JOHN WILLIAM TAWFIK

JOHN WILLIAM TAWFIK

Obour city

Summary

Follow To work for an organization which provides me the opportunity to improve my skills and knowledge to growth along with the organization objective Strategic Construction Manager with demonstrated success assessing project scope and adhering to deadlines. Safety-conscious and detail-oriented with [Number]-year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Construction manager

LMS Construction
01.2021
  • Follow up the sub-contractors for all civil works for the buildings from excavation to the final concrete structure
  • The building area 2500m2 consist of 9 floors post tension slabs
  • Preparing contractor payment request

Planning and follow up Manager

EEC Galva Engineering co. for metal Galvanization
01.2021 - 07.2021
  • Planning the process of production daily and the rate of production
  • Preparation of the item before the galvanization process
  • Manage the storage area for the factory(black and white store)
  • Manage the equipment’s of the factory
  • Manage the cost of the galvanization cycle and the zinc%

International shooting club (senior site engineer)

01.2017 - 12.2020
  • Civil works for the main gate, and the fence finishing works for the Administration Buildings finishing works for mosque 500
  • All civil works for protocol Building hard scape for shooting buildings: mosaic tiles, interlock, Fair face concrete, stands, ladders

BURULLUS POWER PLANT (4800 MW COMPINED CYCLE PROJECT) (senior site engineer)

01.2015 - 07.2017
  • Construction of all civil work related to power station, concrete, Combustion turbine ares, Steam turbine area, Gas turbine, Slab on grade, HRSG, Cooling towers, Transformers, Stacks, Power control center, Hydrogin building, Lift stations, Pull-pit and under-ground manholes, Compressor building, Landscape, Roads, rccp line, HDPE line, all driven and poured piles follow up 3 subcontractors project value 2 milliar €, Responsible for managing all construction and administration activities

Badr city & haykstep (site engineer)

02.2014 - 02.2015
  • All Finishing works for future city for 20 buildings Armed Forces officers housing and other project in Badr city consist of 20 buildings from civil works to finishing works

Damietta power plant (500MW) (site engineer)

08.2010 - 08.2012
  • Construction of all civil work related to power station, construction of piling, concrete, boilers, combustion turbine area, gas turbine, slab on grade, trenches, coolers, transformers, under-ground manholes, pulling chamber project value 345 million$, Responsible for managing all construction and administration activities on site

Abo-quir THERMAL POWER PLANT (2X650 MW GAS/OIL FIRED UNITS CIVIL WORK)1400MW (junior training site engineer)

08.2010 - 08.2012
  • Construction of all civil work related to power station, construction of piling, concrete, boilers, turbine area, Steam turbine, chimney, control building, water treatment area, utility, project value 1300 millions EGP, Responsible for managing all construction and administration activities on site

Education

Bachelor Degree of civil engineer -

Sherouk academy
07.2012

Skills

  • Microsoft Office package: Microsoft Word, Excel, Primavera, sap2000, AutoCAD, photoshop, risk assessment, Method of statement
  • Site Management
  • Construction management
  • Project Management
  • Construction safety
  • Team Building and Leadership
  • Scope Management

Disclaimer

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-menyioned particulars. Date : 1-2-2022

Certification

  • CM - Certified Manager Certification

animals and plants

i have achowchow and piknwah and 25 different type of plants

Timeline

Construction manager

LMS Construction
01.2021

Planning and follow up Manager

EEC Galva Engineering co. for metal Galvanization
01.2021 - 07.2021

International shooting club (senior site engineer)

01.2017 - 12.2020

BURULLUS POWER PLANT (4800 MW COMPINED CYCLE PROJECT) (senior site engineer)

01.2015 - 07.2017

Badr city & haykstep (site engineer)

02.2014 - 02.2015

Damietta power plant (500MW) (site engineer)

08.2010 - 08.2012

Abo-quir THERMAL POWER PLANT (2X650 MW GAS/OIL FIRED UNITS CIVIL WORK)1400MW (junior training site engineer)

08.2010 - 08.2012

Bachelor Degree of civil engineer -

Sherouk academy
JOHN WILLIAM TAWFIK