- Aspen HSYS

I have eight years' experience in experimental life, divided as two
years in renewable energy and six years in oil and gas industry,
between corrosion field and in gas processing field (till now).
Sharing in MELEIHA Gas Plant Commissioning and Startup.
- (Separators, JTV for Dew Pointing, Membrane for Sweetening,
Condensate Stabilization, Reciprocating Compressors, Oil Heaters, 2 Screw
Air Compressors and 6 Gas Generators).
- 5 Gas Wells Are Controlled from Control Room Through Telemetry
System).
Sharing in Gas Wells Commissioning and Startup.
Sharing in preparing wells start up procedure.
Sharing in preparing sales gas line start up procedure.
Sharing in sales gas line start up.
Follow up all troubleshooting in gas plant startup like... Inlet compressors
coupling failure, suction bottle cracking.
JT valve optimization.
Membrane units start up and isolation.
Stabilizer optimization (temperature and specs).
Startup and shut down for plant and monitor DCS.
Monitors equipment and systems performance.
Share preparing daily performance summaries to monitor plant performance.
Includes studying laboratory test reports.
Sharing in sales gas line Cathodic Protection Commissioning and start up.
Monitoring Cathodic Protection System for Sales Gas Pipe Line.