Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ayman Mohamed Elsayed Selim

QAQC Manager
Giza

Summary

Experienced Quality Assurance Quality Control (QA/QC) Manager with a demonstrated history of working in the construction, energy industry, MEP works, infrastructure and fabrication workshop. Skilled in Microsoft programs, Quality Assurance, Construction, English, auditing, corrective actions, KPIs, management review, team leader ship, risk assessment, management system, communications, continual improvement, well-developed problem-solving skills negotiation, analytic and Management skills. Strong engineering professional graduated from Mechanical Engineering Assiut University. On the other hand, I’m a master business administration (MBA) holder, certified lead auditor IRCA ISO-9001, certified CWI Certified Welding Inspector 15012211 also I’m certified ASNT Level II VT, UT, MT, PT, RT.

Overview

18
18
years of professional experience

Work History

QAQC Department Manager

Energy & Contracting Solutions Co. (ECS).
12.2020 - Current

· Established the company integrated management system (IMS) which is considered as a large-scale management system consisting of construction, trading and operation and maintenance business units as per ISO 9001-2015, ISO 14001 & ISO 45001 requirements and got the company ISO certified company after I had conducted gap analysis for all company departments, and recommended improvements and some tailoring for the existing process to be acceptable as per ISO standards requirements.

· Implemented and maintained the system by managing regular internal auditing program including audit scope, criteria, time frame, auditors and auditees, using internal auditees have been selected and trained by myself as I’m a certified lead auditor IRCA ISO-9001.

· Reported all the internal audits result after analysis, effectiveness and alignment of the management system with the strategic direction of the organization, any change in company context” interested parties’ expectations, internal and external issues”, and reviewed and followed up all the management review outputs.

· Conducted (IMS) regular awareness to all company employees especially department managers.

· Managed and trained QC staff for all company construction projects resulting in a 97% approved product had been handed over to the client and consultants, and reduction of external NCRs and customer complaints by 20%.

· implemented preventive measures and corrective actions using a suitable root cause analysis tool for non-conforming products.

· Monitored all company projects KPIs on a monthly basis and reported to the top management by QC monthly report demonstrating the approval percentage for IRs, MIRs, NCRs, conducted tests, MARs, shop drawings and As Built drawings.

· Handed over (TOC) 6 projects to the client as per project closeout procedure by submitting all relevant As Built, O&M, spare parts, training, etc.

· Managed third party audit program; certification, surveillance and recertification. communicated with the certification body, followed up audit conduction, closing the NCRs and CARs status (if any).

· participated setting the required Company objectives, Risk and opportunities annually to relevant functions and levels within the company departments based on company strategic direction.

· Helped tender team during projects bid stage by some cost estimations and break down relating to quality, issue of quality policies and procedures as issued for tender docs, participate primary/tender project baseline from quality point of view.

List of projects:

· NEW GIZATEACHING HOSPITAL

· NEW GIZA CLINICS HEALTH PARK B01 & B02

· NEWGIZA HEALTH PARK INFRASTRUCURE & UTILITIES BUILDINGS.

· Bahya Foundation for Early Detection & Treatment of Breast Cancer Hospital @ Sheik Zayed City.

· Mehwar Specialized Orthopedic & Trauma Hospital @ 6th October.

· Bureau 58 Office Building

· CAIRO BUSINESS PARK

· ETAPA-INFRA PROJECT

· MINAPHARM PHARMACEUTICALS (BIO-FACTORY_GROUND FLOOR).

· LEVEN SQUARE MALL PROJECT.

· Sheraton Montazah Hotel renovation Project @ Alexandria City.

· ZAHA PARK MALL

QA QC Project Manager

Energy & Contracting Solutions Co. (ECS).
04.2020 - 12.2020

· Managed and trained QC staff resulting in a 98% approved product had been handed over to the client and consultants, and reduction of external NCRs and customer complaints by 20%.

· Established and maintained criteria for monitoring and controlling all project MEP construction activities against the project quality plan which was developed by myself as per project specs and all applicable codes.

· Initiated all quality control procedures and policies to avoid repairs and reworks.

· Planned and initiated the project inspection process as per an approved ITP to eliminate any deficiencies.

· Conducted regular awareness for quality policies and procedures to all project personnel especially department managers.

· Selected project subcontractors after reviewing their management system according to our contract requirements and ensured their performance via quarterly basis evaluation.

· Conducted in a weekly basis meeting with QC team and construction team which increased IRs approved percentage to 98% from first time.

· Conducted root cause analysis for most occurred findings which was detected by Pareto charts resulting in reducing external NCRs by 20%.

· Managed offsite inspection process (FAT), which resulted in 100% material inspection request approval specially for electrical equipment.

· Conducted and maintained all measuring equipment calibrated.

QA QC Mechanical Team Leader

Orascom Construction Ltd
03.2019 - 04.2020

· Managed and trained QC staff resulting in a 95% approved product had been handed over to the client and consultants, and reduction of external NCRs and customer complaints by 50%.

· Established and maintained criteria for monitoring and controlling all project MEP construction activities against the project quality plan which was developed by myself as per project specs and all applicable codes.

· Initiated all quality control procedures and policies to avoid repairs and reworks.

· Planned and initiated the project inspection process as per an approved ITP to eliminate any deficiencies.

· Conducted regular awareness for quality policies and procedures to all project personnel especially department managers.

· Evaluated subcontractors’ performance via quarterly basis evaluation.

· Conducted in a weekly basis meeting with QC team and construction team which increased IRs approved percentage to 98% from first time.

· Conducted root cause analysis for most occurred findings which was detected by Pareto charts resulting in reducing external NCRs by 20%.

· Managed offsite inspection process (FAT), which resulted in 100% material inspection request approval specially for electrical equipment.

· Conducted and maintained all measuring equipment calibrated.

QA QC Mechanical Team Leader

Orascom Construction Ltd.
05.2017 - 03.2019

· Managed and trained QC staff resulting in a 100% approved product had been handed over to the client and consultants, and reduction of external NCRs and customer complaints by 50%.

· prepared and maintained all QC records for the boilers of two modules HRSG no 11,12,31&32 in accordance with the standards, codes, PQP, SIEMENS project specifications and Nem specifications.

· reviewed and evaluated the Italian subcontractor's (ELEKROM) Quality manual, inspection and test plan, QAQC procedures and method statement.

· Reviewed welding procedure (WPS) and performance qualification, Materials checking, Welding NDT examinations, Calibration control of all tools and equipment, Preheat and PWHT following, witnessed hydro and pneumatic test.

· Prepare the End of Erection files.

QA QC Senior Mechanical Engineer

Orascom Construction Ltd.
08.2016 - 05.2017

· Followed up all activities of fabrication, painting, packing and shipment in accordance with EN standards, GB Chinese standards, and FLSmidth specification for the project plate works in China and then delivered to Algeria. At three workshops at three different cities in China

1) Nantong Hongbo Machinery Co. Ltd. NANTONG City – CHINA

2) Shanghai K.en Machine Manufacturing Co. Ltd –CHINA

3) UP workshop at NANTONG City – CHINA

QA QC Senior Mechanical Engineer

Orascom Construction Ltd.
04.2014 - 08.2016

Followed up all QC activities of (HVAC, Fire Fighting, child water piping welding, plumbing & Steel Structure) in accordance with the project’s specification and SHAKER consultant specification. Supervision of all firefighting system sprinkler, fire hose cabinet, fire hydrant. gas system FM200, CO2, NOVEC, fire trace and Foam system. HVAC system including chiller room, cooling tower, ETS room, AHU units, FC units, duct work. Infrastructure network (drainage, water supply, and firefighting). Water supply system PPR pipes. Drainage system UPVC, PVC, UV, HDPE pipes.

  • Managed construction administration and value engineering processes.

QA QC Mechanical Engineer

Orascom Construction Industries Of Algeria
10.2013 - 04.2014
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Wrote and revised quality procedures.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Followed up all QC Mechanical activities of Shutdown modifications work of Terga Combined Cycle Power Plant 3×400MW in Algeria. Including preparing of all the QC documents ITPs, procedures, method statement and all QC records, Reviewing and performing welding procedure and performance qualification, Materials checking, Welding NDT examinations, Calibration control of all tools and equipment, Preheat and PWHT following, Witnessing hydro and pneumatic test, Prepare the End Of Erection files, Steel structure work, Follow up any modification during outage.

QA QC Mechanical Engineer

MEGA Construction And Industries
02.2013 - 10.2013

Materials checking, Reviewing and performing the welding procedure qualification, Reviewing and performing the welders performance qualification, Welding, NDT examinations, Painting, QC procedures and ITPL review and following up, Prepare daily welding records, Calibration control of all tools and equipment, Preheat and PWHT following, Performing and witnessing of hardness testing portable instruments (Vicker hardness & pin Brinel HB), Positive materials identification (PMI), Witnessing hydro and pneumatic test, Prepare the End Of Erection files, Firefighting network

QA QC Mechanical Engineer

Orascom Construction Industries Of Algeria
01.2011 - 02.2013

Followed up all QC activities in accordance with the standards, Alstom specifications, project specification, AWS D1.1 and ASME code including: Materials checking, Reviewing and performing the welding procedure qualification, Reviewing and performing the welders performance qualification, Welding NDT examinations, QC procedures and ITPL review and following up, Prepare daily welding records, Calibration control of all tools and equipment, Preheat and PWHT following, Performing and witnessing of hardness testing portable instruments (Vicker hardness & pin Brinel HB), Positive materials identification (PMI), insulation and painting touching up inspection, Witnessing hydro and pneumatic test, installation inspection of all Mechanical equipment rotary and static ( alignment, parallelism, location & fixation ), Prepared the End Of Erection files, Followed up any modification during outage.

QA QC Mechanical Engineer

National Steel Fabrication Co./Orascom Construction
02.2007 - 12.2010

Fabrication in workshop. Two water tube Boilers WT type (2×250MW) Cairo west power station project with BABCOOKHITASHI Company. And two heat recovery steam generators Boilers HRSG type (2×750MW) Nubaria power station project with STF Company. Steel structure, plate work and pressure vessel fabrication for many projects but not limited to.

I. Nile sugar project.

II. Ezz Continuous casting machine &Bar Mill.

III. EL Merk Oil & Gas facilities project.

Serfert fertilizer project

Mechanical and Maintenance Engineer

Fine Trade Co.
10.2005 - 01.2007

Reviewed and followed the WPS, reviewing performance qualifications, checking the activities prior to welding, Checking in and post process activities. Visual inspection, performing the required NDT. Maintenance for all Mechanical equipment at hospital including compressors, boilers, Landry washing machines, kitchen furnaces, pumps, gas room, kitchen refrigerators.

  • Performed troubleshooting and repair for complex electrical equipment.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.

Education

Bachelor of Science - Mechanical Engineering, Power Section

Assiut University
Assiut, Egypt
04.2001 -

Skills

    Policy Development

undefined

Timeline

QAQC Department Manager

Energy & Contracting Solutions Co. (ECS).
12.2020 - Current

QA QC Project Manager

Energy & Contracting Solutions Co. (ECS).
04.2020 - 12.2020

QA QC Mechanical Team Leader

Orascom Construction Ltd
03.2019 - 04.2020

QA QC Mechanical Team Leader

Orascom Construction Ltd.
05.2017 - 03.2019

QA QC Senior Mechanical Engineer

Orascom Construction Ltd.
08.2016 - 05.2017

QA QC Senior Mechanical Engineer

Orascom Construction Ltd.
04.2014 - 08.2016

QA QC Mechanical Engineer

Orascom Construction Industries Of Algeria
10.2013 - 04.2014

QA QC Mechanical Engineer

MEGA Construction And Industries
02.2013 - 10.2013

QA QC Mechanical Engineer

Orascom Construction Industries Of Algeria
01.2011 - 02.2013

QA QC Mechanical Engineer

National Steel Fabrication Co./Orascom Construction
02.2007 - 12.2010

Mechanical and Maintenance Engineer

Fine Trade Co.
10.2005 - 01.2007

Bachelor of Science - Mechanical Engineering, Power Section

Assiut University
04.2001 -
Ayman Mohamed Elsayed SelimQAQC Manager