Summary
Overview
Work History
Education
Skills
Software
Work Availability
Timeline
Generic

Mohamed Eltaher

Senior Site Engineer
Al Sharqia,Shq

Summary

Highly-qualified Site Engineer familiar with contractor needs and operational practices. Highly effective at staff leadership and site management. Specializing in construction. Talented Site Engineer offering 8 years of construction experience. Knowledgeable about best practices, safety requirements and documentation.

Overview

1
1
Language
7
7
years of post-secondary education
9
9
years of professional experience

Work History

Senior Site Engineer

hassan allam construction
marsa matrouh, swan lake project
09.2020 - Current
  • Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
  • Established and implemented construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Monitored team of 500 personnel during construction activities for compliance with health and safety requirements.
  • Performed quality control procedures on equipment and materials.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Responded to technical concerns quickly and effectively devised solutions.

DLP Maintenance Engineer

hassan allam construction HAC
north coast, marrassi blanca &blanca4
02.2018 - 09.2020
  • Installed, configured, tested and maintained operating systems, application software and system management tools.
  • Oversaw development and maintenance of organization computer systems and intranet.
  • Designed and implemented system security and data assurance.
  • Built and maintained network infrastructure consisting of Windows, Linux and virtual products.
  • Managed installation, upgrade and deployment projects and provided on-site direction for network engineers.
  • Worked closely with customers, internal staff and other stakeholders to determine planning, implementation and integration of system-oriented projects.
  • Wrote and maintained custom scripts to increase system efficiency and performance time.
  • Monitored and tested application performance to identify potential bottlenecks, develop solutions, and collaborate with developers on solution implementation.
  • Provided 2nd and 3rd level technical support and troubleshooting to internal and external clients.
  • Collaborated with mep& civil& arch to achieve handing over the project.
  • Work acting DLP manager to maintain optimum levels of communication to effectively and efficiently complete projects.
  • Managed team of 220 employees, overseeing hiring, training, and professional growth of employees.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.

Site Engineer

hassan allam construction HAC
noarth coast, marrassi blanca1 &blanca 4
01.2016 - 02.2018
  • Optimized performance by balancing systems and calibrating controls.
  • Installed components such as copper pipe and drainage pipe to improve HVAC system performance.
  • Completed thorough inspections of supporting electrical systems to assess continuity and locate faults.
  • Laid out and installed electrical connections and controls as part of HVAC systems.
  • Employed 150techniques to isolate leaks in piping and connections.
  • Completed circuits by connecting systems to sources of refrigerant, fuel or water, testing all connections for integrity.
  • Discussed heating and cooling system malfunctions with customers to isolate problems and verify corrected malfunctions.
  • Assembled auxiliary components to heating or cooling equipment, including air ducts, pipes, discharge valves and flues.
  • Maintained environmental conditions by rebuilding and replacing faulty components.
  • Tested automatic, programmable and wireless thermostats in residential or commercial buildings to decrease energy usage .
  • Installed, connected and adjusted thermostats, humidistats and timers for optimal performance.
  • Laid out electrical wiring to connect controls and equipment, adhering closely to wiring diagrams.
  • Used electrical testing equipment to assess electrical circuits and components for continuity.

Maintenance Engineer

HAC
noarth coast, marrassi
04.2015 - 01.2016
  • Developed process improvements to increase reliability and equipment performance.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
  • Developed work scope for contracted projects, analyzing received quotes and recommending preferred vendors.
  • Performed troubleshooting and repair for complex electrical equipment.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
  • Scheduled and undertook periodic maintenance on all electrical installations, components, and equipment.
  • Organized and directed maintenance shutdowns and startups.

Design Engineer

elfanar company
10th of ramadan, sharkia
02.2014 - 01.2015
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components and systems.
  • Interacted with project leaders and stakeholders to define requirements and generate and maintain design development documents.
  • Worked with product planners and industrial designers to conceptualize and refine product concepts.
  • Prepared, checked and coordinated documentation to support component design and application.
  • Supported engineering design development through analysis and simulation of prototypes and 3D computer models.
  • Completed mechanical designs for HVAC, air control, fire protection and elevators while providing SME input to client and design teams.
  • Designed utilities and ventilation systems for high technology facilities, including cleanrooms, general manufacturing and process and institutional facilities.
  • Tested feasibility, design, operation and performance of equipment, components and systems.

Assistant Site Engineer

HAC
AIN_sokhna, EHC company
05.2011 - 11.2013
  • Established and implemented construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.
  • Managed construction equipment maintenance to minimize costs and avoid project disruption.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Consulted with customers to trace malfunctions and identify root causes, completing speedy repairs to return full performance levels.
  • Optimized performance by balancing systems and calibrating controls.
  • Joined pipes or tubing to refrigerant and water sources to form complete circuit.
  • Discussed heating and cooling system malfunctions with customers to isolate problems and verify corrected malfunctions.
  • Increased longevity of HVAC systems by performing preventive maintenance.
  • Connected heating or air conditioning equipment to water, fuel or refrigerant sources to form complete circuits.
  • Coordinated materials delivery and organization to maintain smooth flow of work.
  • Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
  • Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
  • Created, aligned and optimized electrical instrumentation and testing equipment.
  • Determined most effective approaches to new projects by reading and analyzing blueprints, drawings and sketches.

Education

Bachelor of Electrical Engineering - Electrical Engineering- Power &machine

Fuculty Of Engineering
Zagzig University
10.2008 - 05.2015

Skills

    Consulting

undefined

Software

Computer skills

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Senior Site Engineer

hassan allam construction
09.2020 - Current

DLP Maintenance Engineer

hassan allam construction HAC
02.2018 - 09.2020

Site Engineer

hassan allam construction HAC
01.2016 - 02.2018

Maintenance Engineer

HAC
04.2015 - 01.2016

Design Engineer

elfanar company
02.2014 - 01.2015

Assistant Site Engineer

HAC
05.2011 - 11.2013

Bachelor of Electrical Engineering - Electrical Engineering- Power &machine

Fuculty Of Engineering
10.2008 - 05.2015
Mohamed EltaherSenior Site Engineer