Duct SIZER
Adept at bid management and fostering supplier relationships, I significantly enhanced tender success rates and streamlined proposal processes at SIAC. My expertise in cost estimation and proposal writing, coupled with a proactive approach to client needs, resulted in improved efficiency and increased client satisfaction.
Studying Projects :
Al-Alamin Towers LD07 Twin Tower and LD04.
Main Cooling and Air Conditioning Station in the Administrative Capital of Egypt (80000 Ton Ref).
Taj City residential Building.
Zed West -ORA Development.
Studying Projects :
Work Experience:
1. Studying the project Specifications, Drawings, Bill of Quantities & Preparing the project budgetary.
2. Preparing and following up Request For information (RFI).
3. Identify and quantify cost factors, such as production time, materials, and labor.
4. expenses and Develop costing as part of the quotation process.
5. Preparing and following up Request for Quota (RFQ)
6. Receiving offers from various suppliers and subcontractors and preparing comparison sheets.
7. Preparing the break down for the BOQ items and ensuring that the pricing comply with the project requirements Carries out with vendors, suppliers, Sub-contractors to achieve the best price.
9. Provides Technical Support for Project Managers and Cost Controll.
10. Produces sufficient data for Variation Orders and Claims.
National Bank of Egypt -New Capital.
Capital-Med Medical City- Badr City.
Jotun Factory Phase Two.
Ahl Masr Hospital.
CFC Extension Mall.
Maddi Twin Tower.
Faisal Bank -New Capital.
Al-Almin University
Al-Alamin Towers
Site Supervision for MEP Work Included:
Responsibilities:
1-Tender for All Mechanical Works (Plumbing- Fire Fighting –HVAC-Generator).
2-Supervision and Technical support for all mechanical works on site.
3-Coordinate with consultants for review and approval shop drawings and site work updates.
4- Coordinate design and site works with working team engineers (structural, architecture and electrical).
5-Preparation of shop drawings and as-built drawings for site works.
6- Preparation of bill of quantities (BOQ) for customer and abstracts for contractors.
7- Study the tendering documents and Pricing mechanical items for proposal projects.
Responsibility of Variety Projects Like:
Dar masr residential building six buildings.
Dorret el karaz residential building four building.
Dorret el karaz social club changing room health club building.
El kayan battalion eleven building.
El Robeky central kitchen building- VIP building – clinic building.
El Gezira Swimming Pool – gym and spa building. Damanhur Military Hospital.
Adam farm.
Tolip hotel.
VIP hall Al haram.
1-Installation and operation of HVAC system, Installation and operation of Chilled pipes, chilled pumps and it’s Hookup.
2- Installation and operation of Fire Pumps Station, Fire and Water Tank, pipes Network, Fire Hose Cabinet, sprinkler and GAS systems.
3-Installation and Operation of Pipes Networks for Water Supply and Drainage.
4-Installation and Operation of Manholes and Inspection Champers and Site Networks.
5-Installation and operation of fixture units.
Site Supervision for HVAC Systems Including: Site Supervision for Firefighting System Included: Site Supervision for Plumbing System Included:
Technical Office Works Including:
Borg El-Brollos Hospital Site Works Including:
TON) , insulation and cladding all control work for HVAC System.
Installation and operation of fire pumps station (500GPM), fire water tank (200 m3), pipes network, fire hose cabinet (27 cabinet) and sprinkler (640 sprinklers).
1- Installation and operation of pipes networks for water supply and drainage.
2-Installation and operation of manholes and inspection champers and site networks.
3-Installation and operation of fixture units.
4- Installation and operation of kitchen, Laundry and sterilization room.
Installation and operation of medical gases station, medical gases pipes, Bed Head Unit (92 unit) & alarm devices and valve controller.
Supervision of Installation and operation of elevators (7 Elevator).
1-Quantities survey for all site works.
2-Coordinate with consultants for review and approval site work updates.
3- Coordinate drawings with engineers working team (structural, architecture and electrical).
4-Shop drawings and As-Built for site works.
5- Bill of quantities (BOQ) for customer and abstracts for contractors.
Mallawi Hospital Site Works Including:
1- Coordinate with consultants for review and approval site work updates.
2-Coordinate drawings with engineers working team (structural, architecture and electrical).
3- As Built for all mechanical site works.
4- Bill of quantities (BOQ) for customers and abstracts for contractors.
Installation and operation of fan coil units (126UNIT), air handling units (29 UNIT), chiller units (4 UNIT 220 TR), chiller pumps (5 Pump 560 GPM), fresh air fans (10 UNIT), exhaust fans (37 UNIT), duct Works (60 TON), insulation and cladding and all control work for HVAC System.
Installation and operation of fire pumps station (1000 GPM), fire water tank 400 m3), pipes network, fire hose cabinet (26 cabinet) and sprinkler (2000 sprinklers).
1. Installation and operation of pipes networks for water supply and drainage.
2. Installation and operation of manholes and inspection champers and site networks.
3. Installation and operation of fixture units.
Installation and operation of kitchen, Laundry and sterilization room
Bid management
Reading Develops Awareness.
Swimming Strengthens the Body.
Traveling Enhances Communication With All Cultures.
Duct SIZER
HAP
AutoCAD
Microsoft Office
Primavera
Business Writing Workshop
Business Writing Workshop
English Conversation Skills