Summary
Overview
Work History
Education
Skills
Languages
Work Availability
Quote
Timeline
Generic
Basma Yousry Oraby

Basma Yousry Oraby

Cairo

Summary

Throughout my career as an electrical engineer, I have gained valuable experience in various roles such as project engineer, technical officer, and site engineer. I have successfully managed and supervised electrical installations in various facilities. I am committed to continuous learning and development to enhance my expertise and practical skills, both personally and professionally. My ultimate goal is to utilize my scientific and practical knowledge to make significant contributions to organizations I engage with, benefiting them in the best way possible.

Overview

10
10
years of professional experience

Work History

Project Engineer (Renewal and Strengthening Depart

Electromechanical Projects Engineering
01.2022 - Current
  • Documented each project we worked on. with different teams.( technical specifications team, opening the technical and financial offers submitted for tenders team, the technical decision-making team and awarding tenders to the contractor who wins the tenders, supervision team on project implementation after the tenders are awarded).
  • Approving technical evaluations of engineering designs and test results for all project components at all stages
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Identified technical risks within managed projects and Assisted in finding solutions to problems.
  • Recommend improvements for design, construction means, and materials based on field or changing conditions.
  • Completed construction tasks while providing safe working conditions, staying on budget, and meeting project deadlines.
  • Assisting in preparing and approving inventory books related to project implementation according to specifications
    Reviewing the abstracts and approving them with actual implementation rates and comparing them to the inventory books
  • Created detailed reports on engineering activities and findings.

Projects :

*As a member of the supervision team on a project, my responsibilities include overseeing the replacement and renewal of water lines in several areas. These areas include Al-Zawia Al-Hamra, Al-Maliha, Selim Al-Awwal Street, Jisr Al-Bahr in Al-Sahel, and the branches of Shubra Street. I am also responsible for conducting necessary tests on all parts and pipes involved in the project.

*As a member of the technical specifications team, my responsibilities include assisting in setting technical specifications for various water lines in accordance with the Egyptian Code for Water and Sanitation Networks. Additionally, I participate as a member of the committee for deciding and awarding tenders, prepare the final technical report, and am often a member or head of the team for opening technical and financial offers for many of the tenders offered. Ultimately, my role involves evaluating the tenders and awarding them to the contractor who meets the necessary requirements.

Electrical Project Engineer(Electromechanical Dep

Electromechanical Project Engineer
11.2015 - 01.2022

●Project Planning, approval for all electrical equipment and components, Reviewing project scope, objectives, deliverables, and timelines., establishing project budgets, resource requirements, and risk assessments. Also make comparison sheets for different suppliers, coordinating with them to update the offers according to the RFQ and quality accepted.
●Collaborate with design and engineering teams to develop project specifications and drawings that meet regulatory standards, safety requirements, and environmental considerations.
●As a project overseer, ensure compliance with local, state, and federal regulatory agencies. This includes obtaining all necessary permits and approvals for the project.
●Managing project budgets, tracking expenses, and ensuring cost control measures are in place. Identifying and mitigating cost overruns and deviations from the budget. making invoices for contractors.
●Allocating human and material resources effectively to ensure that project tasks are completed on schedule. This may involve coordinating with subcontractors and suppliers.
● Implementing quality control measures to ensure that the construction and installation work meets the specified standards and project requirements. Conducting inspections and audits as necessary.
● Identifying potential risks and issues that may affect the project's progress or outcome. Developing risk mitigation strategies and contingency plans.
●Tracking progress. Adjusting schedules as needed to accommodate changes or unforeseen circumstances.
● Facilitating effective communication among project team members, stakeholders, and clients. Providing regular updates on project status, milestones, and any issues that may arise.
● Ensuring that safety protocols are followed throughout the project to protect the well-being of workers, the environment, and the public. Conducting safety audits and promoting a culture of safety on the project site.
● Maintaining accurate project documentation, including contracts, change orders, drawings, specifications, and project reports. Ensuring that all project records are organized and accessible.
● Addressing technical challenges and resolving issues that may arise during the project. Collaborating with the engineering and construction teams to find practical solutions.
● Building and maintaining positive relationships with clients, addressing their concerns, and ensuring their satisfaction with the project's progress and outcome.
● Overseeing the commissioning process to ensure that the completed water infrastructure functions as intended. Preparing for project handover to the client or operational teams.

PROJECTS :-
➢International park water booster(2015-2016)

Supervising the implementation of a water booster for the International Garden of Emaar Company to supply their compound.

➢ Al-Amiriya Water Plant.(2016-2021)

- Supervising the renovation and replacement of four pumps, each equipped with MV motors, cables, soft starts, electrical panels, and connecting pipes inside and outside the raw water building.

-Supervising the renovation and replacement of various buildings including the mosque, warehouses, fingerprint room, laboratory, and security room, specifically overseeing electrical works.

-Supervising the renovation and replacement of the main filters building with have completely change where the old filters were completely replaced, including pipes, valves, motors, and blowers, and comprehensive work, changing all filter tables and connecting them to the PLC system.

-Supervising the renovation and replacement of some mechanical campaign work, street lighting, and landscaping works.

-I am overseeing the renovation and replacement of the Chlorine buildings and stores in the old station, the expansion. This includes expanding the facilities and constructing new Chlorine extermination buildings, complete with a modern Chlorine extermination system. We are also converting the doors from manual to automatic and linking them to the new system to execute Chlorine and control any potential leaks. Additionally, we are installing special modern devices inside the Chlorine buildings to measure Chlorine behavior and flow. To meet the requirements of the Civil Defense, we are also creating a network of escape doors.

-As part of the station's rehabilitation work, the implementation of electrical works was supervised multiple times in order to obtain the TSM certificate in stages. It was successfully obtained two times in a row.

-Supervising the implementation of safety and quality procedures for light current works related to planet fence lighting, outlet, and camera system connections.

➢Electromechanical Department, Projects Sector(2021-2022)


Junior Electrical Design Engineer

Al-Dar Al-Hindasi (Dr. Mahmoud Abdel Azim)
01.2015 - 10.2015
  • Created CAD models and drawings for designs.
  • learn different design options in order to fulfill the project's needs.
  • Designed and approved power distribution requirements for facility construction.
  • Designed electrical products and systems based on client briefs.
  • Assisted in installation of electrical systems and components for commercial and industrial applications.

Fresh Graduate Electrical Engineer

Horse Engineering And Contracting Company
10.2013 - 08.2014

Having a good understanding of the labor market is important, as it helps distinguish between academic study and working life.

Education

Bachelor's Degree in Electrical Engineering - Power And Electrical Machine

Shubhra Faculty of Engineering, Banha University
Cairo , Egypt
05.2013

Skills

  • Budget Development
  • Project Bidding
  • Contract Management
  • Document Management
  • Requests for Information (RFIs)
  • Risk Management
  • Feasibility Reviews
  • Lean Manufacturing Principles
  • Editing Documents
  • Ability and willingness for teamwork
  • Problem-solving
  • Relationship Management
  • Communication and Presentation
  • Software skills
  • Continuous Professional Development
  • Negotiation
  • Attention to detail
  • Sales and Marketing
  • Site Visits

Languages

Arabic
Native language
English
Intermediate
B1

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

Happiness can be found even in the darkest times when only remember to turn on the light
Albus Dumbledore

Timeline

Project Engineer (Renewal and Strengthening Depart

Electromechanical Projects Engineering
01.2022 - Current

Electrical Project Engineer(Electromechanical Dep

Electromechanical Project Engineer
11.2015 - 01.2022

Junior Electrical Design Engineer

Al-Dar Al-Hindasi (Dr. Mahmoud Abdel Azim)
01.2015 - 10.2015

Fresh Graduate Electrical Engineer

Horse Engineering And Contracting Company
10.2013 - 08.2014

Bachelor's Degree in Electrical Engineering - Power And Electrical Machine

Shubhra Faculty of Engineering, Banha University
Basma Yousry Oraby