Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Mohamed Ebrahim Gomaa

New Cairo,Egypt

Summary

PMP satellite stations, 5 PTP satellite links, 2STM1, 5 VPN through TE Fiber Network, 3 VPN through Mobile operators (Microwave), 6 internet connections in HQ and the biggest 2 main sites in desert. In addition to a lot of existing and running projects a lot of challenges due to Merg between KPC and QPC because of urgent need to unify and integrate a lot of different Telecom systems in addition to rebuild the existing teams and develop them to be one homogenous team to corporate with another teams, moreover the company organization has great changes which creates a lot of conflicts among most of employers.

Overview

24
24
years of professional experience

Work History

Gen. Manager

Khalda Petroleum Company
01.2023 - Current
  • Main activities and responsibilities, Exploration and Production of Oil and Gas
  • Telecom, As Khalda is the biggest Oil& Gas Company, Khalda Petroleum company acquired Qarun
  • Petroleum Company to be with 10 buildings at Cairo HQ in addition to 32 main sites with its remote areas, 40 drilling rigs……
  • After merge between KPC and QPC Telecom Systems and network including huge no
  • Of Telecom
  • Equipment (630 PMP broadband subscribers, 170 PTP broadband links, 1600 VHF radios, 110

Senior Telecom Engineer

Occupation Or
01.2005 - Current
  • Main Activities and Responsibilities Achieving Technical and commercial Evaluations for New and Existing Systems, Preparing
  • Preventive Maintenance Schedules for Telecom Equipment and Systems, Following Up
  • Requirements of Telecom Equipment and Systems and Preparing Material Requests According to These Requirements, follow up Telecom Equipment system stock, spare parts and stock control, Team leader for many tenders for Telecomm projects as PABX, Fiber optics and
  • Microwave, CCTV and Security systems
  • Preparing Budgets for telecom equipment
  • Supervising
  • Operation and Maintenance of all telecom systems at Head office

01.2003 - Current

Telecom Engineer

01.2000 - Current
  • Main activities and responsibilities Administration, Installation and Technical Support of Communications and Electronics
  • Equipment at Petroleum production and Exploration sites.

Sector Manager

Qarun Petroleum Company
01.2018 - 01.2021
  • Exploration and Production of Oil and Gas
  • Telcom, Managing and supervise all Telecom activities including Projects Management, maintenance all
  • Telecom Systems (Microwave, Fiber optics, HF, VHF, PAGA, CCTV, AC, audio and Video
  • Conference, Telecom Towers,) including Head Quarter, Main sites and its remote sites, in addition to develop and maintain Emergency communication plan, Policies, Safety Committee, negotiation and deals with Mobile Operators to cover company sites in the desert
  • Another crisis Management has been happened during COVIDE-19 which requires strategic planning to guarantee business continuity although shortage limitation because working remotely and safe distance in addition to difficulties to access our main sites in desert, this crisis deeps many cultures team work, solving problem remotely in addition to increasingly need to video conference, telepresence which was pilot project for many employees achieves great cost and time saving, moreover increasing productivity.

Physical Security Systems integrator

Secure Concept, Riyadh Area Manger
01.2016 - 01.2018
  • Mange all Projects, Maintenance, Sales, Financial, Logistics and commercial teams and activities for all local and global accounts in Riyadh and Al Dammam Areas for
  • Physical Security Systems (CCTV, AC, Intrusion, Fire Detection), in addition to supervise development of Company Profile and website
  • Main activities and responsibilities, Type of Business or Sector
  • Occupation or Position Held
  • Main Activities and Responsibilities

Telcom Sector Manager

Qarun Petroleum Company
01.2014 - 01.2016
  • Exploration and Production of Oil and Gas, In this stage Telecom vision has been changed to issue an approve 5 years business plan to develop and upgrade most of Telecom systems starting from power systems
  • Telecom networks in addition to expansion in physical security (CCTV and intrusion systems).t step in development plan was Telecom Infrastructure in Company main sites from
  • Mbps to Gbps using combination between Fiber and Microwave technologies to achieve high capacity, reliability and mobility networks, on the other hand PABX &
  • Conferencing team working to upgrade the existing systems to expand and combine between Telephony and video conference system, also all analog and digital phones will be upgraded to IP and SIP phones, moreover Physical security team was working to monitor and control all security gates in desert in addition to Sensitive strategic areas like CPF , Oil storage and warehouses areas.

Dep. Manager

Qarun Petroleum Company
01.2012 - 01.2013
  • Exploration and Production of Oil and Gas
  • Telcom, During this year the most important activity was crisis management due to a lot of suddenly challenges, so it was great motivator for us to think out of the box and take exceptional and quick decisions because of new needs as a result of weak general security in addition to maintain the existing systems and networks as there was a lot of events that Telecom Egypt Fiber network suddenly became very low availability and reliability , on the other hand there was material and equipment shortage, also there was very low availability for Governmental electricity service, another challenges to engineering study for new CCTV, intrusion and remote & monitoring tools for unmanned areas.

Projects Manger

Yam Technologies LTD
01.2011 - 01.2012
  • IT& Physical Security System Integrators, Travelling to Saudi Arabia to apply the PMP knowledge and experience in a new environment to get new challenge ( dealing with multinational staff, working in a lot of projects in parallel , apply
  • PMP in new area of knowledge in physical security system (CCTV, AC, and Intrusion systems , working in various environment , ,......leading and motivate teams for working in harsh environment temperature and dusty weather), working on updating the company profile, hold meeting with customers in all projects to meet the projects constrains including time, cost , quality, scope management , in addition to risk, budget,… management
  • Type of Business or Sector

Manager

Qarun Petroleum Company
01.2007 - 01.2011
  • Exploration and Production of Oil and Gas
  • Telecom Gen
  • As Qarun one of the 7th biggest Oil companies in Egypt with 5 buildings in Cairo HQ and 8 main sites in addition to its remote sites, after COVIDE-19 pandemic, there was a lot projects should be completed and finalized ASAP, another challenge that we should plan for Merge between
  • KPC and QPC, Telecom and IT were the 1st team should coordinate and working urgently as all another teams waiting to connect between Telecom and IT networks in both of companies, in addition to plan for a lot of strategic projects to unify and integrate between all systems in addition to Teams in the same time which deeps the challenges to collect merge benefits which was urgently aimed by Company partners EGPC and the great investor in Oil & Gas in Egypt
  • Appache., Qarun Petroleum company, Telecom Sector
  • Exploration and production of oil and gas
  • Occupation or Position Held Telecom Department Head
  • Main Activities and Responsibilities Develop, maintain, and effectively execute project plans throughout the life of assigned project(s) according to established procedures, channels, and success expectations
  • Create and maintain a project schedule, which defines activities, sequence, dependencies, work effort, duration, and associated resource requirements
  • Define, negotiate, communicate, and manage the scope of the project
  • Define, negotiate, communicate, implement, and monitor quality standards on all project deliverables
  • Forecast, track, and manage project budgets, POs, and invoices
  • Manage quality
  • Name and Address of Employer
  • Type of Business or Sector
  • Date
  • Occupation or Position Held
  • Main Activities and Responsibilities
  • Page 4 of 9 trade-offs, escalating all issues to the project team as required
  • Plan, lead, and facilitate regular cross-functional project team meetings
  • Identify, analyze, prioritize, mitigate, and communicate project risks
  • Maintain risk and issue logs
  • Requests all appropriate resources to meet project needs
  • Plan and manage communication plans with the project team managing internal and external project communications, ensuring effective exchange of project information and deliverables
  • Monitor schedules, issue logs and risk management plans and provide warnings of serious deviations or variations that may compromise project results
  • Proactively identify changes in work scope and ensure appropriate planning measures are taken with internal and external clients to reassess, renegotiate and amend scope of work responsibilities, proposals, contracts, and budgets
  • Communicate all changes in scope with management and project team
  • Facilitate any approved and difficult modifications to the project plan
  • Work with functional managers to resolve schedule and resource conflicts
  • Ensure required project data and information is regularly entered into the project tracking document and the project management and knowledge management systems
  • Travel, as needed, to attend client meetings or provide oversight and assistance for off-site requirements
  • Qarun Petroleum company, Telecom sector
  • Exploration and production of oil and gas

Wireless and Microwave

Qarun Petroleum
01.2005 - 01.2007
  • Section Head
  • Telecommunication Projects planning, Scheduling and Supervising in addition to most of Senior
  • Telecomm Engineer responsiplities and activities and more administrative jobs such as new
  • Engineers, Technicians, and operators’ evaluation
  • Telecom Sector
  • Type Of Business or Sector Exploration and Production of Oil and Gas

Qarun Petroleum
01.2003 - 01.2005
  • Telecom Sector
  • Type Of Business or Sector Exploration and Production of Oil and Gas

Junior Telecom Engineer

Occupation Or Position
01.2002 - 01.2003
  • Main Activities and Responsibilities Transfer to Main Head Office at Cairo for supervising maintenance of telecom equipment, Telecom jobs coordination between Telecom Dep
  • At Head Office and different company sites and preparing daily, monthly and annual Telecom Reports
  • Supervising and training new Telecom Engineers for installation and maintenance of Telecom equipment at Petroleum production and exploration sites, in addition to administrative tasks (acting as Telecom Department Head) in addition to Telecom Projects follow up and execution

Qarun Petroleum Company
01.2000 - 01.2002
  • Telecom Sector
  • Type of business or sector Exploration and Production of Oil and Gas

Education

B.Sc. - Communication and Electronics

Zagazieg University

Training course in OGS - undefined

Attending training course for presales engineers in PELCO CCTV system - undefined

Attending training course in Dubai, Schneider Structure Cabling System 2018. - undefined

Cambium network products certified in England - undefined

Attending course in Dubai in Tyco Security Products Victor VMS and Video Edge - undefined

Attending PMP course to refresh my information about PBBOK last version - undefined

Motorola PTP broadband Microwave System (PTP300&PTP500) certified from Systel - undefined

Attending course in OGS company for Problem Solving and decision making - undefined

Attending C Voice course for voice communication - undefined

10. Redline AN80i and AN50e certified for operation, Maintenance, and installation - undefined

11. Attending Project Management Professional Course (PMP) in Amideast to prepare for obtaining PMP certification - undefined

12. Cisco certified Network Associate CCNA - undefined

13. Systel Certified for installation, programming and configuration of two-way radio system - undefined

Skills

Desired employmentundefined

Accomplishments

  • Page 6 of 9
  • Systems and Equipment:
  • Installation, Maintenance and Operation of the Following Equipment:
  • CCTV & VMS system American Dynamics &
  • Victor
  • Broadband Microwave System Cambium Network
  • Broadband Microwave systems
  • Redline Communications
  • Meridian Digital PABX option11, Option61and 61C Northern Telecom
  • Digital Microwave System “ Point To Multipoint ” SR- Telecom
  • HF Two Way Radios
  • Harries
  • VHF Portable and Mobile Radios
  • Motorola
  • Sound System &TV Network
  • Philips & Wisi
  • Public Address and General Alarm System
  • Spector Lumenex
  • HDSL PAIRGAIN
  • Solar cell systems BP
  • Satellite Systems V-Sat
  • Direc Way
  • Data and Voice Multiplexers MEMOTECH
  • VOIP Switches Quantum
  • Video Conference System Tandberg, Achieved projects
  • 1- SR 500 Microwave “Point to Multipoint TDMA System (1998-1999):
  • Microwave link to two production sites (80 Km) through microwave repeater powered by solar cell system and follow up Telecom Tower installation, This Project is achieved for cost reduction for annual running cost from $ 72,000 to $ 3,000
  • Telemobile VHF link (1998-1999):
  • VHF Telephone Link form Telecom Egypt Exchange to company production and exploration site (antenna installation, RF power budget (Path calculation)) Fiber Optics (2004-2005):
  • Team leader for evaluation and execution of 30 Km fiber optics link project from Telecom
  • Egypt to Production and exploration Main site in Western Desert, This is achieved for cost reduction for annual running cost for voice and data from $30,000000 to $ 30,000
  • Redline Microwave Project (Phase 1) “Broadband OFDM Microwave Network” (2005-2006):
  • Team leader for technical and commercial evaluation tender project through studying and revision of technical tender documents in addition to practical evaluation through demos for voice quality, data transfer speed, system reliability and availability This This achievement resulted in cost reduction for annual running cost for voice and data from $6, 000000 to $ 12,000
  • Nortel PABX upgrade (Option 61 and Option 61C) (2005-2006):
  • In This Project hardware and software system is upgraded for Head office and Company site in western desert, in addition to cost optimization in this project priority is focused on down time minimization
  • Video Conference system “Tandberg 990” (2006-2007):
  • To establish video conference links between head office and production and exploration sites, this project is achieved mainly to increase productivity, reduce costs and notable reduction of downtime
  • Page 7 of 9 Redline Microwave Project (Phase 2) (2007-2008):
  • This project is initiated to extend microwave coverage area of microwave system
  • Phase 1 to another area in western desert
  • This achievement resulted in cost reduction for annual running cost for voice and data from $4, 000000 to $ 8,000
  • Public Address and General Alarm System (2008-2009):
  • To be used for emergency cases, evacuation, and Telephone calls for industrial application in hazardous area
  • Redline Microwave Project (Phase 3) (2009-2010):
  • This project is initiated to extend microwave coverage area of microwave system
  • Phase 1 to another area in western desert
  • This achievement resulted in cost reduction for annual running cost for voice and data from $5, 000000 to $ 10,000
  • Motorola backbone Microwave links to connect between 5 main sites in QPC (2010-2011):
  • This project has been initiated and achieved to be used for voice, video, and data transmission between sites in 5 different governates, these links distance range from 20Km to 80Km, most of these links has a lot of environmental challenges, specially ducting, so it takes great efforts to be stable and some of them overcome these phenomena using space diversity
  • These links represent a breakthrough for the company as it provides a high speed and very cost-effective solution, the annual cost saving because of this project was $4, 000000
  • CCTV, AC and Intrusion systems Projects in Saudi Arabia (2011-2012):
  • A lot of security projects in different areas and different cities (Jeddah, Riyadh
  • Madina, …….) Saudi Airlines Airports in Riyadh, Jeddah &GDC Middle East &
  • Tetra Pak Factory & restaurants Series, Abo Dawood Warehouses, Al Naghi Cargo
  • Transport Fleet using PELCO, Honeywell, American Dynamics, CEM…
  • Systems
  • American Dynamics CCTV System in QPC Head Quarter, in Egypt (2012-2013)
  • Phase-1:
  • This system was the 1st Hybrid CCTV system in Egypt and the 2nd system in the
  • Middle East, it was the most cost-effective solution and long-life cycle system as it combines both of analog and IP cameras, as the system was advanced and not available in Egypt and the system was urgently required, so a condition in tender has been added to install until receiving the requested system, also the system has been included VMS not only HNVR and workstation
  • CCTV System in QPC Head Quarter, in Egypt (2013-2014) Phase-2:
  • Extend the hybrid CCTV system to cover another 2 buildings in Cairo Office, which was very useful to monitor all buildings, entrances, surroundings, fences, in addition to important areas like Bank, Clinics ,……, also CCTV system became very useful tool in emergency cases and emergency drills
  • Dedicated and shared Satellite systems (2002-2016) in QPC:
  • Dedicated and shared satellite station to be used for emergency cases in the main sites (emergency voice and fax messages using high compression techniques) in addition to Drilling rigs in the areas where there is no microwave coverage
  • Physical security and fire alarm systems projects in Saudi Arabia (2016-2018):
  • The above-mentioned projects for NCB Bank, Aljazeera Bank, Black Rock office
  • JP Morgan Office, SAP office, BNYM…… (The above-mentioned projects have been achieved using Tyco, PELCO, BOSCH, AXIS Products)
  • CCTV System upgrade from Hybrid to pure IP system, in addition to new extensions in QPC Head Quarters Buildings (2019-2020):
  • The Challenge in this project is that working only out of working ours in addition to strict safety rules as there wasn’t cabling paths and all vertical paths using EMT pipes out of the buildings, in addition down time while transition from the old to the new system
  • Page 8 of 9 Upgrade the QPC LAN networks in Production and exploration areas (2019-2022):
  • This project covers the 5 main sites in western desert, Fayioom and Beni Suef to save the required BW for video communication (CCTV and video conference system) in addition to voice and data applications, the upgrade is mainly based on
  • Fiber network and broadband microwave
  • CCTV system for all Security gates in all main QPC Production sites (2019-2022):
  • This project has been initiated to monitor and control all security gates in all QPC sites in western desert, Fayioom and Beni Suef for Security and safety purposes as many of these gates is spread in desert areas, so earthing and grounding in addition to backup power systems
  • CCTV system for Health & safety purposes (2021-2022):
  • This system has been initiated to cover all mess halls and kitchens in all company camps to monitor and control all activities for health and safety purposes
  • Develop and maintain Video conference system (2020-2023):
  • This project covers at all main conference rooms as it was badly needed starting from COVID19 pandemic and till now as it is mandatory to save time and cost in addition to taking decision quickly, on the other hand all General assembly meetings between board members and Minister of Petroleum and Mineral
  • Resources
  • Upgrade the fiber backbone to connect all company fields to HQ (2019-2023):
  • Connecting between the 2 biggest sites in Western Deserts through Telecom Egypt
  • Fiber network using STM1 links to save the required BW for all Voice, Video, and data applications
  • Success Story: Fiber Link between 2 QPC sites in Western Desert (2021-2022):
  • Connect between 2 main sites in the Western Desert using fiber link, there was a great challenge in this project, I got information that a project for MV cable between the 2 sites will be carried out within 4 weeks, so the time was very critical and tight
  • I saw that it is a great business opportunity, but it has many challenges as following:t: I worked all the time, day, and night to study and confirm that there is no technical risk to extend the fiber cable in the same conduit.d it takes great effort to persuade my managers that it is a great business opportunity.d I need to motivate my team to proceed in this difficult project.h if we proceed with foreign purchasing the project will be cancelled, on the other hand fiber cables availability was very hard due to current national projects, finally I succeed to agree with one of high-quality factory to book 44Km on my responsibility.h there was great conflict with the main project schedule
  • After a lot of negotiations, I succeeded in persuading the main contractor to accept the fiber link fiber project.h the project budget was very small, I succeeded in being aligned with the very small budget only through a lot of negotiations
  • New& Upgrade Vodafone and Orange networks in the main 5 sites (2019-2024):
  • The key factor for this success is the successful negotiation based on win-win situation rule between QPC and Both of Vodafone and Orange as the challenge that no
  • Of customers is small, and ROI is very slow
  • Projects in progress: Page 9 of 9 Strategic Link to Connect between KPC and QPC Network:
  • Based on a lot of Engineering study there was great business opportunity as QPC broadband network which has access to Telecom Egypt Fiber Network in 3 locations, the 1st connection in Cairo and the 2 remaining connections in western desert, one of them is about 120Km way from KPC network, in the middle point there was new promising concession, so it will be considered as drop repeater, on the other hand new height telecom tower will be established and will be used for PMP system, VHF in addition to GSM networks
  • Establishment 5 Telecom Towers:
  • The above-mentioned towers will be used for PTP, PMP, VHF in addition to GSM operators to cover new concessions including production and exploration activities
  • CCTV projects in 3 main sites in western desert:
  • The above-mentioned projects have been initiated due to business need for safety and security purposes in addition to emergency cases, in this project all security gates in the desert will be monitored and controlled to help Security and HSE department to insure vehicle and trucks movement according to HSE and security regulations
  • 5

Timeline

Gen. Manager

Khalda Petroleum Company
01.2023 - Current

Sector Manager

Qarun Petroleum Company
01.2018 - 01.2021

Physical Security Systems integrator

Secure Concept, Riyadh Area Manger
01.2016 - 01.2018

Telcom Sector Manager

Qarun Petroleum Company
01.2014 - 01.2016

Dep. Manager

Qarun Petroleum Company
01.2012 - 01.2013

Projects Manger

Yam Technologies LTD
01.2011 - 01.2012

Manager

Qarun Petroleum Company
01.2007 - 01.2011

Senior Telecom Engineer

Occupation Or
01.2005 - Current

Wireless and Microwave

Qarun Petroleum
01.2005 - 01.2007

01.2003 - Current

Qarun Petroleum
01.2003 - 01.2005

Junior Telecom Engineer

Occupation Or Position
01.2002 - 01.2003

Telecom Engineer

01.2000 - Current

Qarun Petroleum Company
01.2000 - 01.2002

B.Sc. - Communication and Electronics

Zagazieg University

Training course in OGS - undefined

Attending training course for presales engineers in PELCO CCTV system - undefined

Attending training course in Dubai, Schneider Structure Cabling System 2018. - undefined

Cambium network products certified in England - undefined

Attending course in Dubai in Tyco Security Products Victor VMS and Video Edge - undefined

Attending PMP course to refresh my information about PBBOK last version - undefined

Motorola PTP broadband Microwave System (PTP300&PTP500) certified from Systel - undefined

Attending course in OGS company for Problem Solving and decision making - undefined

Attending C Voice course for voice communication - undefined

10. Redline AN80i and AN50e certified for operation, Maintenance, and installation - undefined

11. Attending Project Management Professional Course (PMP) in Amideast to prepare for obtaining PMP certification - undefined

12. Cisco certified Network Associate CCNA - undefined

13. Systel Certified for installation, programming and configuration of two-way radio system - undefined

Mohamed Ebrahim Gomaa