I have +12 years of experience in the quality control field and project management.
Throughout my career I have been involved in many mega projects with first-class companies for instance new capital power plant 4800-Megawatt, Alshifa storage tanks at KSA, High rise building Alamein NUCA Towers, and Dammam water treatment plant at KSA.
I am always seeking to upgrade my knowledge, support my experience and career with professional certificates in welding inspection such as CWI (certified welding Inspector AWS accreditation), NDT Levell Two UT&RT&VT&MT( ASNT accreditation), and Management certificates such as ( QMS Lead Auditor ISO 9001-2015) and PMP certificate (PMI accreditation).
I am interested in the QA/QC Mechanical Engineer, lead QA/QC Engineer, and Procurement QC Engineer positions.
Project Name: Alamian NUCA TowersLD-01-High Rise Building
Project Name: NEW CAPITAL POWER PLANT 4800 MW
1: Visual testing
2: Radiographic Testing
Project Name: ELBURULLUS POWER PLANT 4800 MW
1- Visual Testing.
2- Radiographic Testing
3- Issue NDT Request
1. Project Name: Riyadh Strategic Reservoirs Tank capacity is 1000,000 m3, and the diameter of the tank is 110 m.
2. Project Name: Water Treatment Plant 5000 m3
Overseeing inspection activities for the erection and testing of six storage tanks
Ø Material A 537 Cl 2 and A 573 Gr. 70 and A283 Gr. C Piping Material X56 according to API 5L.
Ø Inspection of pipelines and tanks, ensuring that all installed pipes and fittings are to the correct specification and that the material is in accordance with the specified traceability requirement.
Ø Review welding requirements for field-erected pipelines and tanks.
Ø Implement quality control activities on site in line with the established quality control program and field inspection testing procedures based on the construction schedule.
Ø Ensure that heat treatment and all non-destructive testing are in compliance with the relevant code and specification.
Ø Dealing with various codes, standards, and specifications (ASME 9, EN, ISO, ASTM, and API650 and API 1104) Performance, interpretations, and evaluation of the results for the following non-destructive testing:
1-Visual Testing.
2: Radiographic Testing
3: Issue NDT Request for a subcontractor
Qualification record "PQR" and welder performance qualification “WPQR
1: Project Name: Boiler Drum for Power Plant (Hydrostatic Pressure 50 Bar) ( Banha Power Plant)
2: Helwan Cement Company.
3: Steel Structure of Gulsan Egypt Plant
Test plan development
undefinedPMP Certified From PMI
PMP Certified From PMI
CWI (Certified Welding Inspector) from AWS
QMS ISO 9001:2015 Lead Auditor
NDT level 2 ( VT,RT,MT,UT) from ASNT
AUTO CAD 2D