Years of professional experience
Experienced Mechanical Engineer with a proven record of accomplishment of successfully executing in large-scale prestigious construction projects. Possessing a deep understanding of construction procedures and materials of all aspects of MEP, HVAC, and utilities. Expertise in construction supervision, testing, and commissioning of residential, commercial, industrial and healthcare, projects. Currently seeking a challenging position to utilize team player attributes, organizational skills and experience in achieving career goals.
Years of professional experience
Completed Projects
Project 15 : ( Educational & Medical Building )
College of Medicine and Health Science – Qatar University .
Modern building consisting of four floors, in addition to a basement that includes parking spaces and technical facilities. The building is including classrooms, teaching and research laboratories, lecture halls, and administrative offices , Objective Structured Clinical Examination OSCE suites, an anatomy museum, and research laboratories. The project has been rated with a 3-star sustainability grade under the Global Sustainability Assessment System (GSAS).
The MEP System is consisting of : HVAC & District Cooling Chilled Water System consisting of almost 1000 Equipment-s ( FCUs , AHUs , FAHUs , PHEXs , Pumps ) , Domestic Water Supply , Drainage , Storm Water , Sprinkler & NOVEC Fire Protection, Medical Gas , Building management System , CCTV , Laboratories Control , Access Control & Substation.
Project 14 : ( 7-Stars Hotel )
Hegra Heritage Boutique Hotel – Al- Ula – Saudi Arabia .
External Piping networks :
Domestic water , Chilled water, Firefighting , Irrigation , & Drainage .
16 Nos of Guests Residential Buildings :
Water supply & Drainage , Firefighting systems ( Sprinkler), Swimming Pools , Fan Coil units , Exhaust fans , Fresh air supply fans , Disabled Toilet alarm , Access Control , CCTV , guest rooms management and control system , Fire Alarm system .
14 Nos of Utilities & services Buildings :
Water supply , Drainage , Firefighting systems ( Sprinkler , Foam , Clean Agent & Kitchens Hoods fire suppression System ) , Centralized water heaters , Cold Food Storage Rooms , Fresh air handling units , Fan coil units , Data Center CRAC units , Server rooms SRAC units , Smoke Management , VAVs , Kitchen Exhaust Ecology Treatment units , LPG system , Sewage treatment plant , Access Control , CCTV , Guest Room Management System , Building Management system , Fire Alarm system , Kitchens & Laundries .
Project 13 : ( Industrial & Residential Buildings )
Engineering, Construction & Operation of Strategic Mega Reservoirs - PRS-04 (Package E), Abu Nakhla– Doha – Qatar.
Employer , Main Contractor : China Gezhouba Group (CGGC) . Client: KAHRAMA, Qatar General Electricity and Water Corporation . Project Management Consultant: ENERGOPROJEKT-ENTEL LTD. Main Consultant: Arcadis Consulting Middle East (Hyder) .
Project Scope ( MEP ) :
Procurements , Engineering , Construction & Testing/Commissioning of five potable water reservoirs with total effective storage capacity of 485 million Imperial Gallons (MIG) including Pumping Stations, Pipework, Mechanical, Electrical, ICA, Civil, Structural, Architectural, and building work for the complete PRPS facility at Abu Nakhla.
MEP utilities included :
11 KVA Substations, Switch Gears , MDBs & EMDBs Panels . Air Compressors & Surge Vessels.
Building Management system ( BMS ) Central Battery System
Diesel Generators & Fuel System. Drainage System & Submersible Pumps.
Electro mechanical Equipment-s (Elevators, Cranes, Roller Shutters & Sliding Gates).
Fire Fighting & Addressable fire alarm System (Water Network , Clean Agent FM200 , Foam system & Fire Curtain ) .
HVAC ( DX System , Chilled Water system , Air Cooled Chillers , FAHUs , AHUs , Smoke Extract & Air Washers ) .
Lighting & Lighting Control. Potable Water System.
Process Special purpose Chillers.
Security System (CCTV & Public Access Control). Uninterrupted Power Supply ( UPS )
Project 12 : ( Residential )
CPC 07-A & B – ISF Camp Development – Duhail – Doha – Qatar.
Employer , Main Contractor: QD-SBG.
Client: ISF ( Internal Security Forces ) Interior Ministry of Qatar. Project Management Consultant: QPM.
Consultant : KEO.
Project's Scope Brief ( MEP ):
Packages CPC-7A & CPC-7B are covering the construction of residential building spreading over a land area of 605,765 M2 planned to have an ultimate resident population of 17,608 with a cost of approximately 4 billion QR.
Infrastructure Works including:
Reticulation of Potable water System, Irrigation system, Fire Water network, Chilled Water system, Foul Sewage System, Gravity Sewers, Storm Water Sewerage System, Gravity Collection System and Tie-in Points toexisting services, in addition to the Roads, landscape, Power distribution, Communication and Security system, Traffic Signals & lighting of Street, parking lot and Parade areas. Buildings:
22 Barracks buildings (5-Story) +7 General Stores buildings (1-Story) + 4 Headquarter buildings (2- Story) +2 Underground Car Parks Buildings (3-Story) + 1 Instruments Store (2-Story) + 1 Motorcycle Park + 1 Indoor Car Park + 1 Air- Conditioned Car Park + 1 Mosque + 4 Unit Forces Offices + 1 Workshop + 1 Shops Building + 1 Service Block Building, In addition to the Power Substations, Heat exchanger ETS and Generators Stations.
Project 11 : ( Infrastructure )
CPC07B - Lusail Plaza, Infrastructure, LRT Station, Public Car Park, Road & Tunnel , Doha – Qatar
Employer , Main Contractor: QD-SBG . Consultant: Dorsche .
Project Management Consultant: Parsons .
Project's Scope Brief ( Mechanical ):
Parking (5 Story) & LRT Stations , Road & Tunnel MEP Works :
-HVAC & District Cooling.
-Fire Fighting.
-Foul Network .
-Liquefied Petroleum Gas System .
-Diesel Generators & Fuel system .
-Irrigation Network.
-Pneumatic Waste Collection.
-Potable Water Network .
-Storm Water System.
-Tunnel Drainage.
Project 10: ( Medical , Hospitality & Residential Building )
Sidra Medical Research Center. [ SMRC] . Design & Build, Doha – Qatar
Employer , MEP Contractor : Voltas Limited – TATA Enterprises. Client: Qatar Petroleum.
Project Management Consultant: ASTAD . Consultant : KEO.
Project Cost: 1.8 Billion QR ( MEP ) .
Project's Scope Brief ( Mechanical ):
Hospital Building, Central Plant Building, Clinic Buildings, Under Ground Car Park & Multi Story Park. HVAC System including 10 Nos of Chillers each is 2250 TR, with Serving cooling Towers. More than 2000 Equipment such as, Boiler, Pumps, AHUs, FCUs, Fans + More than 1500 VAVs. The HVAC System includes RAHUs, SAHUs, SVAVs, RVAVs, Fast acting Venture VAVs, Gas Tight Dampers,
FCUs, AHUs, Jet Fans, Supply Fans, Exhaust Fans, Smoke Extract Fans, High Plume Fans, Stair Case Pressurization Fans , Huge Sized Sand trap louvers , Chilled water Piping Sizes start at 1.5 m Dia , Huge Fume Extract System from Labs , Isolation & anti-infection Rooms , Steam Network exceeds 12 Kilometers of length, Fire Fighting through Sprinkler System/ FM200 system, Plumping System (Hot/ Cold Water Supply and Drainage) ,LPG Gas Network , Pneumatic Suction Transfer System & Medical Gases Network .
Project 9: ( Commercial Buildings )
North Gate Mall. [ NGM ] . Design & Build , Doha – Qatar . Employer , MEP Contractor : Voltas Limited – TATA Enterprises . Client : North Gate.
Project Management : Hill international . Consultant : ECG & GHD .
Project's Scope Brief ( Mechanical ):
Mall & Office spaces with total area of around 375,000 m2 includes 2 levels of carpark, with isolated Chiller Plant Room at the 2nd Level served by the Cooling towers Plant at the mall's Roof , a 3-level mall and 6 Nos. of 5-level office buildings. It is a mixed-use Project including the Crystal Garden, Market Street indoor/outdoor dining precinct, and huge Hall. Mechanical Scope was consisted of The Chiller Plant Room includes 5 Nos. Chillers with 2350 TR each , Pre-insulated CHW Piping started with 1.2m Dia , Pressurization fans , Exhaust fans , FCUs , AHUs , Cooling Towers & Fire Rated Ducting ,Firefighting ( Sprinkler System ) & Clean Agent Fire Suppression system ,Water Supply & Drainage ,LPG Network .
Project 8 : ( Commercial Buildings ) Doha Festival. ( DFC ) . Mall - Doha Qatar
Employer , MEP Contractor : Voltas Limited – TATA Enterprises . Client : Alfutaim .
Project Management : Mace International .
Project 7 : ( Commercial Buildings )
Cairo Festival City . ( CFC ) . Mall - Cairo , Egypt
Employer , Main Contractor : Orascom Construction Industries - Egypt . Client : Alfutaim .
Consultant: ECG .
Project 6 : ( Infrastructure)
Jabal Omar Project . (Makkah Development – KSA). Employer , Main Contractor : Saudi Bin Laden Group - Egypt. Client: Makkah Development.
Consultant: Dar Alhandasa .
Project 5 : ( Educational & Residential Buildings )
Princess Noura University for Women. ( Riyadh – KSA).
Employer , Main Contractor : Saudi Bin Laden Group - Egypt. Client : Ministry of Education , Saudi Arabia .
Consultant: Dar Alhandasa .
Project 4 : ( Residential , Commercial & Hotels Buildings )
37 Buildings [ 30 Residential + 7 Commercial ]. ( Ground + 4 Floors ) at Midriff - Dubai – UAE .
Employer: Ozone Contracting - UAE. Client : Dubai Properties.
Consultant: Kling Engineering .
Project 3 : ( High Rise Residential Building )
Helal Tower ( Ground + 6 Parking + 2 Services Floors. + Health Club. + 33 Floors ) Sharjah – UAE .
Employer: Ozon Contracting - UAE. Client: Alwathbah HCO . Consultant : Mazaya .
Project 2 : ( High Rise Residential Building )
Dana Tower ( Ground + 8 Parking + 4 Services Floors. + Health Club. + 66 Floors ) Sharjah – UAE .
Employer: Ozone Contracting - UAE. Client: Danat Alsharqah .
Consultant : Dimensions .
Project 1 : ( Administrative Building )
An-namer Center ( Ground + 2 Parking + 6 Floors + Mechanical Floor ) Riyadh- KSA.
Employer: Alethniniah Client: Alfaisaliah Group .