AMR ABDELMONIEM

FIT OUT ENGINEER
Cairo

Summary

Civil licensed professional experienced Architect with 7 years of distinguished experience in Fit-outs, management of high end residential, commercial and administrative projects, Detail focused and deadline-driven team player and project leader, with a driven technical knowledge in different fields.

Overview

6
6
years of professional experience
5
5
years of post-secondary education
3
3
Languages

Work History

Project Manager

Arab Consulting Engineers (ACE) Moharam Bakhoum
06.2023 - 01.2024

Projects:

- AZAD Mosque

Project stakeholders:

- Developer: TAAMER

- Contractor: MAGAZ

-Management&Consultant: ACE

My Role:

  • Management and coordination of a Mosque construction project, leading communication between the owner (TAAMER), main contractor, consultants, and suppliers.
  • Led the team to achieve seamless project execution, ensuring all deadlines and milestones were met.
  • Handled project documentation, variation orders, RFIs, snagging, and final handover process.
  • Oversaw day-to-day site operations, ensuring smooth progress and alignment with design intent, quality standards, and timelines.
  • Considered and managed the project schedule, tracked milestones, and handled critical path issues to maintain progress.
  • Facilitated weekly site meetings with all stakeholders, documenting actions, resolving site issues, and pushing execution forward.
  • Reviewed and approved shop drawings, materials submittals, and coordinated architectural and MEP works.
  • Supervised finishing works and site detailing to ensure high-level craftsmanship and adherence to architectural requirements.

Senior Architect Consultant

Arab Consulting Engineers (ACE) Moharam Bakhoum
01.2021 - 05.2023

Projects:

- Living Stream compound at CFC (fully finished)

- Aura Apartments at CFC (fully finished)

- FL Club House at CFC (fully finished)

- Oriana Villas at CFC (core & shell)

Project Stakeholders:

- Developer: ALFUTTAIM Group

- Contractor: GAMMA

- Cost Control: Triple A

- Project Management: EGIS

- Project Consultant: ACE

My Role:

  • Reviewed and validated architectural drawings, ensuring design compliance with codes, regulations, and sustainability standards.
  • Review and certify the payment certificates for the general contractor activities on monthly basis.
  • Advised clients and project teams on spatial planning, design intent, material selection, and functionality aligned with project goals.
  • Responsible for all finishing activities such as but not limited to block work , plastering, false ceiling, gypsum walls and painting, cladding, tiling and marble works, parquet flooring, landscaping and curtain walls.
  • Preparing weekly and daily target schedules for all type of activities.
  • Managed client relationships through regular check-ins and updates on project progress.
  • Coordinated with multidisciplinary teams (MEP, structural, ID, landscape) to resolve design conflicts and maintain design integrity.
  • Oversaw design quality during site execution, providing guidance and approval for architectural finishes and detailing.
  • Represented the client in design coordination meetings, aligning consultants and contractors with the architectural vision.
  • Provided value engineering solutions without compromising aesthetics or user experience.

Fit-Out Executive Engineer

The Waterway Residential & Commercial, 5A Project
03.2019 - 12.2020

Projects:

- (5A) Outdoor Mall: Consisting of eight building in harmony with middle pathways on a 27,000 m2 land area serving commercial, administrative and retail areas.

- The Drive project: one unique project that was executed in only 6 month duration, the main concept behind this project is for users to have a different experience by moving in along all the existing shops, getting all what they need without getting out of their cars, the project was built up of fully finished-ready to move steel containers.

Project stakeholders:

Developer: The WaterWay

Designer: Raef Fahmy

Contractor: The WaterWay

My Role:

  • Coordinates and monitors with subcontractors for their daily construction activities and their obligations and liaison with subcontractors.
  • Preparing daily and weekly site target schedules for all types of activities.
  • Review and certify the payment certificates for all subcontractors.
  • Supervision and coordination of general foreman areas of responsibility and the allocation of work areas.
  • Managed site inspections, material approvals, and compliance with quality standards.
  • Conducted quantity take-offs, material tracking, and progress reporting to project management.
  • Resolved on-site technical issues in real time, supporting continuity of works and minimizing disruptions.
  • Reviewed and redlined shop drawings, coordinated changes with design and MEP teams.
  • Monitored finishing works to ensure alignment with interior design intent and quality.
  • Participated in snagging and handover process, ensuring punch list items were closed efficiently.

Design and Site Engineer

Aldar Office
08.2017 - 12.2018

Projects:

Working on Different private building, villas and factories starting from design to turn key service as the company is providing a full service of design and construction process, starting from excavation till finishing phase and ending up all the paper work with government agencies, to be ready for handing over to the client.

My role

  • Handling and working on all project phases starting from the excavation process till client handover.
  • Co-ordination between different sectors to maintain governmental competent authority recommendations.
  • Coordinates and monitors with subcontractors for their daily construction activities and their obligations and liaison with subcontractors.
  • Supervising along with the contractor the construction site.
  • Review and certify the payment certificates for the subcontractors.
  • Carry out the specified inspection/test in accordance with relevant inspection/test plans, including the works of the subcontractors.
  • Overall, supervision and coordination of General Foreman areas of responsibilities and the allocation of work areas.
  • Review requirements of the specification and relevant standards and ensure understandings and compliance of work done with the specified requirements and as per approved drawings.

Education

Bachelor Degree - Civil Engineering

German University in Cairo (GUC)
01.2013 - 01.2018

Skills

Leadership and Team Coordination

Problem solving on site

Attention to details

Communication and Negotiation skills

Multitasking in Fast-Paced Environment

Adaptability and Solution-oriented

Software Programs

  • AutoCAD
  • M.OFFICE
  • SAP2000
  • SAFE
  • REVIT
  • 3ds MAX

Activities

  • Head of External public relations (EPR) at AYB-GUC student activity.
  • Events planning and organization.
  • Strong knowledge about furniture manufacturing and carpentary works
  • Continously updated on market new materials and finishing techniques

Timeline

Project Manager

Arab Consulting Engineers (ACE) Moharam Bakhoum
06.2023 - 01.2024

Senior Architect Consultant

Arab Consulting Engineers (ACE) Moharam Bakhoum
01.2021 - 05.2023

Fit-Out Executive Engineer

The Waterway Residential & Commercial, 5A Project
03.2019 - 12.2020

Design and Site Engineer

Aldar Office
08.2017 - 12.2018

Bachelor Degree - Civil Engineering

German University in Cairo (GUC)
01.2013 - 01.2018
AMR ABDELMONIEMFIT OUT ENGINEER