MS project
My master's degree from Coventry University United Kingdom; it's MSc in Engineering Project Management. My background is that I am an architecture engineering student who graduated in Spring 2019. I enjoyed learning at Arab Academy for Science and Technology, Cairo Campus at the architecture and environmental design department, A RIBA (part 1 & 2) validated school of architecture. I am interested in "Project and Enterprise Management" because I am interested in a career related to project management. I am specifically interested in how an engineer can successfully manage an enterprise or large projects .
Some execution works
Site coordination and supervision
Redesign the execution drawings by revit application
Presentation
MS project
Orcale Primavera P6
Autodesk Revit
Adobe Photoshop
Monday schedule
Autodesk Autocad
Edmundo simulation
Cesim project
Spatium
MSC Engineering Project Management
MSC Engineering Project Management
Princes 2 Agile foundation and practitioner
International project management ( Kiit University)
PRMG ( Project Management Professional)
Business model
Contract negotiation
Project planning and scheduling
Risk analysis
Cost control
Quality control
Stakeholder engagement
Change management
• Understand work scope, and quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
• Studying projects contract, and extracting the SOW.
• Preparing and following up on overall project baseline schedule
• Preparing WBS, and working with management, and the project team on the development of WBS for progress measurement, scheduling, cost estimating, and project control.
• Preparing, and managing overall master schedule integrating WBS using Primavera P6 software.
• Preparing cost estimation, and schedule bar chart plan considering all inputs (manpower, equipment, and materials) availability, production, and construction sequences.
• Developing, and updating resource (manpower and equipment) histogram weekly or monthly as required.
• Evaluating allocation of resources and providing recommendations to maintain required progress.
• Coordinating schedule for multiple projects, and incorporating information gathered into the overall project master schedule.
• Analyzing contractual matters, and earned value for projects.
• Developing, and implementing plan versus actual progress charts(histograms/S-curves).
• Tracking, monitoring, and forecasting progress of all activities and deliverables such as products, engineering documents, fabrication status, and construction of all disciplines.
• Preparing and updating three weeks, and one-month look-ahead schedule that reflects the priority activities.
Bidding Department
• Understanding work scope and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
• Preparing and following up overall project baseline schedule.
• Preparing WBS, and working with management, and the project team on the development of WBS for progress measurement, scheduling, cost estimating, and project control.
• Preparing, and managing overall master schedule integrating WBS using Primavera P6 software.
• Preparing cost estimation, and schedule bar chart plan considering all inputs (manpower, equipment, and materials) availability, and production .
• Preparing, and manage overall master schedule integrating WBS using primavera P6 software.
• Preparing cost estimation, and schedule bar chart plan considering all inputs (manpower, equipment, and materials) availability, production, and