Electrical Engineer team leader with over 15 years of successful experience in implementation for low current, low voltage systems, SCADA, Cathodic protection systems and
Revit, AUTOCAD, Dialux, MS Office, Networks, Computer maintenance. Recognized consistently for performance excellence and contributions to success in Construction industry. Strengths in Power, Low current and control systems backed by working with Large-scale projects and training in Gupco, Wallis, Siemens and Jelecom.
Nov/2019 to Aug/2020
Shoiaba Phase-4 Water Transmission System. Pump Station, pipe Line and Tanks to ensure compliance with relevant SWCC regulations.
Main responsible of Electrical works
For 950 million S.R project.
Infrastructure and interior Installation, Testing, Commissioning, Quality Assurance and coordination with other departments for
- SCADA system (RTUs, Control cables, Instruments for tanks, Motors control for valves).
- Lighting, power, Distribution Panels
- Transformers.
- Low current systems (Fire alarm system, BMS, Computer network and telephone network.
- Cathodic protection system for tanks and pipe line.
- Fiber optic cables and communication between RTUs.
May2019 to Nov 2019
Riyadh New City Feeders to ensure compliance with relevant SWCC regulations.
Checking of drawings, following up of installation, testing ans commissioning the following:
- SCADA.
- Cathodic protection system.
- Low voltage systems ( Switch gears, power sockets, lighting).
Grounding and lightning protection .
Dec 2013 to May/2019
KAP4 (Security Sporting Training Center) to ensure compliance with relevant MOI regulations.
Main responsible of Electrical works for 150 million S.R project. saved 25% of man power cost and 15% of Material cost of following systems
- BMS
- Lighting, power, Transformers and Distribution Panels
- Fire alarm system.
- Access control system.
- CCTV system.
- MATV system.
- Public Address System.
- Telecommunication system.
- Grounding and Lightning Protection system.
- Electrical lighting, Pumping, Heating and grounding systems for swimming pool.
- IT responsibility for offices of project.
April 2012 to Dec 2013
Shoiaba Phase-3 Water Transmission System. Arafat Tanks project to ensure compliance with relevant SWCC regulations.
Installation, Testing, Commissioning,
Quality Assurance and coordination
with other departments for:
- SCADA system (RTUs, Control cables, Instruments for tanks, Motors control for valves).
- Lighting, power, Distribution Panels
- Transformers.
- Fire alarm system.
- Cathodic protection system for tanks and pipe line.
- Fiber optic cables and communication between RTUs.
data and telecommunication systems. and Fire Alarm , testing systems to enhance power flow.
Team building and leadership
Shoiaba Phase-4 Water Transmission System. Pump Station, pipe Line and Tanks project.
Having Saudi and Egyptian driving license.
Revit
AutoCAD
Microsoft Office
3Ds Max