Install C3/C4 Refrigeration Units & Storage Tanks At JUAYMAH NGL Fractionation Plant, Saudi Aramco, JUAYMAH, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included the basic and detailed engineering for installing two Propane and two Butane double wall full containment tanks, two Propane refrigeration units and two Butane refrigeration units, two Propane TVR unit and two Butane TVR units inside Juaymah Natural Gas Liquification Fractionation Plant.
- The scope related to the double wall full containment tanks is to review the vendor prints received from CB&I as this package has been already awarded by Saudi Aramco to CB&I during proposal phase through Novation Agreement.
- The scope related to Pressure Vessels includes the preparation of mechanical data sheets and the P.O for the vessels, then the vendor print review.
- The scope also includes participation in preparation of data sheets of Air-Cooled heat exchangers, then the vendor prints review.
Yanbu Aramco Sinopec Refinery (YASREF) Tank Farm SP1 Project, Saudi Aramco, Yanbu, KSA:
- Working as Static Equipment Team Member in the project responsible for the basic and detailed engineering activities of 33 Nos. storage tanks (fixed dome, external and internal floating roofs), 9 Nos. spheres and 4 Nos. spheroids.
- Prepare and issue the mechanical data sheets for external and internal floating roof tanks and fixed roof tanks according to Saudi Aramco engineering standards.
- Accomplish vendor prints review for external and internal floating roof tanks and fixed roof tanks according to Saudi Aramco specifications and standard drawings.
- Provide technical support at site for the construction team during the construction phase.
- Supervise the tanks erection, inspection and testing at site to assure the quality.
- Accomplish the final inspection on the erected tanks, spheres and spheroids and handover to Saudi Aramco team.
MTBE (Methyl Tertiary Butyl Ether) Supply Project, Saudi Aramco, Yanbu, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included the basic and detailed engineering activities of internal floating roof tanks.
- Prepare and issue the mechanical data sheets for internal floating roof tanks according to Saudi Aramco engineering standards.
- Prepare and issue the material requisition for tanks according to Saudi Aramco requirements.
- Evaluate technical bids and selecting the successful bidder.
- Accomplish vendor prints review for tanks according to Saudi Aramco specifications and standard drawings.
Diesel & Gasoline Storage Tanks Project, Saudi Aramco, Yanbu, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included the basic and detailed engineering activities of external and internal floating roof tanks.
- Prepare and issue the mechanical data sheets for internal floating roof tanks according to Saudi Aramco engineering standards.
- Prepare and issue the material requisition for tanks according to Saudi Aramco requirements.
- Evaluate technical bids evaluation and selecting the successful bidder.
- Accomplish vendor prints review for tanks according to Saudi Aramco specifications and standard drawings.
Olefin Saturation Unit Project, Saudi Aramco, Yanbu, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included the vendor prints review of pressure vessels and shell & tube heat exchangers according to Saudi Aramco specifications and standard drawings.
Yanbu South Terminal Rehabilitation Project, Saudi Aramco, Al mu’jiz, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included the basic and detailed engineering of the Oily Water Drain System according to Saudi Aramco Specifications and requirements.
- Prepare and issue the mechanical data sheets for vessels and tanks according to Saudi Aramco engineering standards.
- Prepare and issue the material requisitions for vessels and tanks according to Saudi Aramco requirements.
- Evaluate technical bids evaluation and selecting the successful bidder.
- Accomplish vendor prints review for tanks according to Saudi Aramco specifications and standard drawings.
South Area Safety Related Facilities (SASRF) Project, KJO, Al Khafji, KSA:
- Working as Static Equipment Lead Engineer for the project whose scope included FEED verification, basic and detailed engineering for two new fire water tanks and replacing the existing firefighting systems on existing external floating roof tanks. The project scope includes API 653 inspection and verification and evaluation of the structural integrity of the existing tanks prior to start of any modifications to ensure that there is no adverse impact on existing tanks shell due to installation of new firefighting system supports.
- Prepare and issue the mechanical data sheets for tanks according to Saudi Aramco engineering standards.
- Prepare and issue the material requisitions for tanks according to Saudi Aramco requirements.
- Evaluate technical bids evaluation and selecting the successful bidder.
- Accomplish vendor prints review for tanks according to Saudi Aramco specifications and standard drawings.
New Vapor Recovery Unit Project, ASORC, Assiut, Egypt:
- Working as Static Equipment Team Member responsible for the vendor print review for shell & tube heat exchangers according to Enppi specifications, TEMA standard and API STD 660.
Ammonia/Urea Fertilizer PLANT, KIMA, Aswan, Egypt:
- Working as Static Equipment Team Member responsible for review the licensor's documents for both Ammonia and Urea plants.
New Pre-flash Column System, MIODR, Alexandria, Egypt:
- Working as Static Equipment Team Member responsible for the vendor prints review for shell & tube heat exchangers according to Enppi specifications, TEMA standard and API STD 660.
Zohr Gas Field Development Onshore Project Phase I & Phase II, ENI, Port Said, Egypt:
- Working as Static Equipment Team Member in fast-track project with the scope of the detailed engineering, inspection activities at suppliers’ workshop and technical assistant during the construction for ENI resident team at project site for field gas processing facility.
- Prepare and issue mechanical data sheets and supply specifications for the tanks, vessels and columns according to ENI system.
- Accomplish vendor prints review for vessels and columns according to Eni specifications and standard drawings.
Western Desert Gas Complex Expansion Project, GASCO, Alexandria, Egypt:
- Working as Static Equipment Lead Engineer for the project whose scope included the basic and detailed engineering for gas facilities including De-Methanizer and De-Ethanizer columns, shell & tube heat exchangers, air cooled heat exchangers, storage tanks, pressure vessels, refrigeration package, molecular sieve dehydration package, methanol injection package.
- Prepare and issue the mechanical data sheets for vessels, columns and tanks.
- Participate in preparation of data sheets and material requisitions for shell & tube and air-cooled heat exchangers.
- Participate in preparation of application sheets and material requisitions for packages
- Prepare and issue the material requisitions for vessels, columns and tanks.
- Evaluate technical bids evaluation and selecting the successful bidder.
- Accomplish vendor prints review for vessels, columns, tanks and heat exchangers.
MIDOR Refinery Expansion Project, MIDOR, Alexandria, Egypt:
- Working as Static Equipment Team Member responsible for the detailed engineering of shell and tube heat exchangers (both fixed and floating tube sheet type) and double pipe heat exchangers according to TECHNIP specifications and standards.
- Prepare and issue the mechanical data sheets for shell & tube heat exchangers and double pipe heat exchangers utilizing TECHNIP template and forms.
- Participate in preparing the Particular Technical Specifications for shell & tube heat exchangers and double pipe heat exchangers utilizing using SPMAT.
- Evaluate technical bids evaluation for the received offers selecting the successful bidder.
- Accomplish vendor prints review for shell & tube heat exchangers and double pipe heat exchangers according to TECHNIP specifications and standard drawings.
- Accomplish vendor prints review for shell & tube heat exchangers and double pipe heat exchangers according to TECHNIP specifications and standard drawings.