Evaluated existing procedures and made proactive adjustments to meet changing demands.
  • Resolved technical challenges by drawing upon expertise in mechanical engineering principles and industry best practices.
  • Prepared, checked, and coordinated documentation to support component design and application.
  • Collaborated with stakeholders to identify project requirements, ensuring alignment of expectations and deliverables.
  • Implemented effective change management strategies to address scope modifications while minimizing disruptions to project timelines.
  • Created innovative solutions to architectural problems, enabling successful project completion.

Mechanical Construction Manager

RED SEA for Construction (RSC)
Hurghada, Red Sea
11.2012 - 12.2021
  • Company Overview: one of ORASCOM Companies
  • Jubal 1&2 villas - town house - Jubal view villas - town house - Casa Cook Hotel.
  • Responsible for:
  • 1- all project activates.
  • 2- Follow up the entire project activates quality and duration with the project schedule.
  • 3- Arrangement for material orders on time.
  • 4- Coordinating works between different activates.
  • 5- Preparing daily & monthly reports.
  • 6-Preparing shop drawings
  • 7- Implementing all installations of the central boiler network in the pensions and the pump room and operating them independently.
  • 8- Preparing work schedule, budget, bill of quantities.
  • 9- Review and comments all mechanical designs, design swimming pools and general external networks.
  • 10- Implementing the main pump room for the project, including irrigation, feeding, and fire pumps and operating them.
  • 11- Implementing lifting station rooms, installing pumps in secondary stations and the main area of the project and operating them.
  • Identified and resolved construction issues promptly to prevent delays.
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Increased client satisfaction by consistently delivering high-quality workmanship and addressing concerns promptly.
  • Managed procurement processes for timely delivery of materials while minimizing costs, ensuring smooth project execution.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.
  • Managed budgeting and financial reporting for projects, ensuring transparency and adherence to financial guidelines.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Improved project efficiency by streamlining communication between architects, engineers, and subcontractors.

Mechanical Construction Manager

Orascom Hotels Holding
Hurghada, Red Sea
06.2006 - 12.2012
  • New marina - at Elgouna-hurghada (marina, 22 buildings, 40 villas, lamison blue hotel, yacht club, fanadeer and mosaic 4 stars Pensions)
  • Responsible for:
  • 1- all project activates.
  • 2- Follow up the entire project activates quality and duration with the project schedule.
  • 3- Arrangement for material orders on time.
  • 4- Coordinating works between different activates.
  • 5- Preparing daily & monthly reports.
  • 6-Preparing shop drawings
  • 7- Implementing a fire network from seamless pipes, Schedule 40, in the main buildings.
  • 8- Preparing work schedule, budget, bill of quantities.
  • 9- Review and comments all mechanical designs, design swimming pools and general external networks.
  • 10- Supervising the implementation of the central air conditioning network and chillers in all hotel suites.
  • 11- Implementing lifting station rooms, installing pumps in secondary stations and the main area of the project and operating them.
  • 12- Supervising the implementation of 16 elevators with different loads in all the project buildings
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Improved project efficiency by streamlining communication between architects, engineers, and subcontractors.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Conducted thorough risk assessments to identify potential hazards early in the planning stages, mitigating delays or complications.
  • Managed budgeting and financial reporting for projects, ensuring transparency and adherence to financial guidelines.
  • Prepared detailed project estimates and reports for management review.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.

Mechanical Site Manager

Orascom Hotels Holding
Hurghada, Red Sea
06.2004 - 05.2006
  • All sanitary and mechanical work for the restaurant, starting with reviewing the designs, making the budget for the project, and implementing all the work ourselves, including kitchen work, operating equipment, fire networks, feeding, drainage, marking, completing the work, preparing final reports and the course, and handing over the project.
  • Monitored, coached, and supervised team of [10] employees in [2 years].
  • Created weekly and monthly reports and presentations for management team.
  • Oversaw employee attendance record, handled payroll, and ordered new materials for sites.
  • Oversaw all daily office operations and equipment maintenance.
  • Resolved issues between employees and customers using company policies.
  • Implemented cost-saving measures, identifying areas for improvement in material procurement and labor utilization.
  • Improved client satisfaction with timely project completion through effective communication and coordination among team members.
  • Established clear lines of communication among various departments involved in the construction process to ensure seamless collaboration toward shared objectives.
  • Reduced safety incidents by conducting regular site inspections and enforcing strict adherence to safety protocols.
  • Inspected cleanliness of common areas and offices.
  • Maintained detailed records of all site activities, providing valuable data for future planning efforts and analysis of best practices in site management techniques.
  • Ensured compliance with local regulations, obtaining necessary permits and coordinating inspections throughout the construction process.
  • Coordinated training programs for new hires, ensuring all team members were knowledgeable about company policies, safety practices, and job-specific skills.
  • Improved team productivity with targeted coaching and performance monitoring.
  • Conducted comprehensive training programs for new hires, ensuring high level of competency and adherence to safety standards.
  • Negotiated contracts with suppliers to secure favorable terms and cost savings, contributing to budget adherence.
  • Maintained records and logs of work performed and materials and equipment used.

Acting Head of the Mechanical & Plumbing Sector

Orascom Hotels Holding
12.1998 - 05.2004
  • - Study and review all the mechanical works of the project and develop a general budget of the entire mechanical works.
  • - Design and implementation of an industrial well with a size of 6,000 m3, taken directly from the sea and returned to a well, with the implementation and operation of its pump room.
  • - Supervising the implementation of 12 elevators with different loads in all the project buildings.
  • - implementing all mechanical infrastructure networks independently ( drainage - fresh water - fire fighting - lift stations ) all materials were PVC from 2 inch to 8 inch and simless black steel sch,40.
  • - implementing mechanical installations for fountains and operating them independently.
  • - implementing the indoor networks (fresh water - drainage- fire fighting )for the main building.
  • - implementing internal copper and PVC feeding and drainage works inside all 504 hotel rooms.
  • - Implementing mechanical extension works for swimming pools of sizes from 60 m3 to 1200 m3 independently.
  • - Implementing and operating all pump rooms for swimming pools independently.
  • - Implementation, installation and operation of the main pump room for the project's supply, irrigation and fire networks.
  • - Implementing mechanical installation and crystallization works for the hotel's main treatment plant and operating it independently.
  • - Implementing all mechanical installations for the supply and drainage water and outlets at the main kitchen of the hotel.
  • - Implementing all network works and mechanical extensions for the health club, steam rooms and Sauna rooms in the main buildings.
  • - Supervising the implementation of the central air conditioning and chiller network in the hotel.
  • - Supervising the implementation and operation of the complete control network with the BMS system for the entire project.
  • - Handing over all mechanical and sanitary work after completion and preparing handover reports with InterContinental Co, management.
  • Organized and detail-oriented with a strong work ethic.
  • Self-motivated, with a strong sense of personal responsibility.
  • Excellent communication skills, both verbal and written.
  • Worked well in a team setting, providing support and guidance.
  • Passionate about learning and committed to continual improvement.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Resolved problems, improved operations and provided exceptional service.
  • Proved successful working within tight deadlines and a fast-paced environment.

Senior Site Engineer

Orascom Hotels Holding
Hurghada, Red Sea
01.1998 - 09.1998
  • - implementing all mechanical infrastructure networks independently ( drainage - fresh water - fire fighting - lift stations ) all materials were PVC from 2 inch to 8 inch from 6 bar to 16 bar.
  • - implementing mechanical installations for fountains and operating them independently.
  • - implementing the fresh water supply network for the main buildings, made of copper with diameters from 1/2 inch to 3 inches.
  • - implementing internal copper and PVC feeding and drainage works inside all 504 hotel rooms.
  • - Implementing mechanical extension works for swimming pools of sizes from 60 m3 to 800 m3 independently.
  • - Implementing all mechanical installations for the supply and drainage water and outlets at the main kitchen of the hotel.
  • Managed subcontractors to ensure timely completion of tasks, maintaining project schedules and budgets.
  • Improved workplace safety by conducting thorough risk assessments and implementing comprehensive safety protocols.

Site Engineer

Orascom Hotels Holding
Hurghada, Red Sea
02.1997 - 12.1997
  • - implementing all mechanical infrastructure networks independently ( drainage - fresh water - fire fighting - lift stations ) all materials were PVC from 1/2 inch to 8 inch from 6 bar to 16 bar
  • - implementing mechanical installations for fountains and operating them independently
  • - implementing the fresh water supply network for the main buildings, made of copper with diameters from 1/2 inch to 3 inches.
  • - implementing internal copper and PVC feeding and drainage works inside all 240 hotel rooms
  • Estimated materials costs and sourcing requirements for project feasibility.
  • Conducted detailed site surveys to identify potential issues, leading to smoother project execution.

Education

BSc - Civil Engineering

Assiut University
Assiut
09.1989 - 05.1995

Skills

Budget management

Interests

Football
Bing Bong

Personal Information

  • Date of Birth: 02/15/72
  • Nationality: Egyptian

Career Overview

Mechanical projects manager, engineer with 27 years of experience in the field of mechanical works and plumbing installations. Project items: Implementation and design of all works (internal plumbing - all types of infrastructure networks - electronic irrigation stations - implementation and design of swimming pools - implementation and operation of a water treatment plant) Sanitation with a capacity of 800 m3/day - Wastewater lifting stations of various sizes, secondary and main - all types - Design and implementation of irrigation, water, fire and swimming pools - Implementation and operation of fire extinguishing systems and pump rooms - Kitchen systems - Mooring systems - Rainwater network systems - Chemical extinguishing systems - All air conditioning systems - Artificial lake systems - Fountain systems.

Timeline

Mechanical Projects Manager

RED SEA for Construction (RSC)
01.2022 - Current

Mechanical Projects Manager

RED SEA for Construction (RSC)
03.2021 - 12.2022

Mechanical Projects Manager

RED SEA for Construction (RSC)
12.2018 - 12.2022

Mechanical Construction Manager

RED SEA for Construction (RSC)
11.2012 - 12.2021

Mechanical Construction Manager

Orascom Hotels Holding
06.2006 - 12.2012

Mechanical Site Manager

Orascom Hotels Holding
06.2004 - 05.2006

Acting Head of the Mechanical & Plumbing Sector

Orascom Hotels Holding
12.1998 - 05.2004

Senior Site Engineer

Orascom Hotels Holding
01.1998 - 09.1998

Site Engineer

Orascom Hotels Holding
02.1997 - 12.1997

BSc - Civil Engineering

Assiut University
09.1989 - 05.1995
Adel Nabih ShakerMechanical Projects Manager