Summary
Overview
Work History
Education
Skills
Timeline
Accomplishments
Hi, I’m

Mohamed Abd Elstar

Project Manager
ASWAN
Mohamed  Abd Elstar

Summary


Professional Summary

Insightful Manager with experience directing and improving operations through effective employee motivational strategies and strong policy enforcement. Proficient in best practices, market trends and regulatory requirements of industry operations. Talented with analytical approach to business planning and day-to-day problem-solving. Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.
I am looking for a good position in the field of contracting and project management in a well-known and large entity where practical experiences and academic studies can be fully exploited. hold a master’s degree in management, which enables to act in an excellent manner under any circumstances, for the benefit of the work first.

Overview

17
years of professional experience
6
years of post-secondary education

Work History

EL SALAM For Co. & INV
ASWAN

Site Engineer
08.2004 - 05.2005

Job overview

1-for finishing of postal building in new ASWAN city .

2- for finishing of KINDER GARTEN in new ASWAN

city

ACTIVITIES

  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Oversaw quality control and health and safety matters for construction teams

EZZ-EL DINE (Egyptian Army)
ISMAILIA city

Engineering Officer
05.2006 - 09.2007

Job overview

1-Repair of cinema building

2-Designing reinforcement and finishing frame building on

200 m2

ACTIVITIES

  • Designed detailed budget for engineering equipment and projects.
  • Designed project specifications and blueprints for structures.
  • Implemented into daily procedures of general projects.
  • Kept detailed records of project progress and budgets.

EL SAFA Group
LUXOR office

Civil Site Engineer
10.2007 - 05.2009

Job overview


1-for finishing 500 house at LUXOR city


2- for construct 700 house at LUXOR city


3-for the Implementation of the drainage network to 500 homes and posted an 8 kilometers long


4- for the implementation of network fueled by the village consisting of 500 homes


  • ACTIVITIES
  • Collaborated with civil technicians to gather project equipment and update maps, drawings and blueprints.
  • Managed construction contracts for capital projects to outline objectives, stakeholder responsibilities and modification procedures.
  • Performed routine training and attended special events to enhance job knowledge and skills.
  • Monitored execution of contract work for compliance with design plans and specifications.

EL SAFA Group
- LUXOR office

Project Manager
05.2009 - 10.2009

Job overview


for construct 20 buildings and 250 houses


  • ACTIVITIES
  • Planned, designed, and scheduled phases for large projects.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Managed projects from procurement to commission.

EL SAFA Group
ASWAN office

Executive Director
11.2009 - 12.2010

Job overview


1 - for finishing EL-GAMEAA Mosque in ASWAN .

2- for Implementation the structure of the Islamic Cultural Center Annex EL-GAMEAA mosque in Aswan

Building on an area of 400 meters flat and consists of five floors and structural system for floor

Slabs are

- panelled beam

- Flat slab

- Solid slab


3 –for finishing 20 building and construct 15 building

In second stage at EL Sdaka city


4- For EL SAFWA City. (First stage)

Safwa city Is one of the projects set of Safa Contracting and Real Estate Investment,

A special city containing a total of

Residential buildings and service buildings

in addition to swimming pools and green areas

-In the first stage all the foundations of the city havebeen completed

From three buildings until delivery and

in addition ,t wo Building of the Temple



  • ACTIVITIES
  • Fostered work culture of collaboration and inclusion to increase morale and reduce turnover.
  • Drove strategic improvements to enhance operational and organizational efficiencies.
  • Aligned department vision, goals, and objectives with company strategy to achieve consistently high results.
  • Worked closely with organizational leadership and board of directors to guide operational strategy.

AL- HEGAZY CONSTRUCTION COMPNAY (HCC)
ASWAN

Executive Engineer
12.2010 - 12.2012

Job overview


(ELEPHNTINE MOVENPICK HOTEL -ASWAN)


For the creation and finishing The hotel's buildings

1-water intake

The station consists of 2 water tank + room supplement

Machines at the station

2- Fuel tank

It is buried under the surface of the earth and it contains 2 steel tank

depth of 5 meters

3- Cooling tower

It is contains 2 cooling

Tower plus rooms machines

4-Treatment plant

5- Irrigation tank

The reservoir contains 2 tank irrigation tanks of green

spaces at the hotel plus room Machines

The tank area is

120 square meters

And it 's capacity is300 cubic meters


Nile wing

The building consists of 26 rooms hotel-style .Each room has a suite bathroom and a separate terrace


ACTIVITIES


  • Established procedures for corrective and preventive maintenance.
  • Complied with planning legislation and code regulations for project implementation.
  • Compiled, prepared and presented reports and letters for efficient and effective communications and responses to stakeholders.
  • Incorporated mentoring and prioritized tasks to manage staff performance and development.

AL- HEGAZY CONSTRUCTION COMPNAY (HCC)
ASWAN

Executive Director
01.2013 - 02.2016

Job overview

(ELEPHNTINE Movenpick HOTEL – ASWAN)


I have already worked as Executive Director in one of the construction companies (El safa group ) for a year, but this time the subject is quite different.

The responsibility of Executive Director of the hotel 5 stars is extremely hard because I am civil engineer and this stage requires Architect.

In addition, this position needs many experiences and skills to follow works seriously.

However I become able to perfect all kinds of works thanks to working with efficient engineers and under the authority of very specialized managers.



The following is a brief on hotel


The hotel has five floors

The wing Nile

And the public site, where i worked as a site engineer


Floor roof

Contains roof networks feeding the

Fire of the main building

Second and first floors

Have 70 rooms

Spread over three wings

For the Suites

Executive suite

Diplomatic Suite

The deluxe suite

Junior suite


For rooms


Each room has a bathroom with a shower and a private terrace and all rooms are overlooking the Nile

The bathroom has many kinds of finishes such as marble, porcelain and

gypsum and other. The rooms have a place to sleep only and there is no other place for the living, unlike suites


For the suites


They contain a normal small bath and a large one

They have dressing room in addition to a place for sleep and a place for living and this is not available in regular rooms


Entrance floor


1-Contains one wing that has 15 guestrooms.

2- Also includes the role of multiple restaurants and various finishing overlooking the swimming pool

3- entry has reception and all of service areas for guests

4- Also contains the main kitchen, hot ,cold and super kitchen

5- Contains the halls of conferences

This, for example, and there are many other public spaces


For rooms


Each room has a bathroom with a shower and a private terrace and all the rooms are overlooking the Nile

The bathroom has many kinds of finishes such as marble, porcelain and

gypsum and other.


For the Suites


Executive suite (ONLY ONE)

Like the rooms, but each suite contains a Normal small bath and has a large bathroom contains docks and taking the shower and the bath and dressing room in addition to a place for sleep and a place for living and this is not available in regular rooms


Garden floor


Contains one wing that has 15 guestrooms.

Ground floor contains most of the mismatch services for the project, for example, but not limited to

1. Contains station mechanics and electricity for the project

2. Laundry

4-locker rooms for employees

5. Refrigerators and preparation rooms

6-shops


If we look at the importance of the other way, we find it contains many of the places of interest, such as

1. Meeting Rooms

2-Jacuzzi

3-mosques

4. Fountain

5-elevator Panorama


  • Exercised appropriate cost control to meet budget restrictions and maximize profitability.
  • Worked closely with organizational leadership and board of directors to guide operational strategy.
  • Drove strategic improvements to enhance operational and organizational efficiencies.
  • Fostered work culture of collaboration and inclusion to increase morale and reduce turnover.

El Mohamedya General Contracting
ASWAN

Project Manager
03.2016 - 12.2018

Job overview



1-(Administrative building of new Aswan city)


The experience of working as a project manager is different from the previous jobs that I have occupied, this job requires a strong administrative structure ENGINEER whom must have an executive experience in this kind of works


The following is a brief on building


The total building area is about 14000 square meters. The administrative building of the new Aswan city consists of three floors and the building is located on a surface of 1600 of the total area of the building and the rest of the area is dust from green areas, parking, parking spaces and waiting for the public.
Inside the building, there are staff offices, public dealing rooms and conference rooms that contain accommodation



2-Nile International School (NES)


The school consists of a nursery building, a theater building, a conference hall and the main school building


The following is a brief of school

1- The Nursery Building The building has already been completed and has been opened with the current academic year. It is on a 5000 meter surface and includes 10 classrooms, in addition to the administrative offices and the general location.


ACTIVITIES


  • Managed projects from procurement to commission.
  • Identified plans and resources required to meet project goals and objectives.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Planned, designed, and scheduled phases for large projects.

El Mohamedya General Contracting
ASWAN

General Manager of Projects
01.2017 - 12.2018

Job overview


1 - for finishing Development of the National Bank

of Egypt (Aswan Branch )

2- The process of establishing a school of basic education 42 separation in the city of New Aswan.


3 –for finishing 22 buildings and construct 15 buildings

In new aswan city


4 -Construction of 3 buildings in Aswan city within the

development of slums development



ACTIVITIES


  • Identified plans and resources required to meet project goals and objectives.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Managed projects from procurement to commission.
  • Achieved project deadlines by coordinating with contractors to manage performance.

MASR HOLANDA FOR TOURISM AND HOTEL INVESTMENT
ASWAN

Project Manager
01.2019 - 06.2019

Job overview

Execution of the aqua park and city max hotel

ACTIVITIES

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Managed projects from procurement to commission.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.

El Mohamedya General Contracting
ASWAN

General Manager of Projects
10.2019 - 03.2021

Job overview

1-for Nile International School (NES)

2-(Administrative building of new Aswan city)

3- for finishing Development of the National Bank of EGYPT ( kom ombo branch )

ACTIVITIES

  • Identified plans and resources required to meet project goals and objectives.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Managed projects from procurement to commission.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Education

ASWAN UNIVERSITY
ASWAN

Bachelor of Engineering from Civil Engineering
09.1999 - 05.2004

RB COLLEGE
UNITED KINGDOM

MBA from Business Administration And Management
05.2019 - 10.2020

Skills

    Construction management

undefined

Timeline

General Manager of Projects

El Mohamedya General Contracting
10.2019 - 03.2021

RB COLLEGE

MBA from Business Administration And Management
05.2019 - 10.2020

Project Manager

MASR HOLANDA FOR TOURISM AND HOTEL INVESTMENT
01.2019 - 06.2019

General Manager of Projects

El Mohamedya General Contracting
01.2017 - 12.2018

Project Manager

El Mohamedya General Contracting
03.2016 - 12.2018

Executive Director

AL- HEGAZY CONSTRUCTION COMPNAY (HCC)
01.2013 - 02.2016

Executive Engineer

AL- HEGAZY CONSTRUCTION COMPNAY (HCC)
12.2010 - 12.2012

Executive Director

EL SAFA Group
11.2009 - 12.2010

Project Manager

EL SAFA Group
05.2009 - 10.2009

Civil Site Engineer

EL SAFA Group
10.2007 - 05.2009

Engineering Officer

EZZ-EL DINE (Egyptian Army)
05.2006 - 09.2007

Site Engineer

EL SALAM For Co. & INV
08.2004 - 05.2005

ASWAN UNIVERSITY

Bachelor of Engineering from Civil Engineering
09.1999 - 05.2004

Accomplishments

  • Supervised team of [Number] staff members.
Mohamed Abd ElstarProject Manager