

Dynamic Civil Engineer with over 12 years of extensive experience in concrete and metal construction, specializing in the design and execution of critical infrastructure projects. Expertise in managing workflows for earth and concrete works, underground utility installations, and both greenfield and brownfield demolitions, ensuring timely project completion within budget constraints. Proven ability to identify challenges and implement cost-saving strategies while maintaining high standards of quality and practicality. Committed to professional growth and eager to assume leadership roles that drive project success and innovation in the construction industry.
Site management proficiency
Proficient in AutoCAD
Collaborative team management
Proficient in project oversight
Construction site coordination
Artwork evaluation
Structural steel design
Foundation design knowledge
Advanced surveying techniques
• Monitoring daily site activities and construction progress to ensure alignment with project milestones.
• Tracking work quality and materials to ensure compliance with engineering specifications and safety codes.
• Monitoring resource allocation and material consumption to minimize waste and stay within budget.
• Overseeing on-site safety compliance through continuous monitoring of labor practices and site conditions.
• Estimated quantities and material costs during project planning to support budgeting and costing.
• Managed quality assurance and laboratory testing for concreting operations.
• Conducted detailed site investigations to identify potential issues and develop appropriate remediation strategies.
• Established positive relationships with local authorities and community stakeholders, fostering goodwill and cooperation in project development.
• Analyzed data and used computer simulations to model and test design concepts.
• Conducted detailed structural analyses for major construction projects, ensuring integrity and compliance with engineering standards.
• Reduced construction costs by conducting value engineering assessments and identifying cost-effective solutions.
• Supervised construction progress on-site, addressing any discrepancies or issues promptly while maintaining safety protocols.
• Project Description: FLEX Port Said Mega Industrial Complex
• Total Investment Value: Estimated E.P 200M+
• Project Objective: The primary objective of this project is to construct a 400,000 m² state-of-the-art industrial facility.
• Scope of Work (Project Components): Civil & Structural Works: Construction of 7 massive reinforced concrete buildings and 5 PRE-ENGINEERED Buildings (BEB).
• High-Rise Hybrid Structure: Engineering and supervising a landmark 40m high-rise building (6 floors), integrating advanced concrete works with complex steel structures. • Technical Supervision: Managing the critical interface between civil foundations and steel superstructures, executed under the technical supervision of Zamil Steel and the consultancy of MEG – S3M.
• Initiating & Planning: Defined the project baseline and developed the Project Management Plan, specifically focusing on the logistics of the 40m high-rise construction.
• Execution Management: Led the civil works teams and coordinated with Zamil Steel to ensure precise installation of the 6-floor hybrid structure.
• Monitoring & Controlling: Managed the quality control (QC) process in coordination with MEG – S3M and tracked project milestones against the critical path.
• Stakeholder Management: Facilitated communication between the owner, the consultant, and specialized subcontractors to ensure 100% compliance with engineering standards.
• Key Project Metrics: Total Area: 400,000 m². Main Feature: 40-meter height hybrid building (6 Floors). Technical Partners: ZAMIL (Steel Works) & MEG – S3M (Consultant).
• Spearheaded the structural rehabilitation of the first 350 linear meters of the Western Port Quay in Port Said, ensuring maritime operational readiness.
• Authored comprehensive architectural and structural technical specs for the renovation of multiple administrative and operational buildings.
• Optimized yard layouts by designing and implementing 8 refrigerated container stands and installing 6 high-mast lighting towers (35m) for enhanced visibility and efficiency.
• Managed the full-scale implementation of the firefighting network across all company yards and facilities.
• Oversaw the rehabilitation of terminal yards and industrial flooring to withstand heavy-duty container handling equipment.
• Project Description: HAYAT EGYPT HYGIENIC.
• Total Investment Value: Estimated E.P 100M+
• Responsible for leading the end-to-end project management lifecycle for the construction of HAYAT's mega industrial complex.
• This includes 12 production buildings (3,000 m² -40,000 m² each), extensive underground structures (8m depth), and high-efficiency architectural finishing, ensuring alignment with global corporate standards and strategic objectives.
• Define project scope and develop a comprehensive Work Breakdown Structure (WBS) for the 500,000 m² site.
• Develop a detailed project management plan, integrating schedules for 12 BEB buildings and utility hubs.
• Establish rigorous risk management plans, specifically for deep excavation (8m depth) and large-scale structural steel works.
• Direct and manage project execution, ensuring all 12 buildings meet the 15m height and its area specifications.
• Oversee high-efficiency architectural finishing and MEP (Mechanical, Electrical, and Plumbing) installations across all facilities.
• Coordinate between multi-disciplinary teams (Architectural, Structural, and ADM) to ensure seamless workflow integration.
• Track project performance using Earned Value Management (EVM) to ensure the project remains within the estimated multimillion-pound budget.
• Manage quality assurance protocols for industrial-grade flooring and high-performance building envelopes (Sandwich Panels).
• Control project schedule variances and implement corrective actions to meet the 36- month delivery deadline.
• Manage communication with HAYAT Global stakeholders, providing transparent reporting on milestones and KPIs.
• Lead a diverse workforce of contractors and engineers, fostering a high-performance culture aligned with PMI ethics.
• Optimize resource allocation across the 500,000 m² site to maximize operational efficiency.
• Successfully managed the integration of deep basement structures (8m) with heavy industrial super structures.
• Standardized architectural finishing processes, increasing material efficiency by 15%.
• Delivered complex utility buildings (Power & Water plants) ahead of the production line installation schedule.
• Project Description : BIM UNITED STORES.
• Total Investment Value: Estimated E.P 25M+
• CONSTRUCT BIM project ON 25,000 M2 AREA. This project consists of 4 BEB buildings FOR STORAGE + ADM building Architectural finishing with efficiency +( utilitty buildings +EHS-fire – drivers-securety ) rooms.
• Evaluated new technologies and tools to stay current with industry trends and maintain competitive advantage in the marketplace.
• Implemented quality assurance processes that reduced defects and increased customer satisfaction.
• Conducted root cause analyses for recurring issues, devising long-term corrective actions that enhanced system reliability.
• Developed comprehensive training materials, leading to an increase in user adoption and satisfaction.
• Managed vendor relationships effectively, securing favorable pricing and contract terms for the organization.
• Collaborated closely with clients to gather requirements and translate them into actionable engineering plans.
• Optimized technical documentation for clearer understanding, resulting in a reduced number of errors.
• Project Description : CRS DENIM Garments.
• Total Investment Value: Estimated E.P 20M+ This project consists of concrete building 3 levels on 6000m.
• Recorded daily events and activities in site diary to evaluate process and improve productivity.
• Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
• Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
• Supported property condition assessment reports, 3D scanning and retro-commissioning throughout buildings.
• Solved complex engineering problems by applying advanced technical knowledge, ensuring projects remained on track.
• Improved project timelines by effectively coordinating with subcontractors and ensuring timely delivery of materials.
• Estimated materials costs and sourcing requirements for project feasibility.
• Tested soils and materials to determine foundation strength.
• Reviewed calculations and analytical data to maintain accuracy of technical reports.
• Identified and resolved potential structural issues.
• Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
• Checked technical designs and drawings for adherence to standards.
• Improved client satisfaction by providing regular updates and swiftly addressing any concerns or issues.
• Conducted comprehensive quality assurance checks, ensuring all work met or exceeded project standards.
• Supported CIP projects and managed street and pavement projects.
• Analyzed waterways to identify engineering problems and recommended corrective actions.