Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
Ahmed Sobhy  Soliman

Ahmed Sobhy Soliman

Summary

Senior Maintenance & Reliability proficient with 17 years of experience in (oil&gas) field attending multinational companies, with strong project management and problem solving skills,Area of technical expertise including maintenance, revamping,construction, commissioning,
project management,reliability data analysis , problem solving,effective communication skills during technical issues by tailoring to different audiences and senior management and assisting resources prioritization to ensure high quality maintenance.

Familiar with API standards, OREDA, PID. PFD

Overview

18
18
years of professional experience
1
1
Certification

Work History

Sr.Mechanical Reliability Engineer

EPROM / EGYPTIAN REFINERY COMPANY (ERC)
2021.12 - Current


Job Description:

  • Improve mechanical equipment reliability thought implementation of reliability engineering principles, techniques and tools, such as risk based maintenance (RBM) and root cause failure analysis (RCFA)
  • Coordinate with other maintenance divisions and operations in refinery to discuss, develop, review and mange mechanical equipment maintenance and reliability strategies
  • Contribute in development of predictive, preventive maintenance and procedures for all mechanical equipment plans and provide technical expertise for mechanical equipment maintenance activities as per international standards
  • Provide technical assistance and trouble shooting support for all mechanical equipment and ensure that all maintenance activities and procedures are align with reliability requirement
  • Work closely with other maintenance divisions to determine and predict mechanical equipment components life using appropriate reliability tools, such as failure mode effects and reliability analysis (FEMCA), mean time between failure (MTBF), mean time to failure (MTTF) to ensure extended operating life of rotating equipment
  • Provide technical advice with regards to searching for and preparing new mechanical equipment proposal and review equipment specifications, documents and drawings
  • Ensure keeping and maintaining and updating database of all historical data pertaining to mechanical equipment failures and assist in analysis failure data and prepare reliability test reports
  • Develop, mange and review maintenance strategy
  • Develop short / long term renovation plans / budget based on risk management of obsolescence equipment, approve and supervise engineering and design of modifications for all rotating equipment
  • Involved in equipment criticality study for entire the refinery
  • involved in RCM study for refinery equipment


Achievements:

  • Involved in ERC refinery Asset Criticality Study
  • Lead, Facilitate RCA process team and meetings for refinery mechanical equipment from worldwide OEM's like:-

- ELLIOTT EBARA (turbine, compressor, pumps)

- ITT GOULDS (boiler feed water pumps)

- KSB-RP pumps

- Aero-Mechenica (Blowers)

- SHIN-NIPPON (Pumps and turbine) ,ETC

Lead Rotating Maintenance Engineer

EPROM / EGYPTIAN REFINERY COMPANY (ERC)
2018.12 - 2021.12

Job Description:

  • Establish in conjunction with Maintenance a Rotating Equipment Preventive, Predictive, and Corrective Maintenance Programs.
  • Ensure that all new and existing rotating equipment installations and maintenance activities are completed in accordance with applicable standards
  • Make recommendations to implement/expedite repairs on failed rotating equipment.
  • Execute shutdowns and turnarounds procedures whether programmed or unexpected.
  • Develop and support procedures for routine repairs of rotating equipment i.e. "Major Rotating Equipment Repair Guidelines and Overhaul Procedure".
  • Contribute to the preparation of maintenance plans and budgets
  • Ensure the provision and management of the Two Years Spares for critical Mechanical equipment Ensure the provision of the Capital Spares for critical rotating equipment
  • Develop spare part strategy for new installations and oversee implementation. Also review spare part strategy for existing equipment as needed. Make recommendations to improve designs to
  • Manage and allocate resources (manpower, tools and equipment) to achieve successful project execution phases (pre commissioning, commissioning, EPC hand over, and performance test run until the normal operation)
  • Review specifications, bid packages, design and fabrication drawings, and recommend manufacturers for rotating equipment
  • Coordinate and supervise field repair contractors. Contribute in systematic root causes failure analysis (RCFA) and problem solving techniques

Achievements:

  • Develop 2 years spare parts for refinery rotating equipment
  • Develop maintenance documents(procedures,work instructions forms & check lists) according to international standard and best engineering practices
  • Develop spare parts inventory & database for refinery equipment
  • Develop lubricant inventory & database for refinery equipment
  • Develop service agreements required for refinery equipment
  • Mechanical seals interchangeability and inventory & budgetary plan for entire refinery equipment
  • AIR FAN COOLER interchangeability and inventory & budgetary plan for entire refinery equipment
  • COUPLING interchangeability and inventory & budgetary plan for entire refinery equipment
  • Develop Consumables inventory & budgetary plan for entire rotating dept
  • Lead major overhauling for coke jet pump (RUHER PUMPEN)
  • Involved during dry gas seals replacement of hydrogen compressor (ELLIOT EBARA)
  • PULSATION DAMPENERS interchangeability and inventory & budgetary plan for entire refinery equipment
  • Troubleshooting breakdown for rotating equipment
  • Mechanical seal testing and troubleshooting and maintenance
  • Lead reverse engineering fabrication Supervision during catastrophic failure of vertical suspended (DICOW) pump till receiving genuine spares
  • Machine train alignment for critical equipment using (EASY LASER DEVICE)
  • Involved during major overhauling utilities cooling tower (RUHER PUMPEN) pump

Mechanical Maintenance Department Head

EMC / ENI / SOUTH OIL COMPANY (SOC)
2012.07 - 2018.11


Job Description:

WORKING SITES @ DGS (ZUBAIR MISHRIF/IPF - HAMMAR MISHRIF/IPF- RAFIDIA/RAFIDIA IPF- NORTH DGS)

  • Manage and lead senior mechanical engineers and technicians
  • Ensure quality of procedures during major overhauling of rotating & static equipment Prepare spare list for each rotating equipment as per drawings and data sheet Prepare mechanical seal spare parts for all pumps and follow up with vendors Prepare material list for static equipment as per data sheet
  • Prepare annual budget and calculate dry cost for the project variations
  • Ensure completion of scheduled protective and corrective maintenance to avoid backlog activities
  • Prepare spare parts stock for rotating & static equipment
  • trouble shooting for repeated failure


Achievements:

  • Follow up the progress of wells head modifications (FLARE LESS PROJECT)
  • Major overhauling for multi stages water injection pump BB5 (WEIR)
  • Major overhauling for multi stages water injection pump BB5 (SULZER)
  • Rehabilitation of (SHIN-NIPPON) double suction booster pump
  • Major overhauling for multi stages water injection pump BB5,OH2 (Goulds)
  • Major overhauling for crude oil export multi stages vertical VS6 (EBARA) pumps
  • Shaft straitness using hot spot method
  • Mechanical seals test and repairs
  • (lUFKEN) gear box overhauling
  • (KAISER) screw compressor overhauling
  • (COMP-AIR) reciprocating compressor major overhauling
  • (TMP) Termomeccanica water injection pump minor overhauling
  • Reverse engineering to provide spares for obsolete items
  • Supervise fire system modifications project to activate foaming system
  • Repairs for piping & static Equipment during shut down or online
  • PSV periodic calibration


Sr. Maintenance Rotating Engineer

EMC / SEGAS
2010.02 - 2012.07


Job Description:

- Perform preventive and corrective maintenance for mechanical items such as:

  • Pumps (over hang – OH2 & BB2 single impeller double suction and multi stages– vertical single & multi stages)
    BOIL OF GAS (BOG) Compressors
  • Induced and forced air fan cooler
  • Blowers
  • General Electric and Hitachi gas turbine by cleaning or changing (Mist eliminator, filters, lubes oil, replacing seal gas filters)


Achievements:

  • Gas turbine overhauling
    Assigned to work as supervisor during shutdown at
    Nuovo Pignone frame 7 gas turbine combustion inspection Overhauling
  • Compressors overhauling.
    Nuovo Pignone 3MCL1405 & BCL 804
  • Nuovo Pignone axial compressor AN200 rotor replacement
  • IHI reciprocating compressor (BOG) Overhauling

Rotating Team Leader

EMC / UHDE / MOPCO
2010.01 - 2010.02

Job Description:

Assigned to work for UHDE as man power rotating equipment Team Leader During plant shutdown to follow up overhauling of:-

  • MANTURBO Centrifugal compressor
  • GE Centrifugal Compressors 2BCL458 + 2BCL408

Achievements:

  • Achieved mechanical seal replacement for all compressors successfully
  • Achieved journal bearing, thrust bearing inspection
  • Achieved Replacing of damage parts (journal pads, thrust pads & labyrinth)
  • Achieved successful Replacing of degassing tank

Rotating Equipment Engineer

EMC / EMETHANEX
2009.01 - 2010.01

Job Description:

- Responsible for establishing Installation and pre-commissioning of all rotating equipment such as;

  • Pumps (KSB, RUHER, SUNDYNE)
  • Forced air fan cooler (COFIMCO)
  • Boiler blowers
  • Centrifugal compressors (SIEMENS)
  • Steam turbine (GE)

Achievement:

Mange over (300 pumps, 4 compressor, 60 air fan cooler, 1 steam turbine ) successfully installed and pre-commissioned

Rotating Equipment Engineer

EMC / TCI SANMAR
2008.07 - 2009.01

Job Description:

  • Follow up and supervise installation,commissioning of rotating equipment
  • Perform maintenance for equipment which defected during commissioning

Achievements:

  • Performed major overhauling for 5 hermetic pump (flowserve)
  • Achieved successful installation of 4 double suction cooling tower pumps

Maintenance Rotating Engineer

EMC / SEGAS
2007.08 - 2008.07


Job Description:

  • Perform protective and corrective maintenance for mechanical items such as:-
    Pumps (over hang – OH2 & BB2 single impeller double suction and multi stages– vertical single & multi stages)


Achievements:

  • Install anti rotation and modified bearing type for 190 induced air fan coolers (FBM HUDSON)
  • Contributed during Power gas turbine (HETACHI H25) hot gas pass inspection
  • Contributed during cryogenic pump (NIKKISO) major overhauling
  • Overhauling for different chemical injection dosing pumps (MILTON-ROY, NIKKISO, PERONI)

Rotating Maintenance Engineer

EMC / MIDOR
2006.12 - 2007.07


Job Description:

Perform protective maintenance for mechanical items such as:-

  • Forced air fan fan coolers
  • Pumps
  • Low power steam turbines


Achievements:

  • Contribute during major overhauling (SUNDYNE) Pumps (LMV312, P1500, LMV310, LMV320)
  • Replace carbon rings for 50KW (ELLIOT) steam turbine

Diesel Engine Maintenance Engineer

West Delta Main Work Shop
2006.08 - 2006.12

Job Description:

  • Perform protective and corrective maintenance for buses diesel engines
  • Assist senior engineer during diesel engines major overhauling

Achievements:

  • Involved in 10 successful major overhauling for diesel engines

Education

Bachelor's Degrees - Power Mechanical Engineering

Faculty of Engineering
Alexandria University
06.2006

Skills

  • Flexible and Adaptable
  • Collaboration
  • Conflict Resolution
  • Customer Service
  • Self-Motivated
  • Microsoft Office
  • Good listening skills
  • Excellent work ethic
  • Active Listening
  • Decision Making
  • Auto-cad (2D-3D)
  • SAP System

Certification

  • CAT I vibration analysis (mobius certified)
  • CAT II vibration analyses (mobius certified)
  • CMRB (SMRP certified)
  • Certified Asset Management Assessor (WIPAM certified)
  • Project Management Professional (PMP)

Languages

English
Advanced (C1)
A1
Italian
Elementary
A2

Timeline

Sr.Mechanical Reliability Engineer

EPROM / EGYPTIAN REFINERY COMPANY (ERC)
2021.12 - Current

Lead Rotating Maintenance Engineer

EPROM / EGYPTIAN REFINERY COMPANY (ERC)
2018.12 - 2021.12

Mechanical Maintenance Department Head

EMC / ENI / SOUTH OIL COMPANY (SOC)
2012.07 - 2018.11

Sr. Maintenance Rotating Engineer

EMC / SEGAS
2010.02 - 2012.07

Rotating Team Leader

EMC / UHDE / MOPCO
2010.01 - 2010.02

Rotating Equipment Engineer

EMC / EMETHANEX
2009.01 - 2010.01

Rotating Equipment Engineer

EMC / TCI SANMAR
2008.07 - 2009.01

Maintenance Rotating Engineer

EMC / SEGAS
2007.08 - 2008.07

Rotating Maintenance Engineer

EMC / MIDOR
2006.12 - 2007.07

Diesel Engine Maintenance Engineer

West Delta Main Work Shop
2006.08 - 2006.12

Bachelor's Degrees - Power Mechanical Engineering

Faculty of Engineering
  • CAT I vibration analysis (mobius certified)
  • CAT II vibration analyses (mobius certified)
  • CMRB (SMRP certified)
  • Certified Asset Management Assessor (WIPAM certified)
  • Project Management Professional (PMP)
Ahmed Sobhy Soliman