Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. -Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
- Strategic Construction Manager with demonstrated success assessing project scope and adhering to deadlines. Safety-conscious and detail-oriented with [9]-year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction.
- Hardworking Construction Project Manager with 9 years of experience in construction industry and proven leadership skills. Known for extensive knowledge of OSHA guidelines and wholehearted commitment to employee and personal safety. Successful at completing projects on-time and under budget without sacrificing quality.
- Achievements include bringing in new clients and consistently achieving budget and schedule demands with a hands-on and detail-oriented approach. Excellent communication, relationship-building and problem-solving abilities paired with a superior work ethic and forward-thinking mentality.
Description:
Client : ANOPC
Main contractor: Technip Energies S.p.A.
Scope of work: Civil /steel structure/Mech/Piping - Pre-commissioning
Budget: 260 Million USD
PROJECT BRIEF:
ANOPC company decided to build a hydro-cracking complex to use 2.7 billion barrel from MAZOT direct in to several petroleum components with high quality,
Responsibilities:
Description:
Client : ARAMCO
Main contractor: Samsung Saudi Arabia Co., Ltd.
Location: (Saudi Arabia )
Scope of work (civil /steel structure/Mech/Piping ) pre- commissioning -commissioning assistance
Budget : 600 Million Saudi Rial
PROJECT BRIEF:
The Saudi Arabian Oil Company (Saudi ARAMCO) is the owner of HAWIYAH UNAYZAH GASRESERVOIR STORAGE Project (HUGRS). The project is located in the Eastern Province of Saudi Arabia,
The scope of the WORK for this Contract shall be planned and implemented in two (2) distinct sections, the Injection Facilities and the Reproduction Facilities. For the purposes of this Contract
Responsibilities:
Project: Sulfate Removal Facilities Project (SRF) July2018-Aug2020 Client : ARAMCO
Main contractor: ENPPI
Location: (Saudi Arabia )
Scope of work (civil /buildings /Mech/Piping) pre- commissioning -commissioning assistance
Budget : 150 Million Saudi Rial
PROJECT BRIEF:
· The Ghawar field reservoir pressure is currently maintained from the injection of filtered and de- aerated seawater from Qurayyah Seawater Treatment Plant (QSTP) which contains high concentrations of sulfate ions. According to EXPEC-ARC compatibility studies (internal Saudi Aramco Study), the formation brines of ‘Ain Dar Lower Fadhli (ANDR LFDL) and Fazran Lower Fadhli (FRZ LFDL) reservoirs contain a high concentration of calcium ions which under reservoir conditions react with the sulfate ions in the injected seawater water to form hard calcium sulfate scales. This would result in reservoir scale plugging, leading to disruptive well interventions that incur production losses as well as reduced oil recovery. Seawater from QSTP shall therefore, undergo further treatment to reduce sulfate content prior to being injected in the ANDR LFDL and FZRN LFDL reservoirs to avoid damaging of the reservoir. The purpose of facility is to supply low sulfate (< 200 ppm) injection water for reservoir pressure maintenance to support the proposed production of 100 MBD and 75 MBD Arab Extra Light increments from ‘Ain Dar and Fazran fields respectively. This will support the corporate objective to remain a reliable supplier of oil and gas. This objective will be met through installing seawater sulfate removal facilities at the ‘Ain Dar Water Injection Plant (ADWIP) area to prevent reservoir scale plugging in ‘Ain Dar and Fazran Lower Fadhli reservoirs.
Responsibilities:
Project: Site Completion Project # MC4
Client : (ARAMCO / SINOPIC)
Main contractor: ENPPI
Location: (Saudi Arabia )
· Scope of work (civil /buildings /Mech/Piping) pre- commissioning -commissioning assistance
· Budget: 400 Million Saudi Rial
Project Brief :
The Saudi Arabian Oil Company (Saudi ARAMCO) is the owner of the development of the Yanbu Export Refinery Project (YERP). The proposed refinery is located on the west coast of Saudi Arabia near the city of Yanbu. Engineering for the Petroleum and Process Industries (ENPPI) has been awarded the construction of the following Packages of the YERP.
- Yanbu Crude Oil Terminal (YCOT)
- Upgrade fuel oil loading system at Yanbu Refinery (YR)
- MTBE Tanks Project (MTBE)
- WAREHOUSE Project
- Diesel & Gasoline Tanks Project (DGT)
- Coastal Road Project
- Oily waste water Project
Responsibilities
Project: Special Package # 01 Tank Farm area
Client : (ARAMCO / SINOPIC)
Main contractor: ENPPI
· Location: (Saudi Arabia )
· Scope of work (civil /buildings /Mech/Piping) pre- commissioning -commissioning assistance
· Budget: 550 Million Saudi Rial
Project Brief :
The Saudi Arabian Oil Company (Saudi ARAMCO) is the owner of the development of the Yanbu Export Refinery Project (YERP). The proposed refinery is located on the west coast of Saudi Arabia near the city of Yanbu. ( PETROJET ) has been awarded the construction of Tank Farm Package (SP-01) of the YERP. The tank farm package (SP-
01) consists of the construction of tanks of various Diameters and heights.
Responsibilities
Project : KHARIR BLOCK 10 (BPU)
Yemen Republic
Description:
Client : TOTAL (E&P)
Main contractor: ENPPI
Scope of work (civil /buildings /Mech/Piping) pre- commissioning -commissioning assistance
Budget : 150 Million US Dollar
Project Brief
The objective of the project is to construct a BPU (Basement processing unit) in order to accommodate 30.000 bod coming from Basement reservoir.
Responsibilities:
Project : YEMEN LNG site service and off shore activities
Description:
Client : YEMGAS ( KBR + TECHNIB )
Scope of work (civil /buildings /Mech/piping) pre- commissioning -commissioning assistance
Budget : 170 Million US Dollar
Project Brief
Infer-structure of the camp include all piping works, Electrical, trenching, sewage treatment plant, Re-osmosis plant and potable water tanks Offsite works include all the foundations works in the marine flare and derrick flare, bund walls, fire walls electrical trenching and Riprap
Responsibilities:
Project: (Noubaria power station)
Description:
Client : Bechtel Group USA
Scope of work (civil /buildings/ infrastructure)
Budget : 30 Million US Dollar
Responsibilities
Excellent customer relations