

I have +12 years of experience in the quality control field and project management.
Throughout my career I have been involved in many mega projects with first-class companies for instance new capital power plant 4800-Megawatt, Alshifa storage tanks at KSA, High rise building Alamein NUCA Towers, and Dammam water treatment plant at KSA.
I am always seeking to upgrade my knowledge, support my experience and career with professional certificates in welding inspection such as CWI (certified welding Inspector AWS accreditation), NDT Levell Two UT&RT&VT&MT( ASNT accreditation), and Management certificates such as ( QMS Lead Auditor ISO 9001-2015) and PMP certificate (PMI accreditation).
I am interested in the QA/QC Mechanical Engineer, lead QA/QC Engineer, and Procurement QC Engineer positions.
Project Name: Alamian NUCA TowersLD-01-High Rise Building
Project Name: NEW CAPITAL POWER PLANT 4800 MW
1: Visual testing
2: Radiographic Testing
Project Name: ELBURULLUS POWER PLANT 4800 MW
1- Visual Testing.
2- Radiographic Testing
3- Issue NDT Request
1. Project Name: Riyadh Strategic Reservoirs Tank capacity is 1000,000 m3, and the diameter of the tank is 110 m.
2. Project Name: Water Treatment Plant 5000 m3
Overseeing inspection activities for the erection and testing of six storage tanks
Ø Material A 537 Cl 2 and A 573 Gr. 70 and A283 Gr. C Piping Material X56 according to API 5L.
Ø Inspection of pipelines and tanks, ensuring that all installed pipes and fittings are to the correct specification and that the material is in accordance with the specified traceability requirement.
Ø Review welding requirements for field-erected pipelines and tanks.
Ø Implement quality control activities on site in line with the established quality control program and field inspection testing procedures based on the construction schedule.
Ø Ensure that heat treatment and all non-destructive testing are in compliance with the relevant code and specification.
Ø Dealing with various codes, standards, and specifications (ASME 9, EN, ISO, ASTM, and API650 and API 1104) Performance, interpretations, and evaluation of the results for the following non-destructive testing:
1-Visual Testing.
2: Radiographic Testing
3: Issue NDT Request for a subcontractor
Qualification record "PQR" and welder performance qualification “WPQR
1: Project Name: Boiler Drum for Power Plant (Hydrostatic Pressure 50 Bar) ( Banha Power Plant)
2: Helwan Cement Company.
3: Steel Structure of Gulsan Egypt Plant
Test plan development
ASME coding
Kaizen methodology
Materials inspections
Corrective actions
Problem solve analysis
FMEA analysis
Continuous Improvement analysis
Root Cause analysis
Lean manufacturing techniques
Code analysis
PMP Certified From PMI