Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic
Ahmed Saqr

Ahmed Saqr

Projects Manager

Summary

Managing for more than 20 yr controlling directing following planning supervising execution huge international projects same hills high rise buildings bridges Resourtes hospitals and highways.

Overview

2026
2026
years of professional experience
8
8
years of post-secondary education
1
1
Certification

Work History

Bridges sector manager

GARBLT
01.2016 - Current
  • Reviewing the design / Shop drawings of foundation work
  • Attending the soil investigation sampling process
  • Reviewing the soil investigation reports
  • Reviewing the proposed construction method of piling
  • Inspection of piles drilling, concrete pouring
  • Attending and supervision of pile test process - Name of assignment or project:
  • Execution of bridges Of axes 30 Julie (shader azam br
  • And canal port said - Year:

Bridges Sector Manager

General Authority, Bridges
01.2015 - Current

- 10.2019

bridges designer

Ahmed Mohamed Saqr Signature
1 1 - 01.2019
  • Prepare design drawings with plan, section and detail format or plan and profile as designated by the engineering team
  • Prepare sketches of details not included on existing drawings to accurately reflect as-installed field conditions
  • Prepare drawings, forms, maps, and lists based on approved details provided by MOT designers and engineers
  • Red line and update drawings
  • Various projects including Commercial and Residential
  • Working with a Civil Engineer, will take directions and draft land parcels, grading’s 13
  • Certification:
  • I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience
  • I understand that any wilful misstatement described herein may lead to my disqualification or dismissal if engaged.

Structural / Bridge Engineer

01.2015 - 01.2016
  • RE Bridges projects 12
  • Detailed Task Assigned: Work Undertaken that Best Illustrates Capability to
  • Handle the Tasks Assigned
  • Review the Hydrology/Hydraulic and
  • Structures Report of design consultant, prepare Structures
  • Review Report and propose modifications if necessary
  • Take part in the preparation of Design
  • Review Report
  • Advise the Head of Mission for structural design changes that may arise during the construction supervision stage
  • Review and approval of structural
  • Working Drawings and Calculations submitted by the Contractor
  • Supervision of all structural Works
  • Maintain daily site diary and submit the same to the Head of Mission
  • Plan the delivery of the project at hand
  • Manage the day-to-day working, utilization, implementation and technical consultants engaged on
  • MOT assignments
  • From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues
  • Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard
  • Plan and arrange visits to existing and new potential clients, ensuring every client receives sufficient support to enhance their relationships
  • Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase
  • Co-ordinate required support levels and training
  • Produce reports - Name of assignment or project:
  • Execution of bridges kalabsha and temma bridges

Bridges sector manager

AL Raghi group
01.2009 - 01.2015
  • Performed:
  • Planning and Defining Scope,
  • Activity Planning and
  • Sequencing, Resource
  • Planning, Developing Schedules,
  • Time Estimating ,Cost
  • Estimating, Developing a
  • Budget, Documentation, Creating
  • Charts, and Schedules,
  • Risk Analysis, an aging Risks and Issues, Monitoring and Reporting
  • Progress, Team
  • Leadership,
  • Strategic Influencing, Business
  • Partnering, Working with Vendors,
  • Scalability, on each project at agreed intervals, and whenever substantive actions are required
  • Interoperability and Portability
  • Analysis, Controlling
  • Quality, Benefits realization
  • Name of assignment or project:
  • Execution of Harameen High speed rail road - Year

Bechtel cooperation Company, Bechtel
01.1989 - 01.2015

SAQR
1 1 - 01.2010
  • 2019
  • Name and Signature of staff member or authorised representative

Bridges sector manager

01.2007 - 01.2009
  • Plan the delivery of the project at hand
  • Manage the day-to-day working, utilization, implementation and technical consultants engaged on MOT assignments
  • From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues
  • Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard
  • Plan and arrange visits to existing and new potential clients, ensuring every client receives sufficient support to enhance their relationships
  • Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase
  • Co- ordinate required support levels and training
  • Produce reports on each project at agreed intervals, and whenever substantive actions are required
  • Name of assignment or project:
  • Execution of bridges Of Nallot al gabal al garbi

Bridge project manager

Bechtel
01.2004 - 01.2009
  • Plan the delivery of the project at hand
  • Manage the day-to-day working, utilization, implementation and technical consultants engaged on MOT assignments
  • From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues
  • Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
  • Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase
  • Co-ordinate required support levels and training - Name of assignment or project:
  • Execution of military Airport of sert zone and HIP
  • Housing projects-andalos-almareg-susa

Project manager

01.1998 - 01.2002
  • Accomplishes work requirements by orienting, training, assigning, scheduling, and coaching employees
  • Meets work standards by following production, productivity, quality, and customer- service standards; resolving operational problems; identifying work process improvements
  • Meets cost standards by monitoring expenses; implementing cost-saving actions
  • Updates job knowledge by participating in educational opportunities; reading professional publications
  • Enhances department and organization reputation by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments
  • Name of assignment or project:
  • Execution of Aliaa queen High Dam

construction manager

Bechtel
01.1998 - 01.2002
  • Activities performed: engaged on MOI assignments
  • From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues
  • Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
  • Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase
  • Co-ordinate required support levels and training
  • Name of assignment or project:
  • Execution of Ring road alaziqia -ariha

Civil Engineer

Bechtel
Cairo, Cairo
02.1991 - 01.1994
  • Prepare design drawings with plan, section and detail format or plan and profile as designated by the engineering team
  • Prepare sketches of details not included on existing drawings to accurately reflect as-installed field conditions
  • Prepare drawings, forms, maps, and lists based on approved details provided by MOT designers and engineers
  • Red line and update drawings
  • Various projects including Commercial and Residential
  • Working with a Civil Engineer, will take directions and draft land parcels, grading’s, - Name of assignment or project:
  • Design, prepare tenders of the bridges: Al fauim-abu hamad-ehnasia-almansora-suez canal-shernin- alamria- bridge, Garble ( bridges design sector

Education

Dpi - Management Quantitative Methods

ACI
California
05.2015 - 09.2016

B.Sc. - Civil Engineering

Cairo University
Faculty Of Engineering
01.1986 - 07.1990

M.sc - Civil Engineering

Cairo University
08.1990 - 08.1992

Skills

French : VG (speaking, reading & writing)undefined

Accomplishments

  • 1
  • Proposed Position: Structural Projects Director 2
  • Name of Firm: “ A C E ” - Arab Consulting Engineers 3
  • Name of Staff: Ahmed Mohamed Mohamed Saqr 4
  • Profession: Structural Engineer 5
  • Date of Birth : 1967 Nationality : Egyptian 6
  • Years with the Consultant: 28 years

Certification

  • Licensed [Job Title] - [Timeframe]

Timeline

Bridges sector manager

GARBLT
01.2016 - Current

Dpi - Management Quantitative Methods

ACI
05.2015 - 09.2016

Bridges Sector Manager

General Authority, Bridges
01.2015 - Current

Structural / Bridge Engineer

01.2015 - 01.2016

Bridges sector manager

AL Raghi group
01.2009 - 01.2015

Bridges sector manager

01.2007 - 01.2009

Bridge project manager

Bechtel
01.2004 - 01.2009

Project manager

01.1998 - 01.2002

construction manager

Bechtel
01.1998 - 01.2002

Civil Engineer

Bechtel
02.1991 - 01.1994

M.sc - Civil Engineering

Cairo University
08.1990 - 08.1992

Bechtel cooperation Company, Bechtel
01.1989 - 01.2015

B.Sc. - Civil Engineering

Cairo University
01.1986 - 07.1990

- 10.2019

bridges designer

Ahmed Mohamed Saqr Signature
1 1 - 01.2019

SAQR
1 1 - 01.2010
Ahmed SaqrProjects Manager