Summary
Overview
Work History
Education
Skills
Currentposition
Computercourses
Militaryservice
Tel
Personal Information
Training
Personal Qualifications
Timeline
Generic
Ibrahim Sadek Ibrahim El-Shennawy

Ibrahim Sadek Ibrahim El-Shennawy

project manager
Tanta

Summary

Focused Electrical Engineer with background in power systems, automation and controls with +10 years experience in O&M projects. In-depth understanding of control and power-delivery systems. Experienced in developing technical studies and investigations.

Overview

10
10
years of professional experience
8
8
years of post-secondary education

Work History

Project Manager

Bossita Central Water Treatment plant
8 2019
  • The project consists of 30 wells with depths of up to 250 linear meters and a daily production of 90,000 m3 of water is desalination through a reverse osmosis desalination plant and then water is pumped to 3 distribution lines with diameters of 800 and 1000 mm so that water is distributed to 3 governorates containing 20 cities and villages The project also contains 9 pumping and lifting stations, and there are 15 backup generators that operate in emergency, and all components of the project are controlled by SCADA system

Senior commissioning (operation) engineer

El Sewedy power system projects
02.2018 - 08.2019

Technical office engineer

Sakan Al-Arabiyah (KSA)
05.2017 - 12.2017
  • Working for next projects. -Housing of Technical College for boys and girls (TVTC). -Repairs and Refurbishment for Prince Sultan Armed Forces Hospital (MODA). -Electrical section head for POMEC facility and Projects management (Study, design and execution of electrical works (main and emergency distribution boards, ATS panels, generators , lighting and power works and low current systems )and supervising the implementation of firefighting, fire alarm and HVAC projects) (EGYPT)

Electrical Engineer

POMEC
04.2015 - 04.2017
  • Maintenance and operation projects
  • Al-Dyar compound (Fifth district) supervising all electromechanical works
  • Executive projects
  • Design and execution of electrical and low current works for
  • UTC building (Fifth district).
  • Retro 1920 hotel and restaurant complex (Heliopolis).
  • EST building (Fifth district).
  • Four residential buildings in Zayed, October and fifth district.
  • Design and execution a part of lighting works AL-AHLY club landscape zayed branch. - Infrastructure Project Manager for execution of electricity networks and lighting in Sadat City .Giza Company for the transmission and distribution of power (EGYPT)

Electrical Engineer

Bin Sammar Contracting Company
06.2010 - 01.2015
  • Project Manager for Operation and Maintenance water projects in Northern Border (Stations and Wells) Generators, Motors, Control Panels and Distribution Panels
  • (Since6/2013 up to1/2015)
  • Bin Sammar Contracting Company
  • (KSA)
  • Electrical Engineer for Operation and Maintenance water projects in Northern Border (Stations and Wells) (2 years).
  • Electrical Engineer for Execution Turaif Strategy tanks and pumping station
  • (1 year)
  • Bin Sammar Contracting Company (KSA)

Electrical Engineer

Egypt Foods Company
08.2009 - 05.2010

Education

Electrical power and machines

Tanta University
04.2001 - 01.2009

Skills

Very good spoken and written English

Saudi driving license

Good knowledge of programming

Electrical experience

Power systems

Electrical safety standards

Team Leadership

Electrical design

Project Management

Extensive AutoCAD knowledge

Staff Management

Technical Support

Currentposition

Project Manager (Bossita Central Water Treatment plant), 08/2019, The project consists of 30 wells with depths of up to 250 linear meters and a daily production of 90,000 m3 of water is desalination through a reverse osmosis desalination plant and then water is pumped to 3 distribution lines with diameters of 800 and 1000 mm so that water is distributed to 3 governorates containing 20 cities and villages The project also contains 9 pumping and lifting stations, and there are 15 backup generators that operate in emergency, and all components of the project are controlled by SCADA system

Computercourses

  • ICDL Certificate
  • PLC (Programmable Logic Controller)
  • AutoCAD Course
  • Applications Of designed Electrical Installations using AutoCAD
  • Lighting programs (Dailux - Relux)
  • HVAC systems (design, maintenance and troubleshooting) and using HAP

Militaryservice

Exempted

Tel

  • 00201064238808
  • 00966508072687

Personal Information

  • Date of Birth: 08/26/1986
  • Nationality: Egyptian
  • Marital Status: Married
  • Religion: Muslim

Training

  • Internal summer training 2005 - 2006
  • External summer training 2007 (Delta spinning and weaving company)

Personal Qualifications

Bachelor of Engineering, 2009, Tanta University, Electrical power and machines, Pass, Induction Heat, Excellent

Timeline

Senior commissioning (operation) engineer

El Sewedy power system projects
02.2018 - 08.2019

Technical office engineer

Sakan Al-Arabiyah (KSA)
05.2017 - 12.2017

Electrical Engineer

POMEC
04.2015 - 04.2017

Electrical Engineer

Bin Sammar Contracting Company
06.2010 - 01.2015

Electrical Engineer

Egypt Foods Company
08.2009 - 05.2010

Electrical power and machines

Tanta University
04.2001 - 01.2009

Project Manager

Bossita Central Water Treatment plant
8 2019
Ibrahim Sadek Ibrahim El-Shennawyproject manager