• Project : STEIGENBERGER Hotel El Tahrir Sq.
• Project : QNB head office El Tahrir Sq.
Carrefour CFC _Cairo
Renovation of Mena House hotel (Phase (2B) Oasis, Italian Restaurants and Land escape
Mena House Hotel “utility building” Project “Oberoi”_ Cairo
Project Coordinator:
• Monitoring sub-contractors with daily reports
• Verifying sub-contractors deliverable and confirming their formal acceptance
• Coordinating between sub-contractors, Technical office, Procurement and Planning
• Overcoming any obstacles between the main and sub-contractors and running the project smoothly
• Meeting with stakeholders
• Ensuring the project was running on schedule
• The key person of the team responsible for the closing phase of the project
Electrical Team Leader:
• Responsible for the field design work (e.g.: revising shop-drawings, preparing work schedules and material take-off).
• Manage and lead Electrical subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner)
• Reviewing Sub-contractors drawings and request changes when needed
• Preparing Shop-drawings and RFIs
• Ensuring that all the drawings were according to the project Specifications
• Responsible for Supervising the installation High voltage substation 22 KVA with ABB
• Responsible for installation of all medium voltage work in project
• Responsible for the installation of all electrical work in Main Energy Center building consist of :
1- chillers, cooling towers, ETS rooms
2- Firefighting pumps , Booster pumps.
3- Responsible for Supervising the installation all electrical work in building.
• Responsible for the installation of low voltage system (power sockets, lighting power feeder to split units air conditions power panel boards, roll up doors and exhaust fan feeder, FCU ,Jet Fans)
• Responsible for the installation of Low Current Systems (e.g.: fire alarm, fire fighting, telephone, Public address, MS systems, CCTV ).
• Responsible for the installation of all MCCs panels, Vsds, fans and all AHU .
• Responsible for the installation of all electrical work in the main car park (CS)
• Responsible for the installation of four generators with rate 2.5 mega
Microsoft Office
undefinedOperation Director