
Dynamic Senior Civil Engineer recognized for strong leadership and attention to detail. Successfully managed multiple residential projects, ensuring quality control and addressing implementation errors through effective reporting and corrective actions.
supervising the concrete work, masonry work, and finishing work for several residential buildings in New Cairo.
worked on preparing reports on the suitability of the building and reports for addressing various implementation errors, while supervising the implementation of the corrective methods for AL montada company
Responsible for receiving excavation, replacement, and concrete works up to the concrete walls and insulation for water pumping station No. 17 with a capacity of 4 m3 per second
Responsible for various finishing works for Beta Tourism Company, including marble flooring, electrical work, low current , as well as painting, doors, and aluminum work.
I have worked on numerous projects with various companies, including:
Working with Orascom on the external painting of the R5 residential area in the New Administrative Capital
Working on the construction of the sorting and packing station in 10th of Ramadan City with Al-Dunya Company
Working on the construction of residential villas in Madinaty with Alexandria Construction Company
Working on the construction of underground fire water tanks and the implementation and installation of the fire network at the Heliopolis Chemicals Factory