PERSONAL SUMMARY
Professional Project Manager with wide experience at Mega Projects as Infrastructure, Industrial Construction, Commercial & Residential
Construction, Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.
Looking for career enhancement at respective Company to upgrade experiences, Skills and knowledge at Management Level
Construction Project Management
16.5 Years as Contractor + 2 Years as Consultant PMC, decomposed as follow:
Project Engineer & Superintendent Engineer for 8 Years
Construction Manager for 4 years managing Red-Book contract
Project Manager as Contractor for 4 Years managing EPC Contract
Project Manager RE PMC as Consultant for 2 Years managing Red & Yellow Book Contracts FIDIC Module 1 & 2
Project Management Professional (PMP)®
Office, AutoCad, SAP2000, Primavera P6, Revit, Navisworks
Join date 15 April 2021 at Cosmos-E as Project Manager Resident Engineer for PMC Projects
Current Project: Project Manager PMC of Metro & Passengers Coaches Factory Project (NERIC ROLLING STOCK PLANT) at
East Of Port said/Egypt
Previous Project: Project Manager PMC of Steel Factory Construction Project (5 MTPY Beneficiation and Pelletizing Plant) at
Suez/Egypt
Job Responsibilities include the following: -
Project: PP14 (Power Plant) Riyadh, KSA. Since April 2016 till May 2020
14 industrial buildings construction in the power plant PP14
https://www.dar-engineering.com/Port_Power_Gen_3.html
Owner: Saudi Electricity Company CO. https://www.se.com.sa/
Engineering: Dar https://www.dar-engineering.com/
Consultant: Worley Parsons Ltd https://www.worley.com/
Main Contractor: AlKifah For Contracting http://www.alkifahcont.com/
Contract Type : EPC/Turnkey
Duty responsibilities in details:
Project: C26 (Air defense base) Jubail, KSA. Since Nov 2013 till Mar 2016
Work responsibilities were as follow :
Project: Florenza Resort & Beach Hotel (****) 4 stars at arabia zone, Hurghada, since
10/2010 http://www.florenzakhamsin.com/
site works include more than 30000 m3 reinforced concrete works
more than 100000 m2 finishing work.
Owner : Rodan Group http://www.rodan-group.com
Engineering : Tariq Fouad
Consultant : Tariq Fouad
Duty responsibilities in details:
Project: Riviera Sharm Resort, 204 Naama Bay, Sharm El Sheikh, Sinai.
https://www.facebook.com/Riviera-Sharm-Resort-102230073155430/
site works include more than 15000 m3 reinforced concrete works
more than 50000 m2 finishing works
-Drawing 2D interiors for resident units.
-Interiors& Maintains engineer for resident units
-Design, drawings & supervision for 10*10 cm tiles colored distribution system, (Flooring of musical fountain pool).
Owner : El-Motaheda Co.
Project: Falcon Naama Star Hotel (****) 4stars, 26+27 Naama Bay, Sharm El Shekh, Sinai
http://falcon-hotels.com/naamastar/
site works include more than 1500 m3 reinforced concrete works
more than 30000 m2 finishing works
-responsible to supervision for Interiors and finishing works for 110 room 1st stage
Owner : Rodan Group http://www.rodan-group.com
Duty responsibilities in details:
Residential and commercial projects
1- (Cosmos-E PMC Projects)
PMC Project Manager for first of its kind at Egypt for Mega 2 projects as following:
A- Metro & Passengers Coaches Factory Project (NERIC ROLLING STOCK PLANT) at East Of Port said/Egypt which is the first factory to localize the Metro & Passengers Coaches manufacturing industry with Construction Value 1,700 Billion EGP
B- Steel Factory Construction Project (5 MTPY Beneficiation and Pelletizing Plant) at Suez/Egypt which is the first factory to support fabrication of the Rail ways Tracks at Egypt with Construction Value 2,000 Billion EGP
2- (ALKIFAH Holding (KCC) projects)
1. Started work as Infrastructure superintendent responsible for the infrastructure, Roads & Utilities in C26 Project (Air defense
base), Jubail, KSA with Construction Value 300 Million SAR from Nov 2013 till March 2016
Work responsibilities were as follow :
• Utilities works
(Coordination drawings with Arch, Civil & MEP, checking IFC drawings conflicts and issues, execute MEP networks as (sanitary,
storm, potable water, Irrigation, PECD, low voltage, medium voltage), follow the work targets complying Project requirements &
Quality procedures, finalize road work related activities as catch basins, manholes, JBR, Curbstone, walkways, Lighting poles,
Duct banks, MEP underground networks)
• Road works
(Sub grade, sub base, base course, asphalt grade 2 (1st layer 7cm, 2nd layer 5cm)) with all required tests for layers as the
requirements for more than 7 km
• Construction Work
(Precast 177 catch basin, 100 Manhole footings, 600 Lighting poles footings, fixing JBRs, Lighting poles, covers, Lift station, MEP
networks Excavations & Dewatering systems
2. Started as Site Superintendent then promoted to Construction Manager then Project Manager in PP14 Project (power plant ),
Riyadh, KSA with Construction Value 200 Million SAR from April 2016 till May 2020
work responsibilities were as follow :
• Construction work
(Execute Construction Arch, Civil, MEP, Substructure & superstructure as Precast/Steel structure, following coordination with other
parties)
• Management work
(Project Management, Resources Management, following scheduled, follow Project Safety requirements, reviewing technical issue
for all site with Technical Manager, Following client invoices and cash flow, client progress/coordination meetings, Acting as
Contract Admin to support project claims with Client )
3. Promoted as KCC Contract Manager at PMO Dept. starting from June 2020 till Jan 2021
3- ( El-Motaheda Co. Projects )
1. work as Construction Manager responsible for construction, infrastructure & Utilities in Florenza Project (4 star resort), Hurghada,
Egypt with Construction Value 80 Million EGP from 1/Oct/2010 till 30/Oct/2013
work responsibilities was as follow :
• Utilities works
(sanitary, potable water, irrigation, low voltage, medium voltage networks)
• Construction work
(construction for 22 building + finishing for 10 buildings, swimming pole, landscape )
• Management work
(following Cash flow, invoices, time scheduled, manpower & equipment )
2. work as Construction Manager responsible for construction, infrastructure & Utilities in Riviera Sharm Project (4 star resort), Sharm El Shikh, Egypt with Construction Value 100 Million EGP from 1/Oct/2004 till 30/Sept/2010
work responsibilities was as follow :
• Utilities works
(sanitary, potable water, irrigation, low voltage, medium voltage networks)
• Landscape work
(internal roads, curbstone, walkways, interlock, finishing surrounds areas)
• Construction work
(construction for 40 building + finishing for 50 buildings, two swimming pole, 1 lack, 1 fountain )
• Design work
(civil design for 4 buildings 10 stories, 2 villas, 1 mall 7 story, factory steel structure cover)
• Management work
(following Cash flow, invoices, time scheduled, manpower & equipment )
3. work as Project engineer responsible for construction & Finishing in Falcon Naama Star Project (4-star Hotel), Sharm El Shikh,
Egypt with Construction Value 30 Million EGP
work responsibilities was as follow:
• Landscape work
(curbstone, walkways, interlock, finishing surrounds areas)
• Construction work
(construction + finishing for 101 room Building, 1 swimming pole)
6/8
• Wood work
(Housing furniture manufacture, wood balcony for all rooms, wood shelters, reception steel-wood structure)
Project Manager Resident Engineer at Cosmos-E Engineers and Consultants Mobile number : +201140750197
Project Management Professional (PMP)®