Overview
Work History
Education
Skills
Additional Information
Certification
Timeline
Generic

Sally Nessim

Technical Office Team Leader
6-October

Overview

12
12
years of professional experience
5
5
years of post-secondary education
1
1
Certification

Work History

Sr. Mech. Tech. Office Engineer

MINISTRY OF DEFENSE
06.2017 - 01.2019
  • Review all shop drawing for infra-structure works (drainage networks, fire networks and irrigation
  • Networks)
  • Coordinate infra-structure services via road another trades
  • Follow up the S/C for all shop drawings, progress…
  • Etc
  • Review the drawing with consultant to get approval for submitted shop drawings
  • Solve site problems and make modification on drawings according to site situation
  • Review the design drawings and figure out the issues and rise the relevant RFI’S
  • Check BOQ, Vendor list and compare with design drawings
  • Review shop drawing for all firefighting and sprinklers distribution works
  • Review shop drawing for drainage network underground and high level
  • Review shop drawing for drainage toilet details
  • Review shop drawing for water Supply toilet details.

Technical office Team Leader

Badr El-Din Group
1st Floor, Bldg.1, Arkan Mall, El Sheikh Zayed, Giza, Egypt
06.2019 - Current
  • Designing, revising, following up, coordination with client and contractor sides, preparation of project specifications and the other tender document and for Air conditioning and ventilation systems, Fire Fighting system, Plumbing system and Infra structure.
  • Design review Preparing Cost Estimate.
  • Contractor’s Technical office for Engineering services, preparing shop drawings, Re-calculation,reviewing, design drawings, tender documents, material submittals in accordance with project specifications.
  • Complete site supervision of mechanical works includes Shop drawings review, and material submittals and site supervision on contractor works.

Mech. Tech. Office Engineer

Scope, MALL OF EGYPT
01.2017 - 01.2019
  • Review shop drawing for all firefighting and sprinklers distribution works
  • Review shop drawing for drainage network underground and high level
  • Review shop drawing for drainage toilet details
  • Review shop drawing for water Supply toilet details
  • Prepare shop drawing for firefighting and domesticwater supply Pump room
  • Review shop drawing for submersible pumps details
  • Review shop drawing for riser diagram for watersupply and drainage system
  • Coordination for the MEP trades with structureworks and architecture
  • Make coordination with firefighting and HVAC workswith false celling drawings
  • Review all shop drawing for infra-structure works (drainage networks, fire networks and irrigation
  • Networks)
  • Coordinate infra-structure services via road andother trades
  • Review the design drawings and figure out the issues and rise the relevant RFI’S
  • Check BOQ, Vendor list and compare with design drawings
  • Quantity survey for all mechanical items according to approved material submittals and approved shopdrawings
  • 1Follow up the S/C for all shop drawings, progress…
  • Etc
  • Review the drawing with consultant to get approvalfor submitted shop drawings
  • Solve site problems and make modification on drawings according to site situation
  • ASSIGNED

Mech. Tech. Office Engineer

CAIRO FESTIVAL CITY MALL
01.2013 - 01.2017
  • Prepare shop drawing for all firefighting and sprinklers distribution works
  • Prepare shop drawing for drainage toilet details
  • Prepare shop drawing for water Supply toilet details
  • Prepare shop drawing for firefighting and domesticwater supply pump room
  • Prepare shop drawing for submersible pumpsdetails
  • Coordination drawings for the MEP trades with structure works and architecture
  • Make coordination with firefighting, HVAC workswith false celling drawings
  • Make coordination with all infra-structure works
  • Review the design drawings and figure out the issues and rise the relevant RFI’S
  • Check BOQ, Vendor list and compare with design drawings
  • Prepare and review shop drawing for all infra- structure (drainage networks, fire, networks, and irrigation
  • Solve site problems and make modification on drawings according to site situation.

Scope
01.2012 - 01.2013
  • 1- Prepare shop drawing for all firefighting and sprinklers distribution works
  • 2- Prepare shop drawing for water Supply toilet details.3- Make coordination with all infra-structure works
  • 4- Review the design drawings and figure out the issuesand rise the relevant RFI’S
  • 5- Prepare and review shop drawing for all infra- structure (drainage networks, fire, networks, andirrigation.

Designer Engineer

EL-BEEHA ENGINEERS
Naser City
01.2011 - 01.2012
  • Prepare design drawing for firefighting system
  • Prepare design drawing for infra structure works and plumbing works
  • Prepare design drawing for water and drainage toilet details
  • Manual calculation for HVAC system and hap
  • External Static pressure calculation for FCU


Education

BSc - Civil Engineering

Banha Engineering University
Banha
06.2006 - 06.2011

1- HVAC. 2- Infra Structure 3- Firefighting. - undefined

Skills

Date of birth: 21/6/ 1989undefined

Additional Information

  • asuitable position at your esteemed company

Certification

Project Management Professional (PMP)®

Timeline

Project Management Professional (PMP)®

01-2023

Technical office Team Leader

Badr El-Din Group
06.2019 - Current

Sr. Mech. Tech. Office Engineer

MINISTRY OF DEFENSE
06.2017 - 01.2019

Mech. Tech. Office Engineer

Scope, MALL OF EGYPT
01.2017 - 01.2019

Mech. Tech. Office Engineer

CAIRO FESTIVAL CITY MALL
01.2013 - 01.2017

Scope
01.2012 - 01.2013

Designer Engineer

EL-BEEHA ENGINEERS
01.2011 - 01.2012

BSc - Civil Engineering

Banha Engineering University
06.2006 - 06.2011

1- HVAC. 2- Infra Structure 3- Firefighting. - undefined

Sally NessimTechnical Office Team Leader