Skilled Engineer around 14 years and half experience in oil and gas field production, utilities, process and commissioning operations. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
Working in oil& gas processing plants
- Monitoring process parameters, controlling/optimization the production, trouble shooting and analysis to processing/separation of Water, Salt, Oil and Gas from the crude oil obtained from different field (Wells) with zero accidents.
- Optimizing day to day operations performance and smooth functioning through better coordination with other departments (Instrumentation, Mechanical, Electrical, and Safety).
- Ensure as per P&ID- leak/hydro/pressure test of vessels, Line flushing, Vessel flushing, Nitrogen purging, depressurizes, vent, draining and vessels cleaning with maintenance team.
- Responsible for evaluate the process pipelines & vessels thickness using Ultrasonic (NDT) Method and compare with technical specifications and economic factors relating to process.
- Monitoring the flowing Crude Oil & Treatment Chemicals (Evaluation of the performance) such as De-mulsifier, Gas/Oil Corrosion Inhibitor, Antifoam and water injection chemicals like – Biocide, Oxygen Scavenger, Water Clarifier, and Scale Inhibitor.
- Ensure the quality of crude oil (BS&W, API gravity, RVP and Salt content below 30 PTB) and produced water quality with cost/ consumption optimization of treating chemicals.
- Worked as an active member during the plant shutdown/ startup for periodically maintenance activities. And lead Engineer with Corrosion Control/Inspection Management.
- Independent night shift in charge (Team Leader) of about 50 peoples (Engineers, Supervisors, DCS Panel Operators, Safety Officer, Technicians & Assistants) to boost up the plant maintenance activities to with zero accidents.
- Worked as an active member during the plant shutdown/startup for periodically maintenance activities. And lead Engineer with Corrosion Control/Inspection Management.
Operating on DCS (Foxboro)
- To coordinate with DCS operators (Provide operational guidelines as and when required) for trouble free operation and major process parameters such as Flow, Temperature, Pressure, Interphase Level and Mixing Valve Pressure (ΔP) to improve the quantity & quality of export crude oil.
- Worked as a DCS commissioning incharge during the DCS commissioning time; Graphics page modification, function test of the instruments, function test of the equipment, test run of the running equipments without load, valve exercising, status checking with compared to the field, all F&G detectors calibration, ESD system function test as per cause and effect diagram.
Operating Gas turbines for compressor set at gas injection plant
- Monitoring flowing parameters through (DCS ) for set pressure, Temperature, flow rate & controller according to manual and slandered for Gas Turbine comply with the current condition for well injection and reservoir characteristics.
Commissioning / Start up & Troubleshooting of oil &gas processing plant
Commissioning / Start up & Troubleshooting of gas injection plant.
Very good with Honor , Ranked 2nd class , GPA: 3.18, GPA: 78.6
Diploma of Higher Studies in Interdisciplinary Diplomas - Petroleum & Natural Gas Engineering with the rate of appreciation ( B ) ( 3.1) & Excellent Grade in Diploma Project.
Chemical engineering
NACE Senior Internal Corrosion Technologist , Cert No . 202202 , Expiries on February 28 .2026
· Distinguished employee award in El- MANSOURA Petroleum Company 2019 .
· Development and modifying in process field by get ride water disposal in safe condition which reflect on costly wise , time saving , Integration Assets and trucks saving for transfer disposed water.
· Enhancement painting progress for defects located on some valves, vessels , pipes and steel structures in process area before reaching to criticality (external corrosion) as temporary solutions in absence of painting tender .
Military status accomplishment from MAY 2008 to JUNE 2009