Dynamic Project Manager with a proven track record at ADCONS, adept in strategic planning and risk management. Excelled in delivering high-quality projects on time by mastering project scheduling and fostering team collaboration. Known for innovative solutions and mentoring junior staff, significantly enhancing project outcomes and operational efficiency.
Project Management
Project Planning
Project planning and development
Project tracking
Strategic Planning
Risk Management
Schedule Management
Work flow planning
Project Scheduling
Cost Control
Document Management
Data Analysis
1-GARDENIA CITY: START 2013 TO 2014
work as consultant with the major project management for the armed force
Construction work on 6-storey buildings with concrete, integrated finishing, and service buildings
2-TOLIP HOTEL AND RESORT EL-NARGS: START 2014 TO 2016
work as consultant with the major project management for the armed force
Establishing a hotel containing 242 rooms, an administrative building, a walkway, a landscape, and a mosque.
3-BICYCLE PARK MASTAKBAL CITY: START 2017 TO 2018
The track is located on an area of more than 210 acres and has 3 km of bicycle paths. The track contains a park that includes playgrounds, restaurants, cafeterias, artificial lakes, a parking area for bicycles, rest areas, restrooms, and a mosque.
4-VISUAL IDENTITY PROJECT IN SHARM ELSHEKH START MAY 2020 TO END OF 2021
Developing sidewalk works, making advertising display screens with steel structures and concrete bases, and creating information offices for tourists and transportation waiting areas
5-SCENARIO COMPOUND IN THE NEW ADMINISTRATIVE CAPITAL START 2021 TO 2023
Reinforced concrete works Cluster consists of 3 buildings with the same basement, roof, and post-tension concrete ceilings.
7-THE MILITARY ENTITY IN THE ADMINISTRATIVE CAPITAL: START DATE 2015 TO NOW .
-NATIONAL SERVICE WORKSHOP :
An administrative building with an area of 600 square meters flat slap , a steel hangar with an area of 8000 square meters, a flat helicopter concrete floor and11 steel awnings with concert bases .
8-INFRASTRUCTURE IN EL-QADA VILLA'S & SUBMERSIBLE PUMPS
A sewage, water, and irrigation network, an agricultural network, and a fire-fighting network with its accessories, 13 kilograms long, PVC and polyethylene pipes of different diameters And submersible pump works.
9-SERAYAT AL-QATAMIEH COMPOUND: START DATE JAN 2020 TO MAY 2020.
A sewage and water network, fire fighting network works, and interlock road works with a length of 4 km.
over all site skills :
Oversaw the entire wooden work for the building, ensuring consistent quality and adherence to specifications. Led the installation of the raised floor system throughout the building, creating a functional and adaptable workspace.
Implemented a comprehensive fire protection strategy across the entire building, prioritizing occupant safety. Delivered the gypsum board ceiling installation for all six floors, ensuring a clean and finished aesthetic.
Overseen civil and architectural aspects of construction projects, ensuring compliance with design specifications, building codes, and safety regulations.
Managed site operations, including scheduling, coordination of subcontractors, material procurement, and quality control to ensure project milestones are met on time and within budget.
Interpreted architectural and engineering drawings, plans, and specifications to guide construction activities and ensure accurate implementation of design intent.
Implemented quality assurance procedures to monitor construction activities, inspected workmanship, and addressed any deviations from quality standards to maintain project integrity.
Assisted in monitoring project costs and expenditures, identified cost-saving opportunities, and ensured efficient utilization of resources to maximize project profitability.
Enforced safety protocols and procedures to maintain a safe working environment for all personnel on site, conducted safety inspections, and addressed any safety concerns promptly.
Provided technical support and guidance to construction teams, subcontractors, and vendors on civil and architectural aspects of the project, resolved technical issues as they arose.
Prepared and submitted regular progress reports, including work schedules, manpower requirements, and project status updates to project management and stakeholders.
Evaluated proposed changes to project scope, specifications, or schedule, assessed their impact on civil and architectural works, and provided recommendations to mitigate risks and ensure project success.