Summary

Resourceful qualified Civil Engineer with 12 years of expertise in multi-disciplinary Construction projects, financial oversight and resource management to achieve smooth flow and project operations.

Expert in directing workflow of earth and concrete works, underground utility installations, EPC projects and green and brownfield project demolitions .Proven success in identifying and addressing challenges to complete projects on-time and under budget.

Applies cost-saving strategies without sacrificing practicality and quality.

Manages large projects and teams to meet milestones and exceed quality expectations.

Overview

12
12
years of professional experience
6
6
Certifications
3
3
Languages

Work History

Projects Manager

Egypt Gas
1 2020 - Current
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Managed projects from procurement to commission.
  • Planned, designed, and scheduled phases for large projects.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Reported regularly to managers on project budget, progress and technical problems.

Site Engineer

General Construction "Rolin"
8 2014 - 4 2018
  • Site activities inspection and approval release for the next activity.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Oversaw quality control and health and safety matters for construction teams.
  • Suggested process and technical design changes to improve performance and efficiency.
  • Identified and resolved potential structural issues.

Technical Office Engineer

Nadinco Construction
09.2019 - 01.2020
  • QS, Shop drawings and invoices preparing and submitting.
  • Site paper works and inspection requests follow up.
  • Daily, Weekly and Monthly reports preparing.
  • Produced reports on success rates and remedial requirements.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.

Technical Office Manager

El-Akkad for Engineering Works
04.2018 - 09.2019
  • ٍSupervising and submitting created reports, presentations and other materials for owner and consulting office.
  • Reviewing shop drawings, invoices, construction reports and RFI reports before submitting for approval.
  • Provided detailed project status updates to stakeholders and executive management.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Negotiated contracts with suppliers and subcontractors to confirm fair pricing and quality service.

Site Engineer

El-Shafai Contracting
05.2014 - 08.2014
  • Close supervising and inspecting all site activities.
  • Follow up with owner representatives for handover works.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.

Site Consultant Engineer

Shawconsult Consultant Office For Integrated Works
12.2013 - 05.2014
  • Verified construction documentation to meet client requirements and vision.
  • Assisted drafters in developing structural design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
  • Published technical reports on structural conditions, repair cost estimates and corrections required to meet local building codes.
  • Inspected and evaluated existing buildings for structural deficiencies and code violations.

Education

Bachelor of Engineering - Civil Engineering

Faculty of Engineering, Alexandria University
Alexandria, Egypt
09.2008 - 2013.11

High School Diploma -

MGS Language School
Alexandria, Egypt
09.2005 - 2008.05

MBA - Project Management

Arab Academy For Science, Technology
Alexandria, Egypt
04.2001 -

Skills

SAP–Excel – Primavera - SketchUp

Additional Information

Projects Construction Manager for :

· ELAB new area expansion project with a total construction cost of 800 million Egyptian pounds. "current project"

- Earth works and concrete foundations "piles".

- Construction of new four jet/ kerosene storage tanks with 5500 M3 capacity.

- Modifying two existing tanks into an internal floating roof with nitrogen blanketing system.

- Civil works for tanks and pumps, dike walls, warehouse, pump station shed, steel pipe rack, guard house, pipe supports, fence and paving.

- Construction of process piping.

- Loss prevention systems (Fire fighting & Fire and gas detection system)

- Power and electrical works.

- Instrumentation & controls works.

- Water supply & Drainage networks.

- CCTV system.

- telecommunication system.

· BAPETCO station relocation "Relocate a live metering plant with a total construction cost of 170 million Egyptian pounds .

- Earth works and soil replacement for the project area location of 10000 M2.

- Construction and finishing of a new control room, warehouse, security, and telecom buildings.

- Construction of the relocated facilities' concrete foundations.

- Construction of new utility areas for generators, compressors, and air vessels.

- Construction of a new pipeline network with 24, 30, and 34-inch diameters.

- Construction of a 6m depth HOT TAP and STOPPELING Pit on a two existing live under ground pipelines for the gas diverting .

- Dismantle and transport 120 M high telecom tower.

- Construct a new Temporary metering facility.

- Relocate the facilities (metering skid, PCVs, and control valves).

- Construction of new Elect. And Instrumentation networks.

- Construction of internal access track networks.

- Construction of lightning network.

- Construction of firefighting network.

- Construction of earthing network.

- Commissioning of the plant.

- Prepare and hand over the project packages.

· Raven Gases introduction facilities to Western Desert Gas Complex project - GASCO.

· Construction of the alternative warehouses for Egyptian Petrochemicals Company.

· Second stage for Instruments cables renovation inside Western Desert Gas Complex.

· Electrical power station “RTU3” & Western Desert Gas Complex fence Renovation.

· Installing “Raised floor, Cortega false ceiling” for existing control room and auxiliary room.

· Fire proofing works inside process area Western Desert Gas Complex.

· New Steel Structures inside process area “Western Desert Gas Complex”.

· Thermal insulation works inside Process area “Western Desert Gas Complex” “Shutdowns”.

· KP-3 “Valves room complex” renovation.

· WDGC Internal roads maintenance and Mosque renovation.

· Civil and steel maintenance works inside Western Desert Gas Complex & LPG factory.

· Sandblasting & painting works inside Western Desert Gas Complex, LPG factory & BAPETCO.

Technical Office Manager for :

· Constructing 7 buildings at Engineering Housing city-th group–Borg El Arab.

· Constructing 4 buildings at Engineering Housing city-th group–Borg El Arab.

· Finishing works of 5 building at Engineering housing city – Borg El Arab.

· Constructing 33 buildings at New Cairo Capital "R3"-"Tender 1,2,4"

· Constructing 213 Villas at “Il-Monte Galala” “El-Ain Elsokhna”.

Site Construction Engineer for :

· Restoration works at central bank of Egypt Alexandria branch.

· Restoration works at Nasser social bank Elfateeh-Tanta branch.

· Finishing works at Nasser social bank shabrabil-Tanta branch.

· Roofing works at central bank of Egypt Building Alexandria – Marakya.

· Finishing works at Telecom Egypt Ezbet saad branch.

· Finishing works at Telecom Egypt Altabia branch.

Certification

AutoCAD 2D

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Languages

Arabic
Bilingual or Proficient (C2)
English
Advanced (C1)
French
Beginner (A1)

Timeline

Technical Office Engineer

Nadinco Construction
09.2019 - 01.2020

Technical Office Manager

El-Akkad for Engineering Works
04.2018 - 09.2019

Site Engineer

El-Shafai Contracting
05.2014 - 08.2014

Site Consultant Engineer

Shawconsult Consultant Office For Integrated Works
12.2013 - 05.2014

Bachelor of Engineering - Civil Engineering

Faculty of Engineering, Alexandria University
09.2008 - 2013.11

High School Diploma -

MGS Language School
09.2005 - 2008.05

MBA - Project Management

Arab Academy For Science, Technology
04.2001 -

Projects Manager

Egypt Gas
1 2020 - Current

Site Engineer

General Construction "Rolin"
8 2014 - 4 2018
Eslam Hamd El-GharbawySenior Civil Engineer