Effective quality professional bringing proven success in driving continuous improvement initiatives in Quality Engineer roles. Focused and diligent with commitment to fostering corporate mission. Consistently acknowledged for implementing actionable initiative to reduce error rates and optimize company processes.
THE SENATE COUNCIL IS BUILT UPON 33 THOUSAND M2.ITS INCLUDED AGROUND FLOOR ,3TYPICAL FLOORS; AMAIN HALL ACCOMMODATES, 406 MEMBERS ,HALLS,SUITS,TERRACES FOR VIP S ,MEDIA AND JOURNALISTS BESIDES, A HUGE MEETINGS ROOM .THE BUILDING INCLUDES CAR PARK WHICH ACCOMMODATE 250 CARS.
construct the first phase of new mansoura corniche with length of 800 meters and work the back wall for wall the corniche and the roads leading to it with the work of drainage and seeding for cafeterias and bathrooms and finishing and handing over the client
tow tunnels for cars , the first tunnel from Port Said to Sinai and the other is vice versa. The project objective is to link between Sinai, East of the Suez Canal and Delta. Besides, it facilitates the movement of the passengers and goods from Sinai and having the inspired development for this region in parallel with the development of Sinai and Canal region.
The excavation works started in 2015; it includes 3 phases: planning, installation of the TBM according to the time schedule, its operation and finalizing the excavation works.
· The total length of the tunnel is 3930m and reached to 4830 by adding the entries and exits; it includes 2 lanes with 3.60m and the maximum depth is 57m under the Suez Canal.
· The external diameter of the tunnel reached about 12.6m; the internal diameter is 11.m level
Leadership Responsible collaborative character
completed