Sayed  Hassan

Sayed Hassan

Senior Production Manager With Expertise In Operation And Optimization Of Cement Lines And Mineral Processing Lines
Giza

Summary


Insightful operation manager with experience directing and improving cement and mineral production lines through efficient operation and effective employee motivational strategies and strong policy enforcement.

I worked for expert organization and common names in the field of cement industry (ASEC, FLS....) at deferent projects with variety of machines and process designs

Proficient in best practices, budgeting ,market trends and regulatory requirements of industry operations. Talented leader with analytical approach to business planning, cost control and day-to-day problem-solving.

Effectively Managing safety at production line and ensure protection of environment in compliance with law and policy


Overview

24
24
years of professional experience
4
4
years of post-secondary education
16
16
Certifications
3
3
Languages

Work History

Technical support manager

Revamp
cairo
01.2022 - Current
  • REVAMP for industrial consultancy and technical support, Founded REVAMP for industrial consultancy and technical support (cement and mineral processing industries)
  • Provided proposal for process optimization of calcination, grinding, crushing and sizing units
  • Prepared the technical feasibility studies for upgrades, modification and new projects, and supported the selection of appropriate machineries and negotiated the suppliers
  • Created a technical support plan for the clients, streamlining issue resolution process and leading the planning for supported the projects, and establish the improvement procedure
  • Technically audited the system then analyzed the data to identify areas of improvement
  • Displayed strong communication and interpersonal skills while visiting clients, sites and technical offices to support plants and modifications needs
  • Guided and supervised the execution of consulting program on daily basis
  • Directed and coached the client team till stabilizing the operation, then visiting periodically for ensuring that the procedure in place
  • Used critical thinking to break down problems, evaluate solutions and make decisions
  • Checked technical designs and drawings in case of process modifications or new installation
  • Suggested process and technical design changes to improve performance and efficiency
  • Successfully Managed and consulted the operation for 2 Active lime production plant located in EGYPT
  • Company: RIGA for engineering and industry

Technical support manager

RIGA EGYPT
Al-Anbar (kaobisa project)
01.2022 - 05.2022
  • Successfully audited the 2 lines of kopisa cement plant and issued effective status reports including recommendations and action plans
  • Guided and supported the Optimization of the pyro process and raising the productivity of the kilns to the nominal capacities (almost 6 % higher)
  • Advised adjustment of raw mix which supported solving the problem of ball formation in the kiln
  • Implemented on job training for the operators
  • Managed and directed RIGA team (28 employees) during the mission
  • Performed audit for EL-Kaem rotary kiln and provided problem solving report for the problem of huge material leakage from kiln inlet

production manager

Misr Beni-suef Co
Beni-suef
02.2022 - 11.2022
  • Mission: Managing the preparation and startup of the 2 lines of the company which were stopped for long time, and formation and training of the production team
  • Achievement:
  • Founded and systemized the production department within 2 months
  • Managed staff hiring, training and supervision
  • Prepared and maintained production reports and personnel records
  • Enforced health and safety protocols to promote safe working environment
  • Reviewed maintenance and repair problems to determine appropriate action for resolution
  • Performed the starting of line 1 within one week and started the commissioning however shortage of manpower and spare parts
  • Coached the key persons in the department
  • Implemented inspection plan and provided analysis for the chronic problems and recommended the corrective action for fixing to increase reliability
  • Performed optimization of process for line 1 (heat cos
  • Decreased from 950 kcal to 820 kcal)
  • Introduced concept of budgeting and sourced yearly materials and spare parts for production department
  • Applied on job training for supervisor and section heads during testing the performance of the ball mills
  • Advised production employees on company procedures and policies to facilitate daily tasks and responsibilities

production manager

Unity Cement
Abian
06.2018 - 01.2021
  • Established and Standardized production procedures, job roles, and quality assurance guidelines
  • Introduced the concept KPIs and yearly production plan and created continuous improvement Effectively raised the clinker production by almost 15 % compared with the previous years Achieved increasing in productivity of cement mills 20 tons per hour for each mill Coached the team leaders (11 key persons), and partially other production employees 20 % initiated and enhanced safety awareness program, safety audits and safety training Reduced process bottlenecks by training and coaching employees on practices, procedures, and performance strategies, raised morale and trust Scheduled staff to establish adequate coverage during emergency work hours and repeated circumstances
  • Responsibility and duties:
  • Page 4 of 11
  • Applied The same duties as indicated below for my role previous company, O&M Egypt
  • Site

Production Manager

FLSMIDTH O&M
cairo
10.2010 - 05.2018
  • Standardized production procedures, job roles, and quality assurance guidelines.
  • Resolved issues quickly to maintain productivity goals.
  • Sourced materials to keep up with production goals and meet customer demands.
  • Created streamlined production schedules and collaborated with production employees to communicate objectives and goals.

production manager

FLSMIDTH O&M
Beni-suef (WNCC project)
03.2014 - 05.2018
  • Achievements: lowered the heat consumption by 5% average year through process optimization decreased in power consumption by 15% average year as result of increasing feed rate achieved decrease in production budget by more than 20% since 2015 (TAD) guided the Improvement of housekeeping of the site by 7 % achieved improvement in environmental aspects by decreasing emission of Nox at main stack to less than 500 ppm as result of process optimization Built and developed the production team and coached the key persons (17 guides) formed multi-skilled team (7 CCR operator and 50 % of technicians) to cover more tasks by lower number of manpower (94% of headcount) and to avoid disturbance during emergency Raised the overall safety score of the department by 8% (achieved by enhancing the safety acts of the team and directing them to apply the safety standard and company policy) provided the training cement manufacture course (sessions and field) for cadets according to cadet program by FLS at 2016 and succeed to get 4 qualified new cadets joined the team
  • Responsibility: Overseed the production process on daily basis and ensuring that the production is cost effective from process point of view supervising production employees to ensure that work performed in a way that leads to expected outlet volumes/quality as per yearly plan Enforced the importance of the safety policy to maintain a safe and healthy work environment Successfully utilized the available physical resource to sustain the targets
  • Duties:
  • Prepared annual production plan & budget and develops to be in line with company goals (yearly, monthly, adjustment)
  • Managed the production activities through the planned and contingency plant stoppage
  • Developed and implemented department continuous improvement program as part of the overall business improvement program
  • Drove improvements for machines availability and performance by implementation of operation best practices
  • Co-ordinated and managed the production to make available on a day-to-day basis, the required product within the specified quality, cost and time
  • Constantly aimed at the best performances of the production equipment, and availability through best practice operation
  • Ensured that daily activities are handled in line with safety and quality regulations
  • Ensuring protection of environment in compliance with organization standards and regulations within my field of activities
  • Page 5 of 11
  • Monitored the abnormal operational condition and prepared the study of the RCA and proposed solutions of defect elimination
  • Controlled the process of reports related to production activities and performance (daily, monthly and yearly)
  • Supported the development of production staff by defining, and where necessary providing training in activities that support production improvement and coaching
  • Defined clear targets and objectives and communicated to other team members
  • FLSMIDTH O&M Egypt branch

Section head

FLSMIDTH O&M
Beni-suef (WNCC project)
10.2010 - 01.2014
  • Monitored the process parameters, and requested the required modification of the process to improve the performance
  • Enhanced processes by pinpointing bottlenecks and working with supervisor to resolve
  • Supervised, encouraged and evaluated cross-functional teams by coaching and empowering team members to meet production goals
  • Received issued service requests for production department, then transfer them to work orders and plan, schedule and complete jobs precisely
  • Issued service request for maintenance departments and ensured that all items have been properly done on time
  • Enhanced safety of team, to create safe working conditions for workers
  • Created TSI HIRAC for production routine and non-routine jobs(Area safety team leader)
  • Organized and coordinated activities to ensure that all activities are handled in line with safety and quality regulations
  • Reviewed the shift and technical report and Preparing for the (daily, weekly, monthly and yearly) activities report
  • Ensured the environmental rules and housekeeping begins strictly implemented in the plant
  • Planned for the yearly shutdown
  • Focused the process and analyzed the emergency shutdown of machines then provided the recommendations and action plan to be applied in each emergency case
  • Supervised the periodic inventory (quarterly and yearly) for raw material and product
  • Acted effectively to the reasonable requirements of the client and provided on time action plan to maintain client satisfaction, : FLSMIDTH O&M Egypt branch

FLS commissioning shift manager

FLSMIDTH O&M
Beni-suef (WNCC project)
03.2011 - 08.2011
  • Responsibility and Activity:
  • Coordinated with the machinery supplier representatives and contractors for doing the cold run and other machines tests and checking the interlocking of the system
  • Controlled the allocation of production workforce during the commissioning according to their skills and experience
  • Led the Commissioning for Raw mill and clinker production departments
  • Supervised the first kiln bricking and reported the performance status report on daily basis to the commissioning manager
  • Prepared final outstanding for raw mill and clinker production departments
  • Led and guided the first starting up of the kiln the available, FLSMIDTH O&M Egypt branch site: ACC

FLS commissioning shift manager

FLSMIDTH O&M
Ain EL-sokhana (ACC project)
10.2010 - 03.2011
  • Responsibility and Activity:
  • Efficient supervised the pyro-system during installations
  • Page 6 of 11
  • Inspected the finished installed items and identify the defects which negatively impact the operation, then reporting including the recommended action
  • Prepared the final punch list for deficient in the line which was not fixed yet
  • Coordinated and supervised the tests of machines (signal, rotation, cold run, and sequence), then reporting to the commissioning manager
  • Tested the interlocks and sequence of all the line and request changes or correction if needed
  • Managed the shift commissioning team and guide them to improve their skills, and get the best performance

Shift Manager

ASEC For Engineering & Management
Atbra Al-Slam project)
08.2010 - 10.2010
  • Responsibility and Activity:
  • Efficient operated the cement line from crusher up to cement mills
  • Managed and motivated the shift team
  • Applied Control of the process during the working shift
  • Monitored of the site and supervised the performance of the team
  • Guided and directed the operators
  • Performed fast effective analysis for any change in kiln behavior then trying to overcome it and reporting
  • Wrote the shift report and Recorded shift events and activities in site to support improvement
  • Delivered direct feedback to senior management regarding site visibility and status


Professional team leader

MISR BENI SUEF CEMENT
02.2021 - 11.2021

Shift Commissioning Manager

ASEC For Engineering & Management
Atbra (Al-Takamol project)
07.2010 - 08.2010
  • And Activity:
  • Coordinated with the supplier commissioning team for startup and operation of the machines
  • Supported the supplier commissioning team to overcome machine failures, and operation defects
  • Supervised the site and reporting data & observations
  • Directed the team to gain the experience of the machine supplier team
  • Performed normal tasks of shift leader in effective way company: ASEC for engineering & management

Shift leader

ASEC For Engineering And Management
Beni-Suef (Misr beni-Suef project)
09.2006 - 07.2010
  • Responsibility and Activity:
  • Efficient operated and supervised of line 1(FLsmidth design , 4800 TPD ) from crusher up to cement mills during my working shift
  • Commissioning shift manager for line 2 (Polybius design, 5000 TPD) with polysius team
  • Maximized the production capacity of kiln line 1
  • Troubleshooted equipment to reduce downtime and maximized productivities during working shift
  • Controlled the production process
  • Managed of the site and supervised performance of the team
  • Page 7 of 11
  • Trained new operator in equipment operation and enforced participation in exercises focused on developing key skills Guiding the Safety of team and machines
  • Supported the performance grantee test of line 2 and reported the data during the working shift

Kiln operator

ASEC For Engineering And Management
Beni-suef (Misr beni-suef project)
12.2003 - 09.2006
  • In the ASEC technical management for misr Ben-Suef cement project (4800
  • MTPD, ILC Kiln with 5-stages PH and their auxiliaries.)
  • Trained and supervised the performance of new mill operator at the same shift
  • Company: ASEC for engineering & management

Mill operator MBCC site

ASEC For Engineering&management
beni-suef (MBCC project)
05.2003 - 12.2003
  • Effective operation for Ball mills type, two finish mill (each one 130 MTPH) and one air swept raw mill (380 MTPH) & two crushers (1000 MPTH hummer L/S crusher and 500 MPTH double rotor clay Crusher
  • Company: ASEC for engineering & management

Junior Commissioning Engineer MBCC Site

ASEC For Engineering &management
Beni-suef (MBCC project)
09.2002 - 05.2003
  • One of ASEC commissioning team for Misr Beni – Suef cement line one
  • Responsible production engineer for calibration of all Weigh feeders and belts weight
  • Production shift engineer after performance grantee test
  • Previous experience: - practical training by ASEC team in white cement industry in El Minya white cement plant include production and quality control (more than 6 months) JOIN Italy cement for one month as shift leader at El Minya white cement plant include
  • Company: Aqua trust for industrial water treatment

Supervisor

Aqua Trust For Water Teatment
Cairo
08.2001 - 09.2002
  • Surveying the site and supervise the team, marketing through good Technicality and knowledge
  • Prepared for tenders and following up with the customers
  • Developed the treatment programs and supervised the execution
  • Determined the doses necessary for the system to achieve 100 % efficiency
  • Company: Aqua trust for industrial water treatment
  • Maintained compliance with company policies, objectives, and communication goals.

Technical representative

AQUA TRUST
El-Mansoura
03.2000 - 01.2001
  • Of Aqua trust in El delta co
  • For fertilizers and chemical industries (TALKHA) (about 13 month)
  • Implemented the chemical treatment program, chemical analysis and process instruments for Cooling towers, Steam boilers and Chillers
  • Training Courses: In APRIL 2017
  • Refractory training course by MAGNESITA at Germany
  • Page 8 of 11 In December 2016
  • PMP exam preparation course (40 h) In

Education

Bachelor of Science - Chemistry

Faculty of Silence
El-Minya
09.1994 - 04.1998

Skills

Team leader & Team Building

undefined

Additional Information

  • In 2014 Recognized and rewarded as the best manager in performance and safety
  • 2011- 214 internal auditor as part of IMS

Certification

Leading leader by FLSMIDTH institute

Accomplishments

At WNCC (2014 -2018)

  • lowered the heat consumption by 5% average year through process optimization (increase feed rate - control of oxygen)
  • Decreased the power consumption by 15% average year as result of increasing feed rate
  • Achieved decrease in production budget by more than 20% since 2015 ( Refractory TAD)
  • Guided the Improvement of housekeeping of the site by 7 %
  • Achieved improvement in environmental aspects by decreasing emission of Nox at main stack to less than 500 ppm as result of process optimization (specifically oxygen control)
  • Built and developed the production team and coached the key persons (17 guides)
  • formed multi-skilled team (7 CCR operator and 50 % of technicians) only by coaching in order to cover more tasks by lower number of manpower (94% of headcount) and to avoid disturbance during emergency
  • Raised the overall safety score of the department by 8% (achieved by enhancing the safety acts of the team and directing them to apply the safety standard and company policy)
  • provided the training cement manufacture course (sessions and field) for cadets according to cadet program by FLS at 2016 and succeed to get 4 qualified new cadets joined the team
  • Eliminated the problem of repeated refractory failure at kiln outlet and decreased the kin emergency stoppage more than 20%, by implementing modification at the kiln outlet

At unity cement (2018-2021)

  • Established and Standardized production procedures, job roles, and quality assurance guidelines.
  • introduced the concept KPIs and yearly production plan and created continuous improvement
  • Effectively raised the clinker production by almost 15 % compared with the previous years
  • Achieved increasing in productivity of cement mills 20 tons per hour for each mill
  • Coached the team leaders (11 key persons), and partially other production employees 20 %
  • initiated and led safety awareness program, safety audits and safety training
  • Reduced process bottlenecks by training and coaching employees on practices, procedures, and performance strategies, raised morale and trust (14 d continuous op)

At MBCC (2021)

  • starting the 2 lines of the plant after failure and stoppage for one year at the same time formed and systemized the production department
  • stabilized kiln line 1 and decreased the heat consumption more than 100 kcal/kg clink
  • increased the performance of one raw mill 50 % almost duplicated feed rate at lower finises) by performing full mill test and act based on the results, did on job training during this task



Timeline

production manager

Misr Beni-suef Co
02.2022 - 11.2022

Technical support manager

Revamp
01.2022 - Current

Technical support manager

RIGA EGYPT
01.2022 - 05.2022

Professional team leader

MISR BENI SUEF CEMENT
02.2021 - 11.2021

production manager

Unity Cement
06.2018 - 01.2021

Refractory by Magnesita

04-2017

Advanced excel by new Horizon

04-2016

Leading leader by FLSMIDTH institute

03-2016

PMP preparation, Intertek

08-2015

production manager

FLSMIDTH O&M
03.2014 - 05.2018

Middle management prog. - Promark

11-2013

Accountability and change culture- FLS

11-2013

Situational leadership- FLS

11-2013

Human behavior and attitude- promark

01-2012

Team building- Promark

01-2012

Managing performance - Promark

01-2012

FLS commissioning shift manager

FLSMIDTH O&M
03.2011 - 08.2011

Operation and maintenance of OK mill - FLS specialist

11-2010

Production Manager

FLSMIDTH O&M
10.2010 - 05.2018

Section head

FLSMIDTH O&M
10.2010 - 01.2014

FLS commissioning shift manager

FLSMIDTH O&M
10.2010 - 03.2011

Shift Manager

ASEC For Engineering & Management
08.2010 - 10.2010

Shift Commissioning Manager

ASEC For Engineering & Management
07.2010 - 08.2010

Kiln process - Flsmidth institute

10-2007

Business computer basics - Best academy

06-2007

Shift leader

ASEC For Engineering And Management
09.2006 - 07.2010

English lower intermediate 1&2

06-2006

Cement manufacturing 5 - ASEC

11-2005

Pyro-process - ASEC

05-2005

Kiln operator

ASEC For Engineering And Management
12.2003 - 09.2006

Mill operator MBCC site

ASEC For Engineering&management
05.2003 - 12.2003

Junior Commissioning Engineer MBCC Site

ASEC For Engineering &management
09.2002 - 05.2003

Supervisor

Aqua Trust For Water Teatment
08.2001 - 09.2002

Technical representative

AQUA TRUST
03.2000 - 01.2001

Bachelor of Science - Chemistry

Faculty of Silence
09.1994 - 04.1998
Sayed HassanSenior Production Manager With Expertise In Operation And Optimization Of Cement Lines And Mineral Processing Lines