Summary
Overview
Work History
Education
Skills
Timeline
Training
Generic

Mahmoud Saeed Shabaan Ebrahim

Senior Quantity Surveyor
Cairo

Summary

Senior Quantity Surveyor with 13+ years of experience in cost control, pre- and post-contract quantity surveying, and technical office operations across landmark projects in Saudi Arabia and Egypt. Proven expertise in BOQ preparation, cost estimation, payment certifications, and claims management. Skilled in coordinating with multidisciplinary teams, resolving site and contractual issues, and ensuring project compliance with budgets and deadlines. Adept in both consultancy and contracting environments with a strong focus on accuracy, efficiency, and value engineering.

Overview

13
13
years of professional experience

Work History

Lead Quantity Surveyor ( Pre-Contract)

Khatib & Alami –Egypt ( Head Office )
Cairo
06.2022 - Current
  • Led pre-contract quantity surveying services for major building projects including hotels, towers, commercial & Administrative buildings, Residential and port-related developments.
  • Manage and review detailed quantity take-offs and cost estimates based on architectural, structural, and MEP drawings.
  • Prepare and validate comprehensive Bills of Quantities (BOQs) in compliance with international standards such as POMI, or client-specific formats (e.g., Aramco standards).
  • Coordinate with multidisciplinary design teams to ensure cost deliverables align with design intent and client requirements.
  • Lead and mentor a team of quantity surveyors, providing technical guidance and reviewing their outputs.
  • Advise on value engineering and cost optimization opportunities throughout the design phase.
  • Support the preparation of tender documents and respond to contractor clarifications during the tender process.
  • Contributed to the development and standardization of internal QS procedures, templates, and cost estimation tools.

Selected Projects :

  • Fursan Port Development – KSA Mixed-use coastal development including residential zones, luxury villas, commercial areas, and service buildings.
    Total BUA: ~258,606 m² | Project Value: ~SAR 1.10 Billion
  • Lemar Commercial Project (Retail, Residential - KSA), Consisted of Plot A (Two Basement Levels for parking and service spaces, In addition to a Ground and Two Upper Floors for Retails, Restaurants and Office space and Luxurious 5 stars Hotel (GFL+ 15th floor)) and Plot B core and shell Consisted of two basements for parking and service spaces, ground floor and two upper floors designated for retail, restaurants, and office spaces and Diwaniya villa fully finished with total BUA = 192000m2
  • Tanajib Community Expansion – KSA Large-scale residential development including 5 accommodation building types and 20 service buildings, fully finished with interior design works.Total Area: ~710,885 m²
  • Rabwa Boulevard – KSA Retail and commercial complex divided into 6 zones comprising 41 buildings delivered as core and shell.
    Total BUA: ~16,800 m²
  • CEER Admin Building – KSA Administrative and showroom facility for the first Saudi electric vehicle brand, fully finished with ID works. Total BUA: ~8,940 m²
  • SOUL Town Locanda Hotel & Serviced Apartments – Egypt
    Residential and hospitality project comprising 5 fully finished floors including hotel and serviced apartments. Total BUA: ~27,000 m²
  • Aqalat Smart Square – KSA Mixed-use service development delivered in two phases: Phase 1 with 7 blocks (A–G) and Phase 2 with 3 blocks (H, K, C2).

Technical Office Manager (Site-Based)

Arab Contractors
New Cairo
06.2021 - 06.2022
  • Directed all on-site technical office activities, ensuring alignment with project specifications, timelines, and contractual obligations.
  • Led a multidisciplinary team (QS, CAD, planning, procurement) to deliver coordinated, high-quality technical submissions.
  • Coordinated with consultants and subcontractors to resolve design issues, expedite approvals, and streamline communication.
  • Reviewed and approved shop drawings, materials, and method statements in line with project and contract standards.
  • Oversaw quantity take-offs, cost estimates, interim payments, and variations to maintain financial accuracy and control.
  • Managed procurement and contract administration, including value engineering, EOT claims, and dispute correspondences.

Selected Projects :

  • Parliament Building – New Administrative Capital, Egypt
    A landmark government complex built on (~108,659 m²) , with a total built-up area of 181,759 m². Scope included main building (B+G+8), service buildings, garages (1,500 cars), mosque, medical center, and infrastructure. Contract Value: ~EGP 6 Billion

Senior Quantity Surveyor (Site-Based)

Arab Contractors
New Cairo
07.2017 - 06.2021
  • Reviewed BOQs, IFC drawings, and schedules to ensure alignment with project scope and contract deliverables.
  • Performed precise quantity take-offs (Arch/Str) using AutoCAD and Excel, supporting accurate cost estimation.
  • Prepared and certified interim payments for both clients and subcontractors based on verified quantities.
  • Evaluated subcontractor invoices, variation orders, and EOT claims, ensuring compliance with contractual terms.
  • Coordinated with site, planning, and procurement teams to resolve discrepancies and support cost control.
  • Maintained quantity logs, variation registers, and contract documentation for full audit readiness and transparency.

Selected Projects :

  • The Parliament Building in the New Administrative Capital - Egypt
    El Galala Tourist Resort - Egypt
    Coastal resort development over (~4.2 million m²), featuring a 5-star hotel, luxury villas, chalets, service buildings, swimming pools, and entertainment areas, all built to international environmental standards.

Technical Office Engineer / Quantity Surveyor

Al-Harbi Trading and Contracting Company LTD
Makkah
09.2013 - 07.2017
  • Studied contract documents and design drawings to ensure compliance with project specifications (Projects Value: ~SAR 13 Billion.)
  • Performed detailed quantities take-offs, prepared calculation sheets, and developed cost estimates for various projects.
  • Assisted in the preparation and review of shop drawings, ensuring alignment with technical requirements and contract terms.
  • Managed the preparation of invoices for both the owner and subcontractors, ensuring accurate and timely billing.
  • Coordinated with design and site teams to resolve technical issues and ensure smooth project execution.
  • Supported the preparation of variation orders and claims, maintaining accurate documentation and minimizing financial risks.
  • Monitored and verified subcontractor invoices, ensuring accuracy and alignment with agreed-upon terms.

Selected Projects :

  • 4th Ring Road Intersections with Jeddah Highway - KSA
  • King Abdullah Financial District – Improvement of Road Intersections & Connections - KSA
  • Water Main Feeder Line – 2 – Al-Qassim- KSA
  • Roads & Intersections to Link King Abdullah Economic City -Jeddah -KSA

Site Engineer

Al-Harbi Trading and Contracting Company LTD
Al-Madinah
03.2013 - 09.2013
  • Supervised daily site activities, ensuring execution aligned with drawings, specifications, and safety standards.
  • Resolved technical issues on-site and coordinated with subcontractors for quality and schedule adherence.
  • Assisted in planning, progress tracking, and reporting delays or deviations to project management.
  • Monitored compliance with quality control procedures and HSE regulations during construction phases.

Selected Projects :

  • Improvement of Three Intersections at Second Ring Road – Al-Madinah, Saudi Arabia (3 Girder Bridges, Retaining Walls)

Site Engineer

El Sheikh Contracting Office
Cairo
07.2012 - 03.2013
  • Supervised daily site activities, ensuring compliance with design specifications and project timelines.
  • Resolved technical issues and coordinated with subcontractors to maintain construction quality.
  • Assisted in planning, reporting, and monitoring project progress and site performance.
  • Ensured strict adherence to health, safety, and quality control standards throughout the project.

Education

Bachelor Degree of Civil Engineering -

Shoubra Faculty of Engineering
Cairo, Egypt
05-2012

Skills

Quantity Take-off

Timeline

Lead Quantity Surveyor ( Pre-Contract)

Khatib & Alami –Egypt ( Head Office )
06.2022 - Current

Technical Office Manager (Site-Based)

Arab Contractors
06.2021 - 06.2022

Senior Quantity Surveyor (Site-Based)

Arab Contractors
07.2017 - 06.2021

Technical Office Engineer / Quantity Surveyor

Al-Harbi Trading and Contracting Company LTD
09.2013 - 07.2017

Site Engineer

Al-Harbi Trading and Contracting Company LTD
03.2013 - 09.2013

Site Engineer

El Sheikh Contracting Office
07.2012 - 03.2013

Bachelor Degree of Civil Engineering -

Shoubra Faculty of Engineering

Training

  • PMP Preparation Course
  • RICS Training (Upcoming)
  • The Arab Contractors, 2009, 2010, 2011
  • Engineering Consultant Group (ECG), university to work initiative, member of the best team in its evaluation, 80 hours professional skills sessions, 96 hours technical sessions
  • Egyptian Contracting (Mokhtar Ebrahim), 2011
Mahmoud Saeed Shabaan EbrahimSenior Quantity Surveyor