A senior professional with more than 20 years' experience within large-scale Power Generation, Oil& Gas, Cement and residential Projects in Construction, Quality Assurance & Quality Control across six different countries with various national and international consultancies, client, main contractors and subcontractors. Having worked extensively in the field of Quality Assurance & Quality Control and covered all phases of major contracts from bid to Final Acceptance, extensive knowledge and experience with different Codes / Specifications. Proven expertise in the management of meetings, discussions and negotiations to achieve results. An effective thinker and doer with management and communication skills, able to work effectively at all levels with the ability to manage changes and achieve high quality, liaison of technical matters maintaining Health, Safety, Security and Environment standards and regulation.
Project :CFC- Podium II, Cairo Festival City, Egypt (638Million L.E)
Owner : Al Futtaim Commercial and Administrative Centers.
Project Manager : Jll
Project Consultant : RMC
Cost Consultant : AAA Consultancy
About the project.
Concrete skeleton and façade work including the related infrastructures and all embedded MEP works (Core and Shell Project).
Project : 10th. Of Ramadan Railway project (LRT) (1.6 Billion L.E).
Owner : National Authority for Tunnels
About the project.
Scope of work is the main workshop (Depot),Roubikki freight Yard main line fence ,and Shrouk car Bridge
Project : Siemens power service Project, Ain Sokhna, Egypt (311 Million EGP.).
Owner : Siemens
Project Manager: Mace
Project Consultant: Cosmos
About the project.
Siemens Technologies SAE build a services (administration, tooling, and repair) Centre for their new Power Station, located on the Cairo-Sokhna Road.
Project : GOE 6*6000tpd Clinker Cement Project, Beni Suif, Egypt (220 Million EGP.).
Main contractor: CDI, China.
Project: Abu Rawash Waste Water Treatment Plant, Egypt (5.5 Billion EGP.).
Main contractor: Orascom Construction
Project: Algiers Refinery Rehabilitation and Adaptation Project, Algeria. (900 Million EGP.).
Owner: Sonatrach, Algeria
Main contractor: Technip, France
Project: BAIJI POWER PANT 6*160MW, IRAQ(650 Million EGP).
Owner: Ministry of electricity, Republic of IRAQ
Project: El Merk Central Processing Facility (CPF), Algeria. (1.2 Billion L.E)
Owner: Sonatrach Anadarko Association (SAA), Algeria.
Main contractor: Petrofac international (UAE) limited.
Project: New Liquid Natural Gas Train Station (LNGII), Skikkda, Algeria ,(700 Million EGP)
Owner: Sonatrach, Algeria
Main Contractor: KBRII, USA
Project: Al-Shamal Cement Plant, Atbara, Sudan (500 Million L.E)
Owner: AL-Shamal Company for Cement Production
Quality processes
PMI-PMP®-Project Management professional certificate (Number: 2900365).
I 9001:2015 Lead Auditor (Quality Management Systems)
PMI-RMP®-Risk Management Professional (Number: 3258870).
PMI-PMP®-Project Management professional certificate (Number: 2900365).
ACI Concrete Filed Testing Technician – Grade 1 (Certification ID: 01359374)
ACI Concrete Construction special inspector (Certification ID: 01359374).