Summary
Overview
Work History
Education
Skills
Certification
Training
Activities
Software
Languages
Timeline
Generic

Mohamed Ayman Yassin

Control Systems Engineer
Alexandria,ALX

Summary

Diligent Controls Engineer with over 14 years of experience in controls engineering. Adept at the design and testing of existing systems and new control systems. Talents in project management, programming languages, and consultancy support. Friendly and organized with familiarity with safety and health regulations.

Overview

14
14
years of professional experience
5
5
years of post-secondary education
1
1
Certification
3
3
Languages

Work History

Senior Instrumentation & Control Systems

Arab Petroleum Pipelines Company - SUMED
Alexandria, Alexandria
07.2018 - Current
  • Project Manager for upgrading SUMED SIDI-KERIR terminal control system using Rockwell Automation Factory talk view SE SCADA and Allen Bradely ControlLogix controllers to increase system stability and reducing unexpected shutdowns to minimal and boost system efficiency and availability by 50%
  • Performed integration and interfaces with third party systems through Modbus and BACnet protocols. Third party systems included Honeywell Entis Tank inventory systems, Rotork MasterStation, Swinton metering system and Honeywell Fire Alarm control system.
  • Project Manager for new pump station facility installation in SUMED SIDI-KERIR terminal using in-house resources for instrumentation activities to meet restricted time schedule and limited budget
  • Activities included PLC ladder programming and all software HMI tasks (drawings, animation, trends, develop tag database, parameters file and programming, etc…) and hardware tasks (develop IO list, loop diagrams, panel building, IO modules selection and installation) beside field devices installation, configuration and connections.
  • Project Manager for upgrading fire alarm/fighting system using Honeywell fire alarm control system in SUMED SIDI-KERIR terminal including tank farm, pump stations, different buildings, roads and electrical substations to: Infrastructure cost reduction by using fiber optic cables to connect between various panels and GUI
  • Enhancing system reliability using GUI that demonstrates all faults, troubles and fire alarm signals
  • Fostering alarm location accuracy making use of addressable panels
    Decreasing fault alarms and differentiating between trouble and fire alarms

Control Systems Engineer

Arab Petroleum Pipelines Company - SUMED
Alexandria, Alexandria
07.2013 - 07.2018
  • Continually updated technical knowledge through relevant professional development courses, staying current with industry trends and best practices in PLC programming.
  • Implemented remote monitoring capabilities for critical systems using advanced communication protocols, allowing real-time data access from any location.
  • Worked closely with contractors to establish specifications and system designs.
  • Ensured compliance with industry regulations by maintaining accurate documentation and adhering to safety protocols during SCADA and DCS projects execution.
  • Increased overall system performance by identifying inefficiencies and recommending targeted modifications.
  • Reduced downtime by troubleshooting and resolving complex issues with PLC-controlled equipment.
  • Improved SCADA system reliability by conducting regular maintenance and implementing software updates.
  • Reduced downtime through proactive identification of potential equipment failures using diagnostic tools within the DCS platform
  • Collaborated with cross-functional teams to ensure seamless integration of control systems, promoting efficient communication and data transfer between departments.

Instrumentation Control Engineer

Arab Petroleum Pipelines Company - SUMED
Alexandria, Alexandria
7 2010 - 07.2013
  • Supported plant operations during emergency situations, providing expert guidance to troubleshoot issues quickly and efficiently.
  • Improved safety standards through meticulous inspection and calibration of instruments and controls.
  • Reduced downtime by conducting regular preventive maintenance on critical equipment and systems.
  • Conducted root cause analyses for equipment failures, implementing corrective actions to prevent future occurrences and maximize mean time between failures.
  • Maximized asset life cycle through comprehensive instrument reliability studies and replacement planning.
  • Maintained accurate inventory records for spare parts, reducing stockouts during critical maintenance activities.

Education

Bachelor of Engineering - Computers and control systems

Mansoura University
Egypt
09.2003 - 06.2008

Skills

Traditional & Agile Project Management

undefined

Certification

PMP - Project Management Professional - CERTIFICATION NUMBER: 3906933

Training

  • Honeywell XLS UL Certification Training (End-User), 02/01/24, Honeywell Training Center, Dubai, UAE, CL/136-2671-7900-22983/232585
  • PMP Preparation 'ECO2021', 02/01/24, PM Tricks
  • Safety Instrumented Systems (SIS) Design and Application, 10/01/23, Enppi Training Center, Alexandria, Egypt
  • FactoryTalk View SE Programming, 02/01/20, Rockwell Training Center, Milton Keynes, England
  • STRP-156: Meetings and Negotiation Skills, 12/01/21, The American University in Cairo, Cairo, Egypt
  • PMP Preparation, 09/01/19, Engineers Syndicate, Alexandria, Egypt

Activities

  • Football
  • Gymnastics
  • Yoga
  • Running

Software

MS Office

Autocad

Languages

Arabic
Bilingual or Proficient (C2)
English
Advanced (C1)
German
Upper intermediate (B2)

Timeline

PMP - Project Management Professional - CERTIFICATION NUMBER: 3906933

08-2024

Senior Instrumentation & Control Systems

Arab Petroleum Pipelines Company - SUMED
07.2018 - Current

Control Systems Engineer

Arab Petroleum Pipelines Company - SUMED
07.2013 - 07.2018

Bachelor of Engineering - Computers and control systems

Mansoura University
09.2003 - 06.2008

Instrumentation Control Engineer

Arab Petroleum Pipelines Company - SUMED
7 2010 - 07.2013
Mohamed Ayman YassinControl Systems Engineer