Summary
Overview
Work History
Education
Skills
Websites
Military Service
Awards
Inspection Testing Assignments
Projects
Training
Timeline
Generic

Ahmed Mohamed Abd Ell Sattar Ahmed

Senior Rotating Equipment Engineer
Alexandria

Summary

A Senior Rotating Equipment Engineer with more than ten (10) years of experience, Solutions-oriented engineering profession in oil and gas,petrochemical projects,natural gas liquids (NGL) processing and EPC projects with experience in PREFEED, FEED Detailed Engineering, Quotation, Engineering, PMC, Procurement, Construction, Pre-Commissioning, Commissioning and start-up EPC expansion work, overhauls, turnarounds, machine monitoring, root cause analysis, technical fundamentals, plant reliability and cost optimization. Analytical focused on applying engineering principles using both traditional and innovative methods. Brings Excellent interpersonal and communication skills to work effectively with colleagues, management and vendors. Proactive in identifying areas of improvement and taking steps to drive successful completion of projects.

Overview

10
10
years of professional experience
14
14
years of post-secondary education
3
3
Languages

Work History

Senior Mechanical Rotating Engineer

GASCO COMPANY
9 2021 - Current
  • Rotating Equipment section head GASCO WDGC "NGL complex" gas feed 900+ MMSCFD produce Methane, Ethane, propane, C2/C3 mixture and butane
  • Perform day-to-day Engineering, technical support and troubleshooting rotating equipment
  • Develop / prepare mechanical engineering tenders for new equipment suppliers and subcontractors among projects
  • Review project proposals and perform mechanical engineering for new facilities
  • Participate on installation, testing and commissioning of new facilities, turnaround and inspection
  • Review and update engineering documentation and drawings
  • Tack Project Planning, scheduling and analyze system performance for energy saving purpose
  • Make recommendations for technical/economic optimization of existing facilities
  • Lead feasibility/profitability studies for new / existing facilities
  • Contribute to business unit strategy/ Prepare Site reports & Quality management system provide direction and guidance on technical queries relating to mechanical engineering and raise appropriate EQ's / deviations
  • Evaluated vendor proposals for equipment procurement, selecting optimal solutions based on performance requirements
  • Train and develop assigned staff on relevant skills to enable them to become proficient on job
  • Developed planning criteria for integrating and enabling new technologies
  • Developed cost estimates and project specifications for proposals
  • Performed preventative maintenance to keep tools and equipment functional

Rotating Equipment Engineer

ENPPI - EPC COMPANY
2014.03 - 2021.09
  • Act as technical authority develop / prepare mechanical equipment engineering (rotating equipment) tenders for new equipment suppliers and conform to all applicable engineering codes and HSE standards as well as Client's policies and procedures
  • Preparation of rotating equipment Engineering deliverables, i.e
  • Selection of rotating equipment, prepare material requisitions, Equipment specifications, rotating equipment datasheets according to project specifications, International API, ASME, SAMS and H.I standards
  • Review process description, PFDs, and P&IDs and co - ordinate with other disciplines during all stages of design development to ensure there is no conflict within overall engineering design
  • Provides input to project equipment list, Process Packages, EPC scope of work and EPC Tender Package and Man-hour estimate
  • Provide input to Planning department in execution of activities duration quantify schedule
  • Evaluate of Technical bids between equipment tenders (Tender Bid Evaluations and assessment of bids) in PDP, FEED, clarifications, Vendor kick - off meetings and detailed design phases
  • Reviews supplier's (Vendor) documents for machinery equipment and attends clarification / pre-award meeting, HAZOP/HAZID meetings, Value Engineering ,3D Model Review and Peer Technical Reviews in different phases of project
  • Perform detailed project engineering in collaboration with multiple engineering disciplines
  • Witness FAT inspections (performance test, mechanical run test ...etc.)
  • Provide guidance to EPC contractor, supervising on-Site equipment installation pre-commissioning, commissioning and SAT test
  • Engage with Licensors, Equipment Vendors and OEM's as required to conclude project deliverables in accordance with project scope
  • Co-ordinate with Client's Engineering, Operations and Maintenance staff to ensure a consistent approach to project completion within boundary of technical scope
  • Participates in various task force/committees such as development of field development plans, trouble shooting in existing plants or development related to certain new technologies.

Education

Master of Science -

University of Alexandria
2015.09 - Current

BSc. Mechanical Power Engineering -

Faculty of Engineering, Alexandria University
2008.01 - 2013.04

Baker Hughes (BHGE) Nuovo Pignone, Italy, University Graduate -

BHGE Oil And Gas University
Florence, Italy
2016.08 -

Skills

Engineering Design

undefined

Military Service

Exempt

Awards

FSG Formula Student Germany 2012. (A Complete Fabrication, Packaging and inspection of Formula Car, Final Rank is 42nd among all University participants).

Inspection Testing Assignments

  • API 610, Hydrostatic test, performance test of fire pumps BB2 type at Ruhrpumpen, SUEZ, EGYPT. Witness
  • API -610, Performance test to vertical pumps VS-1 type Ruhrpumpen, SUEZ, EGYPT Witness.

Projects

GASCO WDGC -TRAIN-D, Rotating Equipment Section Head, GASCO WDGC Natural Gas Liquids (NGL). Responsible to Engineering, Maintenance, installation, commissioning and Startup of mechanical equipment to maximize the production of commercial propane, C2/C3 product to meet the national petrochemical sector and export needs. Plant gas feed capacity reach up to 1200 MMSCFD, including the below equipment: - API 616 Gas Turbines; GE (Frame 5 MS5382C, Frame 3 MS3152J), Siemens (SGT-600) and API 613 gear box / API 617 Centrifugal compressors (SIEMENS STC-SV and Thermodyn GE-BCL Compressors). Gas Turbine Controls: GE Mark V, Mark Vie. API 610 Pumps (OH1-BB1-VS). API 618 reciprocating compressor. API 614 turbo-expanders packages Atlas Copco-Mafi-Trench (Lube Oil & Magnetic Bearings type). API 617 centrifugal compressors (BHGE, Thermodyn, Siemens and Ingersoll Rand). WORLEY | ENPPI JV- ASORC - NEW NAPHTHA COMPLEX PROJECT (ISBL) (EPC LSTK) (ONSHORE) (GREEN FIELD) (OFFICE AND SITE BASED), Rotating Equipment Engineer, Orchestrated the successful implementation of a new Vapor Recovery Unit and Utilities OSBL, collaborating with ASORC and WORLEY, with inlet crude feed capacity of 400,000 TON/YR, Engineering, Design, Erection, Installation, pre-commissioning, commissioning, start-up, and SAT for the following equipment and packages of. includes the following: - API 612 special purpose steam turbine drive API 617 centrifugal compressor package, including evacuation unit, condensing unit and API 614 lube oil system. API 611 General Purpose Steam Turbine drive API 610 Centrifugal Pumps. API 611 General Purpose Steam Turbine drive API 676 triple screw pumps. API 618 reciprocating compressors package (directly flanged, flexible coupled and belt). API 617 Integrally Gear I&U Centrifugal Compressor API 673 centrifugal blowers. API 610 centrifugal pumps (Horizontal/Vertical). ASME B73.1 centrifugal pumps (Horizontal). API 675 proportioning pumps. API 676 Gear/Twin Screw/ Triple screw pumps. API 661 gas coolers (Belt type). Emergency diesel engine generator. Electric overhead cranes (Monorail/Single Girder/Double Girder). Industrial elevator (Rack and Pinion). ASME VIII steam jet ejector with silencer. ASME B16.5 inline static mixers. SAUDI ARAMCO (PROPOSAL PHASE) SAFANIYAH & MANIFA CRUDE INCREMENT PROGRAM-TERMINAL ONSHORE / OFFSHORE FACILITIES - RAS ALKHAIR (GREEN FIELD) (OFFICE BASED), Rotating Equipment Engineer, The objective of Safaniyah AH Development - Marine Terminal Facilities is to handle (i.e., receive, store, and to export - collectively called the Crude Oil Terminal or COT) 1000 MBD AH increment from Safaniyah field. worked as rotating equipment engineer, deliver FEED review and detailed engineering phases deliverables for the following equipment: as per international standard and SAMSS specifications. Shipping pumps (30,000GPM-13.5MW), VSD and EM. API610 centrifugal pumps. FIRE WATER pumps (NFPA20). I&U air compressors package. INTECSA /NCIC - PHOSPHATE FERTILIZER COMPLEX (ONSHORE) (GREEN FIELD) (OFFICE AND SITE BASED), PMC Mechanical Engineer, Responsible for assisting the project manager and project team with project Engineering, job cost control accounting, scheduling, Project execution Consulting, construction, commissioning, startup of Phosphate Fertilizer complex with a capacity average of 1950 MTPY Granulated DAP Plant, 1200 MTPD, Granulated Triple Superphosphate, G-TSP 750 MTPD. API 612 special purpose steam turbine power generation package, including evacuation unit, condensing unit and API 614 lube oil system. API 618 reciprocating compressors packages. API 673 centrifugal blowers. API 610 centrifugal pumps (Horizontal/Vertical). ASME B73.1 centrifugal pumps (Horizontal). API 675 proportioning pumps ( chemical injection package). API 676 Gear/Twin Screw/ Triple screw pumps. API 661 gas coolers (Belt type). Emergency diesel engine generator. Electric overhead cranes (Monorail/Single Girder/Double Girder). SHELL / NEAG-1 / BAPETCO- COMMISSIONING OIL FIELD (WESTERN DESERT) (ONSHORE) (BROWN FIELD) (SITE BASED), Rotating Engineer, Responsible for Commissioning and Startup of Bapetco-Shell NEAG-1 Oil Field (Western Desert) with production capacity of 11,000 bpd. for the following equipment and packages: API 610 centrifugal pumps (horizontal/vertical/high speed). ASME B73.1 centrifugal pumps (Horizontal). API 675 proportioning pumps. Emergency diesel engine generator. TOYO/ENPPI -JV -ETHYLENE/ POLYETHYLENE PETROCHEMICAL COMPLEX. (ONSHORE) (GREEN FIELD) (OFFICE AND SITE BASED), Rotating Equipment Engineer, Reporting to TOYO-ENPPI JV to execute Feed and Engineering, Installation, Pre-Commissioning, Commissioning and Startup, Project equipment phase to Polyethylene plant in ETHYDCO-Alexandria with a Total capacity of 400 KTA, Linear Low-Density Polyethylene (LLDPE) and High-Density Polyethylene (HDPE) through two trains of a capacity 200 KTA each, using polymer grade ethylene as feed stock, Ethylene Plant 460,000 Ton/Y and offsite OSBL utilities. are as follow: API 617 Centrifugal compressors (Integrally geared Compressor). API 610 centrifugal pumps (horizontal/vertical/high speed). API 618 reciprocating compressor (Piston Ring and Labyrinth type) API 661 gas coolers (belt type). Diesel Engine - vertical NFPA 20 firefighting pumps. ASME B73.1 centrifugal pump (jockey firefighting pumps). I&U air compressors (oil free screw type) / heatless type Dryers. Emergency diesel engine generator. Electric overhead cranes (double girder). API 676 positive displacement pumps (Mono -Screw). API 675 Proportioning pumps. Polyethylene extruder / pelletizer (solid handling equipment). Nitrogen Generation package.

Training

  • Jan.2019: Waukesha Gas Engines new technologies - Waukesha.
  • Nov. 2018: Turbo machinery Technology - Man Turbo.
  • Oct. 2018: Dry Gas Seals Technical Presentation- Eagle Burgmann.
  • April 2017: Centrifugal compressor basics design and control -ENPPI Academy.
  • Jul.2017: Risk management assessments course- ENPPI Academy
  • Mar. 2015: Mechanical seal course Assembly and disassembly - JOHN CRANE.
  • Aug.2014: Site training - QARUN / Apache Petroleum Company.
  • Aug.2014: Organizing and planning at -ENPPI Academy.
  • Aug.2014: Centrifugal & Gas Compressors seminar - Cameron.
  • Jul. 2014: Vibration analysis and diagnostics - BENTLY NEVADA.
  • Jul. 2014: Time management course - ENPPI Academy.
  • Dec. 2012: Maintenance and troubleshooting of internal combustion engines.
  • Oct. 2012: OSHA (Safety and occupational health) American standard -OGS Academy.
  • Sept.2012: Introduction to petroleum industry- OGS academy.
  • June. 2011: Non-Destructive test method: MT- Method Level I -EWA Academy.
  • Sep. 2011: Maintenance training- Health & Safety.

Timeline

Baker Hughes (BHGE) Nuovo Pignone, Italy, University Graduate -

BHGE Oil And Gas University
2016.08 -

Master of Science -

University of Alexandria
2015.09 - Current

Rotating Equipment Engineer

ENPPI - EPC COMPANY
2014.03 - 2021.09

BSc. Mechanical Power Engineering -

Faculty of Engineering, Alexandria University
2008.01 - 2013.04

Senior Mechanical Rotating Engineer

GASCO COMPANY
9 2021 - Current
Ahmed Mohamed Abd Ell Sattar AhmedSenior Rotating Equipment Engineer