Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Sherif Sabri

Senior Planning Engineer
Cairo

Summary

Enthusiastic Planning Engineer who is experienced in the field of project management, construction management, progress monitoring, analysis and evaluate for various types of Infrastructure Projects. Eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of planning and scheduling roles in different types of projects. Motivated to learn, grow and excel in project and program management.

Overview

11
11
years of professional experience
5
5
years of post-secondary education
1
1
Certification

Work History

Senior Planning Engineer

National Authority for Tunnels (NAT), Ministry of Transportation
Cairo
06.2014 - Current

• Support and provide input to schedule management procedure & plan, implements the defined procedures & rules, and ensures that all approved policies and procedures are consistently implemented and administrated throughout the project duration
• Prepares Primavera P6 project schedules, uses the P6 tool to extract progress information
• Prepares P6 resource loaded, and cost loaded schedules
Prepares specific time schedules in accordance with the project phases
• Coordination of the time schedule with the project team, analyze, optimize, and report deviations and points of conflicts
• Supports the controlling activities to meet target dates in the different technical fields in conjunction with consortium partners and on site at regular intervals. Preparation of schedule reports, e.g., Critical Path and analyses possible consequences (risks and opportunities). Develop mitigation and acceleration measures
• Supports the continuous schedule feedback from different project manager's fields and site staff, collecting of relevant schedule data, evaluating impact on progress, deadlines, and contractual milestones
• Prepares progress analysis comparing actual progress with panned schedule and prepared earned value reports
• Supports the forensic analysis of events to support claim defense and claim preparation
• Support the preparation of comprehensive monthly progress report for the client with preparation of internal and external time schedule relevant reports, e.g., time schedule deviation analysis, MTAS, S-curves, variance report, critical path report, resources etc.

Site Planning Engineer

Abdullah A. M. Al‐Khodari Sons Company
Riyadh
04.2013 - 05.2014
  • Prepare realistic project schedule using the appropriate scheduling tool such as Primavera and MS project.
  • Create WBS, sequence the activities and create time & cost estimates and performance baselines.
  • Calculate optimal material requirement, manpower requirement for each stage of the projects with developing resources loading.
  • Coordinate with the project manager and other departments to ensure the execution of project works according to the planned schedule.
  • Collect periodic updates and prepare weekly and monthly updates of the projects.
  • Create variance reports (Schedule Variance and Cost Variance ‐ usually Earned Value Method (EVM) is used for this) at various stages of the project to analyses deviations.
  • Revise the plan if the progress lags or advances beyond the expectation.
  • Understand contract scope of work, quantity and get familiar with logical sequences in terms of Engineering, Manufacturing and Construction disciplines.
  • Preparing and updating of the project time schedule using PRIMAVERA 6 including Cash flow, Manpower, Equipment and Quantities.
  • Preparing daily, weekly and monthly reports for schedule, manpower, and comparing actual work performed against the performance baselines and forecast progress of all activities.
  • Identify and report activities which have a critical or potential impact on schedule.

Planning Engineer

Societe Egyptienne D’entreprises (Moukhtar Ibrahim ‐ S.E.D.E)
Cairo
04.2012 - 03.2013
  • Monitor project time schedule (Baseline Schedule) based on the contract.
  • Prepare Monthly Schedule Updates.
  • Follow Up Projects Progress and Prepare Weekly and Monthly Projects Progress Reports

Site & Technical Office Engineer

Chemicals for Modern Building - CMB for Contracting
Cairo
08.2011 - 04.2012
  • Developed cost estimates for planned projects to aid in costing and budget planning efforts.
  • Analyzed survey reports, maps, blueprints and other topographical and geologic data to plan infrastructure and construction projects.
  • Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Gathered data, incorporating into drawings, schematics and maps.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.

Trainee Planner

Ginza For Construction
Cairo
06.2011 - 07.2011

Applying the roles of planning Engineer on the project of Al Darassa Parking Garage Construction, located in the south of El Azhar Park, Cairo.

Education

Bachelor of Engineering - Civil Engineering

Zagazig University
09.2006 - 07.2011

Skills

    Project Management

undefined

Certification

PMP - Project Management Professional

Timeline

PMP - Project Management Professional

12-2023

Senior Planning Engineer

National Authority for Tunnels (NAT), Ministry of Transportation
06.2014 - Current

Site Planning Engineer

Abdullah A. M. Al‐Khodari Sons Company
04.2013 - 05.2014

Planning Engineer

Societe Egyptienne D’entreprises (Moukhtar Ibrahim ‐ S.E.D.E)
04.2012 - 03.2013

Site & Technical Office Engineer

Chemicals for Modern Building - CMB for Contracting
08.2011 - 04.2012

Trainee Planner

Ginza For Construction
06.2011 - 07.2011

Bachelor of Engineering - Civil Engineering

Zagazig University
09.2006 - 07.2011
Sherif SabriSenior Planning Engineer