Summary
Overview
Work History
Education
Skills
Languages
Timeline
Professional Development
Familiarwith
Professional Development
AHMED TARAKHAN

AHMED TARAKHAN

Offshore Site Manager
Zagazig, Sharkaia, Egypt

Summary

Site Manager with 15+ years of experience managing complex offshore and onshore oil & gas projects. Proven success in executing EPC contracts, including platform fabrication, pipeline installations, and topside integration. Skilled in managing the full project lifecycle, ensuring HSE compliance and optimizing operations. Adept at driving efficiency and delivering high-quality results within budget and deadlines. Committed to continuous improvement and exceeding project goals with strong decision-making skills.

Overview

15
15
years of professional experience

Work History

Offshore Site Manager

West El Burullus Petroleum Company, Cheiron J.V
07.2022 - Current
  • Project: Web Offshore Field Development (EPCI Contract)
  • Key Subcontractors: PPIS, 2H Offshore, PMS, PETROJET
  • Project Overview: Development and installation of two offshore platforms (WEB & PAPYRUS) with interconnecting and export pipelines
  • PAPYRUS production (60 MMSCFD) transported to WEB platform (140 MMSCFD) via a 3 km pipeline; export pipeline extends 35 km to WDDM facilities
  • Scope of Work: Pipeline Works: Concrete coating for 14” and 8” polyethylene-coated line pipes at PTJ CWC Factory (Port Said)
  • Underground laying and tie-in of a 14” pipeline with WDDM onshore facilities
  • Beach pull activities for a 14” pipeline (1200m) using PMS 11 barge and linear winch
  • Platform Fabrication and Installation (2200 Tons): Installation of jackets, piles, topside facilities, gas well hookups, HIPPS, pig launchers, WHCPs, Telecom/NAVAID, pedestal cranes, and power generation systems
  • Led a multidisciplinary team for onshore/offshore construction
  • Developed hookup strategies and coordinated with stakeholders
  • Resolved construction-related issues, ensuring technical compliance
  • Supervised contractors/vendors for adherence to specifications and safety standards
  • Conducted HSE audits to ensure compliance with environmental and safety regulations
  • Monitored progress, mitigated risks, and reported project status
  • Improved construction procedures and contributed to best practices
  • Maintained stakeholder communication, addressing concerns and providing updates
  • Created weekly and monthly reports and presentations for management team.
  • Oversaw all daily office operations and equipment maintenance.

Deputy Construction Manager

Badr El Din Petroleum Company (BAPETCO), Shell J.V
01.2019 - Current
  • Sitra PWRI Project: Directed the construction of the Produced Water Re-Injection system
  • Incinerator Tower Project: Led the disassembly and reassembly of the incinerator tower
  • Mercury Removal Units (MRU): Oversaw the construction of three MRU trains for Bed-3
  • Provided cross-functional leadership to align team efforts, driving successful achievement of project goals
  • Managed projects using Agile methodologies to adapt to continuous changes and ensure learning throughout the project life cycle
  • Led internal and external engineering and construction interfaces, ensuring accountability for project performance, resolving conflicts, and streamlining processes
  • Ensured the quality and timely completion of engineering and construction deliverables, monitoring critical paths (CPM) and key milestones to meet schedules
  • Implemented cost control measures for reduced overall project expenses.
  • Enhanced project efficiency by streamlining communication between team members and stakeholders.
  • Coordinated with subcontractors to ensure seamless integration of tasks and resources.
  • Evaluated bids from subcontractors to select the most qualified candidates for each task while maximizing value for money spent on services rendered.
  • Utilized advanced scheduling software tools effectively managing timelines thereby ensuring on-time delivery for multiple projects.
  • Collaborated with architects and engineers to optimize design plans for constructability and budget constraints.

Mechanical Team Leader

Badr El Din Petroleum Company (BAPETCO), Shell J.V
06.2017 - 01.2019
  • Project Coordination: Managed SIMOPS activities, ensuring optimal resource utilization and compliance with HSE and quality standards
  • Contractor & Performance Management: Monitored contractors' adherence to schedules and budgets, minimizing variations and ensuring milestones were achieved
  • Engineering & Procurement Oversight: Led engineering reviews, addressed technical queries, and supervised procurement to prevent delays
  • Heavy Lifting & Equipment Planning: Coordinated heavy lifting plans and equipment handling, ensuring safety and accuracy
  • Pre-Commissioning & Commissioning: Managed mechanical completion, leak tests (CLT & GLT), and punch list resolutions for project handover
  • Key Projects: Ameriya Metering Station Relocation, Oily Water Tank Relocation, Incinerator Replacement (120 tons), Ben-field System Piping Replacement, Pipelines & Well-head Hook-ups, Gas Pre-Compression & Rectification Projects, Shut-downs & HSE Compliance, Water Injection Network & Early Production Facility
  • Established open and professional relationships with team members to achieve quick resolutions for various issues.

On/Off Shore Senior Piping Engineer

Amal Petroleum Company (AMAPETCO),Cheiron J.V
08.2015 - 08.2017
  • Contract Type: EPCI
  • Sub-Contractors: PPIS, AQUETERA COMPANY, PMS, PETROJET
  • Scope of Work: Installation of production, test, water injection, and gas lift headers to support production
  • Provision for Additional 10-Inch Pig Launcher: Providing space and infrastructure for an additional 10-inch pig launcher
  • New 1.3 km Pipeline: Installing a 1.3 km pipeline to transfer production from Platform-C to Platform-A, with provisions for a pig receiver
  • Pipe Concrete Coating: Applying 3-layer polyethylene concrete coating to 10-inch pipelines for protection
  • Equipment Crane: Crane equipment to service both Platform-B and Platform-C facilities
  • Sump Tank, Test Separator, and Personnel Shelter: Installing sump tanks, test separators, small personnel shelter, and storage
  • Well-head Control, Safety Panel, and Navigation Aids: Providing wellhead control systems, safety panels, and navigation aids for platform operations
  • Boat Landing, Helideck, and Bridge: Installing boat landing, helideck, and a bridge to connect Platform-C to Platform-B
  • Chemical Injection System, Power Generation, and Telecommunication: Installing a chemical injection system, power generation unit, and a microwave communication system
  • Improved piping system efficiency by conducting thorough analysis and implementing design modifications.
  • Optimized material usage for cost reduction by selecting appropriate materials and components for various piping projects.

On/Off Shore Piping Construction Engineer

Amal Petroleum Company (AMAPETCO),Cheiron J.V
01.2011 - 08.2015

Ras El-Dib Gas Oil Separation Plant (GOSP) & Offshore Platforms Amal Field Development Project (AFDP) Phase I & Phase II

Amal-A Platform – Key Responsibilities:

  • Supervised the commissioning & installation of topside facilities using various marine vessels, including Maridive Barge (MD-300), PMS-11 Barge, and PMS-12 Barge.
  • Led the commissioning & start-up of a 24”/16km hydrocarbon pipeline.
  • Managed the commissioning of a 4”/16km gas lift pipeline.
  • Oversaw the commissioning of an 8” pipeline between Amal-A & Amal-B platforms.
  • Directed the installation of two new deck extensions (50 tons & 20 tons) on the platform.
  • Supervised the well-head hook-up for wells Amal-9, Amal-10, Amal-11, and Amal-14.
  • Managed the replacement of old grating & stairs at the mezzanine deck of the platform.

Amal-B Platform – Key Construction Activities:

  • Led the fabrication & installation of an 8” pig launcher connected to the new 8” pipeline between Amal-A and Amal-B platforms.
  • Supervised the installation of 16 braces (20”, 16”, 14”, and 10”) at various levels, connecting them to conductor guides using SinoTharwa Offshore Rig (ST Bahari-1).
  • Managed the installation of three deck extensions on the platform using SinoTharwa Offshore Rig (ST Bahari-1).
  • Directed the hook-up of Amal-22 and modifications to the Amal-18 flowline.

Senior Mechanical Projects Engineer

Badr El Din Petroleum Company (BAPETCO), Shell J.V
08.2011 - 08.2013
  • Worked in a highly technical and challenging brownfield environment, providing expert technical support and advice to the Mechanical Department
  • Total Shut-down: Led the replacement of two old regeneration columns (34 meters height, 80 tons each)
  • Pre-Compression Project: Managed the installation of two 10 MW electric motor-driven compression packages to increase plant capacity (420 MMSCFD) and field reserves
  • Directed department planning, providing technical support to the Head of Projects in a high-demand environment
  • Managed contractors to ensure work was completed on time, within budget, and in line with company policies and standards
  • Oversaw the execution of projects, ensuring adherence to safety, quality, and project parameters
  • Supervised subcontractors and multidisciplinary construction activities for timely, efficient, and budget-compliant project delivery
  • Managed project risks, developing and implementing mitigation strategies
  • Ensured alignment and communication between internal and external stakeholders
  • Led construction activities during the Total Shut-down (21 days)
  • Conducted site meetings with construction and operational teams to monitor progress and resolve issues
  • Implemented cost-saving strategies to optimize new well installation timelines and budgets
  • Enforced compliance with HSE and quality policies for both staff and contractors

Piping Engineer

PETROJET (The Petroleum Projects and Technical Consultations Company)
07.2009 - 01.2011
  • Developed and implemented erection and installation procedures for an ultrasonic flow metering system
  • Led the dismantling, removal, and installation of metering skids and associated valves
  • Managed the removal and installation of old cables, control houses, and samplers
  • Oversaw the connection of control and power instrument cables to the metering house and junction boxes
  • Delivered pre-commissioning and commissioning services for various projects
  • Led the replacement of two regeneration columns (34 meters height, 80 tons each)
  • Coordinated the tie-in piping network for the pre-compression plant under construction, overseeing the replacement of over 500 valves and implementation of 50 plant modifications (FCP)
  • Directed fabrication and installation of new metering systems
  • Managed the upgrade of compressors A&B (FCP-239), replacing carbon steel pipes with duplex pipes and conducting hydro tests
  • Supervised the construction of several carbon steel transmission pipelines

On/Off Shore Piping Construction Engineer

Abu Qir Petroleum Company, (AQP)
01.2010 - 11.2010

Projects at Maadia On-Shore Gas Plant & Offshore Platforms:

  • Supervised flare system piping, valves, and flare panel installation at A/Q (Executed by EMC).
  • Managed fabrication of conductor guides and platform modifications for new wells.
  • Led structural modifications and conductor guide installations (Executed by MARIDIVE ).

Education

Bachelor of Mechanical Engineering -

ZAGAZIG University, Zagazig, SHR
07.2009

Skills

  • Project Management: Planning & Execution, Change Management, Resource Allocation, Cost Control
  • Leadership & Organization: Team Leadership, Staff Development, Cross-Functional Collaboration, Conflict Resolution
  • Quality & Safety: Standards Compliance, Safety Monitoring, Quality Assurance, OSHA Compliance
  • Technical Proficiency: SAP, Microsoft Office Suite, SOLIDWORKS, Data Analysis, Blueprint Interpretation
  • Construction Expertise: Construction Supervision, Site Safety, Building Renovation, Heavy Lifting Operations
  • Personal Competencies: Critical Thinking, Problem-Solving, Flexibility, Teamwork, Negotiation

Languages

Arabic
Native language
Arabic
Proficient
C2
English
Upper intermediate
B2

Timeline

Offshore Site Manager - West El Burullus Petroleum Company, Cheiron J.V
07.2022 - Current
Deputy Construction Manager - Badr El Din Petroleum Company (BAPETCO), Shell J.V
01.2019 - Current
Mechanical Team Leader - Badr El Din Petroleum Company (BAPETCO), Shell J.V
06.2017 - 01.2019
On/Off Shore Senior Piping Engineer - Amal Petroleum Company (AMAPETCO),Cheiron J.V
08.2015 - 08.2017
Senior Mechanical Projects Engineer - Badr El Din Petroleum Company (BAPETCO), Shell J.V
08.2011 - 08.2013
On/Off Shore Piping Construction Engineer - Amal Petroleum Company (AMAPETCO),Cheiron J.V
01.2011 - 08.2015
On/Off Shore Piping Construction Engineer - Abu Qir Petroleum Company, (AQP)
01.2010 - 11.2010
Piping Engineer - PETROJET (The Petroleum Projects and Technical Consultations Company)
07.2009 - 01.2011
ZAGAZIG University - Bachelor of Mechanical Engineering,

Professional Development

  • Preparation Mastering Petroleum Agreement Course (2020)
  • Preparation Insights for Strategic Leaders Course (2019)
  • Preparation Effective Delegation Course (2019)
  • Preparation Coaching & Mentoring Workshop (2019)
  • Preparation Construction Project Management (2015)
  • Preparation Time Management (2014)
  • Preparation Running effective meetings (2013)
  • Preparation Construction Project Management at Oil & Gas Skills (2012)
  • Preparation Environment Management Systems (2010)
  • Construction Management and Administration (2009)

Familiarwith

Project Engineering, Mechanical Engineering, OSHA Standards, Materials Estimation, Contracts Management (FIDIC), Risk Management, Stakeholder Management, Quality Management, Piping & Fabrication, Emergency Shutdowns, Mechanical Troubleshooting, Commissioning, Mechanical/Electrical Instrumentation, Administration, Personnel Training, Key Performance Indicators, Construction Management, Sustainable Development.

Professional Development

  • Preparation Mastering Petroleum Agreement Course (2020)
  • Preparation Insights for Strategic Leaders Course (2019)
  • Preparation Effective Delegation Course (2019)
  • Preparation Coaching & Mentoring Workshop (2019)
  • Preparation Construction Project Management (2015)
  • Preparation Time Management (2014)
  • Preparation Running effective meetings (2013)
  • Preparation Construction Project Management at Oil & Gas Skills (2012)
  • Preparation Environment Management Systems (2010)
  • Construction Management and Administration (2009)
AHMED TARAKHANOffshore Site Manager