To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
Projects:
1- Neom Interchanges of road TR55 Project
Responsibilities :
Prepare BOQ for the flood protection structures of the road and prepare details and reply on the CRS from the client.
2-Jordan New City Pre-conceptual Master plan
Responsibilities :
Prepare floodplain map for Wadies to be maintained in the master plan using WMS,HMS,RAS. Preliminary design of crossing culverts with roads and coordinate with the transportation team. Concept design of the Water, Fire fighting, sewage,irrigation and storm drainage networks. Prepare the interim report for the client.
3- Luanda Port (Unicarges terminal ) in Angola Abu Dhabi ports
Responsibilities :
Design of the water, firefighting, sewage and storm drainage networks, coordinate with all relative trades. Prepare the BOQ and specs for the networks.
4- Ghana Gridco New Office Building
Responsibilities :
Design of the water, firefighting, sewage and storm drainage networks, coordinate with all relative trades. Prepare the BOQ and specs for the networks.
5- East Portsaid port Zone 5 design review
Responsibilities :
Review of the submitted drawings and documents by the operator of the terminal to satisfy the regulations and the code of the region and the client requirements.
6- East Portsaid port Ro-Ro Terminal design review
Responsibilities :
Review of the submitted drawings and documents by the operator of the terminal to satisfy the regulations and the code of the region and the client requirements.
7- Mars Wrigely factory new expansion
Responsibilities :
Design of the water, firefighting, sewage and storm drainage networks, coordinate with all relative trades. Prepare the BOQ and specs for the networks.
8- Sokhna port master plan.
Responsibilities :
Design of Water, firefighting, sewage, storm drainage networks and solving the clashes between all networks. Prepare BOQ and all design stages reports. Coordinate with all relative departments.
9- Tanzania cities roads storm drainage systems
Responsibilities :
Design the storm drainage systems for the new roads in Kahama, Mwanza, Geita and Ilemela cities. Prepare BOQ and details for the drainage system. Coordinate with all relative trades.
10- Boingoma port in comoros
Responsibilities :
Design of water, sewage, firefighting and storm drainage networks and prepare BOQ to submit it to the arab contractor for proposal.
11- Tarboul industrial city proposal
Responsibilities :
Prepare of the methodology of the proposal based on RFP and scope of services. Prepare the time schedule of the project. Prepare the organization chart for the project.
12- Kenya port proposal
Responsibilities :
Prepare the methodology of the proposal based on RFP and scope of services.
Sheikh zayed housing project- Buttain Al samer Urban Quarter A, (Execution of sewer network which includes surveying,excavation,installation pf upvc pipes with geotextile, aggregate and backfilling up to FGL
MS Office
undefined