Mustafa Abdull-Fattah

Mustafa Abdull-Fattah

Lead Mechanical Engineer.
123 Taaweneyat El.Nile,Faisal, Suez, Egypt.

Summary

Energetic mechanical engineer with 12+ years of combined experience power generation mega-projects for well known corporations. Implemented effective various mechanical strategies in maintenance, construction, commissioning and start up at wide range of professionalism. Applied lean aspects collaborating with various sections to facilitate project implementation and improve the reliability of the work. Seeking to bring fast, intelligent solutions to the position of Mechanical Engineer at well known organization.

Overview

11
11
years of professional experience
2
2
Languages

Work History

Lead Mechanical Engineer.

Misr Consultancy., Development of the South Valley reclamation & irrigation of 375,000 acres.
Toshka
08.2022 - Current
  • Worked as both static & rotating equipment consultant engineer ; supervising on well known companies such as "Orascom, Kharafi national, …" establishing irrigation pump stations, boosters, & pipelines.
  • Reviewed & traced the approved integrated package DWGs to be executed on site by the contractors.
  • Inspected ongoing activities live on daily basis to keep up with planned schedule without shortcoming in quality.
  • Revised & approved the ITP's which are submitted by contractors for mechanical activities.
  • Examination and receipt of contractors' works (IR's) according to project specifications & related standards.
  • Been familiar with project various related standards "AWWA STD., ASME STD., …" for infrastructure & water works.
  • Provided professional services and support in dynamic work environment.

Lead Mechanical, Piping, & Commissioning Engineer.

Doosan Heavy Industries & Construction Co., Ltd. , Assuit super critical steam power plant 1x650MW
Assuit
05.2020 - 08.2023
  • Trace the punch items and the technical issues in site to accomplish the TOP successfully.
  • Start up and pre-commissioning for STG-CONDENSER "CP.106" for sub-systems " GEN-SYSTEMS, CONDENSER SYS., & STEAM SYS, …etc.".
  • Design & follow up the steam blowing phases.
  • Overcome obstacles in site and follow up the activities to keep up with the planned schedules.
  • Control the spare parts, start up & commissioning material which will be handed over to the client.

<p > Mechanical & Piping Engineer. </p><p > AC BOILERS S.p.A "formerly Ansaldo Caldaie"., Assuit super critical steam power plant 1x650MW, Assuit </p><ul > <li > Trace the material arrangement & fluency to the site to keep up with the activity scheduled erection plan.<br> </li><li > Create the test battery limits & method of statement for pressure tests of various piping systems. </li><li > Daily follow up the progress. </li><li > Review test packages, & erection method of statements. </li><li > Cover and participate in solving in time <i><u>technical issues</u></i> or mismatching in daily basis. </li><li > Make sure that <u><i>HSE </i></u>targets are maintained to a very high standard. </li><li > Implemented fast, precise, and safe accomplished of the <u><i>assigned scope.</i></u> </li> </ul><p > </p>

AC BOILERS S.p.A "formerly Ansaldo Caldaie"., Assuit super critical steam power plant 1x650MW
Assuit
11.2019 - 04.2020

<p > Mechanical, Piping, & Technical Officer Engineer. </p>

Doosan Heavy Industries & Construction Co., Ltd., Assuit super critical steam power plant 1x650MW
Assuit
11.2018 - 10.2019
  • Coordinate & follow up the installation of both Static & Rotating mechanical equipment in site.
  • Trace the material arrangement & fluency to the site to keep up with the activity scheduled erection plan.
  • Create the test limits & method of statement for pressure tests of various piping systems.
  • Inspect the quality of theSteam Surface Condenser, Pipingerection according to the ITP.
  • Review all in site related lifting plans, test packages, & erection method of statements.
  • Cover and participate in solving in time technical issues or mismatching.
  • Make sure that HSE targets are maintained to a very high standard.
  • Implemented fast, precise, and safe accomplished of the assigned scope.

Senior Piping and Hydro-static Testing Engineer./pp/p

Orascom Construction (OC), KIMA Aswan Ammonia & Urea Fertilizer Project.
Aswan
08.2018 - 10.2018
  • Coordinate and supervise the piping installation process.
  • Follow up the erection activities and sending related daily reports.
  • Working on improving the technicians' skills through weekly tool box talking.
  • Apply lean principles using flexibility and plan B switch-over to overcome sudden obstacles out of the site conditions.
  • Perform Hydro-static and pneumatic tests for various piping systems according to proprieties and released test packages.
  • Take HSE Precautions during erection and testing.
  • Cover and participate in solving in time technical issues or mismatching.
  • Control the required manpower and equipment to make full use of resources and reduce cost.

<p > Senior Piping and Hydro-static testing Engineer. </p><p > Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens., New Capital </p><ul > <li > <p > Creation of Test and Commissioning procedures and matchwith site conditions. </p> </li><li > Coordinate and execute on-site tests.<br> </li><li > Report timely and accurately on project progress and results.<br> </li><li > Contribute to make sure that the adequate priorities of the testing activity is maintained.<br> </li><li > performing <i>pre-commissioning</i> for auxiliary equipment according to manufacturer manual.<br> </li><li > Make sure that <b>HSE</b>targets are maintained to a very high standard.<br> </li><li > <p > Supervision of rotating equipment installation and adjustment. </p> </li><li > Implemented fast, precise, and safe accomplished of the assigned scope.<p > <br> </p> </li> </ul>

Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens.
New Capital
01.2018 - 07.2018

<p > Mechanical Engineer. </p>

Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens.
New Capital
11.2016 - 12.2017

  • Monitor the daily activities related to construction issues, gathering project data and producing technical periodical reports.

  • Managed site resources and ensured adequate staffing and manpower to complete the project on time.

  • Installation of Steam Turbine of type (SST5-5000:HI50-6HV2-M4-5; L2X080-3E-MC07-M4)and Air Cooled Condenser(ACC).
  • Performed Leak tightening test and Commissioning for the ACC.
  • Implemented lean construction practices, 5S and visual management, throughput improvements, quality improvements, safety and ergonomics.
  • Contributed to raise the team technical level through the tool box talks twice a week.

<p > Static Equipment & Piping Engineer. </p><p > Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired),GE-ALSTOM as main contractor., SUEZ </p><ul > <li > Performed hydro-static,pneumatic tests and flushing for <i><u>STG</u></i> pipelines.<br> </li><li style="text-align:justify;"> Commissioning and preparing for start up operation for STG and auxiliary skids and subsystems.<br> </li><li > Carry out <u><i>pre-commissioning</i></u>activities for auxiliary rotating equipment. </li><li > Maintained the root cause of sudden shutdown as fast as possible. </li><li > Surveyed for special tools and spare parts to be delivered to either manufacturer or client. </li><li > Considered <i>extra-work </i>time sheets for out of scope activities. </li> </ul>

Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired),GE-ALSTOM as main contractor.
SUEZ
05.2015 - 10.2016

<p > Technical office engineer "Piping.". </p><p > Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired), GE-ALSTOM as main contractor., SUEZ </p><p > </p><ul > <li > Review drawings,material availability according to construction activities. </li><li > Coordination for erection of piping systems from scratch to client hand over (TOP).<br> </li><li > Connect with logistics team to arrange for urgent material required for construction activity.<br> </li><li > Quantity survey for piping and supports.<br> </li><li style="text-align:left;"> Follow up the activity with construction.<br> </li><li > Improve the work fluency to keep up with the client scheduled plan.<p > <br> </p> </li><li > Fed back with installation obstacles to try to solve after client approval and drawing related <i><u>As-built s</u></i> if required. </li> </ul><p > <br> </p><p > </p><p > <br> </p>

Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired), GE-ALSTOM as main contractor.
SUEZ
10.2014 - 04.2015

<p > Reserved Officer Engineer. </p>

Egyptian Armed Forces, Naval Forces.
Red & Mediterranean sea.
04.2012 - 10.2014
  • lieutenant Engineer has strong leadership skills.
  • First Engineer (reserved officer) on a 4000 HP Military ship.
  • Responsible for all ship included pipelines, mechanical and electrical motors, engines, and devices; and making sure they are working properly.
  • Applying maintenance strategies (both preventive and predictive) according to scheduled plans.
  • Overcome technical obstacles and sudden failures as fast as possible especially during sail.

Education

Cairo University, Bachelor' S Degree in Mechanical Design & Production Engineering.
05.2006 - 2011.05

Skills

    Lean Concepts in Construction

undefined

Software

SolidWorks 3D CAD Modeling

AutoCAD(2D)Mechanical

MATLAB

MS Office tools

Timeline

Lead Mechanical Engineer.

Misr Consultancy., Development of the South Valley reclamation & irrigation of 375,000 acres.
08.2022 - Current

Lead Mechanical, Piping, & Commissioning Engineer.

Doosan Heavy Industries & Construction Co., Ltd. , Assuit super critical steam power plant 1x650MW
05.2020 - 08.2023

Mechanical & Piping Engineer. AC BOILERS S.p.A "formerly Ansaldo Caldaie"., Assuit super critical steam power plant 1x650MW, Assuit Trace the material arrangement & fluency to the site to keep up with the activity scheduled erection plan. Create the test battery limits & method of statement for pressure tests of various piping systems. Daily follow up the progress. Review test packages, & erection method of statements. Cover and participate in solving in time technical issues or mismatching in daily basis. Make sure that HSE targets are maintained to a very high standard. Implemented fast, precise, and safe accomplished of the assigned scope.

AC BOILERS S.p.A "formerly Ansaldo Caldaie"., Assuit super critical steam power plant 1x650MW
11.2019 - 04.2020

Mechanical, Piping, & Technical Officer Engineer.

Doosan Heavy Industries & Construction Co., Ltd., Assuit super critical steam power plant 1x650MW
11.2018 - 10.2019

Senior Piping and Hydro-static Testing Engineer./pp/p

Orascom Construction (OC), KIMA Aswan Ammonia & Urea Fertilizer Project.
08.2018 - 10.2018

Senior Piping and Hydro-static testing Engineer. Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens., New Capital Creation of Test and Commissioning procedures and matchwith site conditions. Coordinate and execute on-site tests. Report timely and accurately on project progress and results. Contribute to make sure that the adequate priorities of the testing activity is maintained. performing pre-commissioning for auxiliary equipment according to manufacturer manual. Make sure that HSEtargets are maintained to a very high standard. Supervision of rotating equipment installation and adjustment. Implemented fast, precise, and safe accomplished of the assigned scope.

Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens.
01.2018 - 07.2018

Mechanical Engineer.

Orascom Construction (OC), New Capital Combined Cycle Power Plant ( 4800 MW).The Consortium of Siemens.
11.2016 - 12.2017

Static Equipment & Piping Engineer. Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired),GE-ALSTOM as main contractor., SUEZ Performed hydro-static,pneumatic tests and flushing for STG pipelines. Commissioning and preparing for start up operation for STG and auxiliary skids and subsystems. Carry out pre-commissioningactivities for auxiliary rotating equipment. Maintained the root cause of sudden shutdown as fast as possible. Surveyed for special tools and spare parts to be delivered to either manufacturer or client. Considered extra-work time sheets for out of scope activities.

Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired),GE-ALSTOM as main contractor.
05.2015 - 10.2016

Technical office engineer "Piping.". Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired), GE-ALSTOM as main contractor., SUEZ Review drawings,material availability according to construction activities. Coordination for erection of piping systems from scratch to client hand over (TOP). Connect with logistics team to arrange for urgent material required for construction activity. Quantity survey for piping and supports. Follow up the activity with construction. Improve the work fluency to keep up with the client scheduled plan. Fed back with installation obstacles to try to solve after client approval and drawing related As-built s if required.

Kahromika, Suez Thermal Power Plant 650 MW (Gas/Oil fired), GE-ALSTOM as main contractor.
10.2014 - 04.2015

Reserved Officer Engineer.

Egyptian Armed Forces, Naval Forces.
04.2012 - 10.2014

Cairo University, Bachelor' S Degree in Mechanical Design & Production Engineering.
05.2006 - 2011.05
Mustafa Abdull-FattahLead Mechanical Engineer.