Supporting North Africa in technical and commercial point of view upon request
Training the customers for recommending the best applicable treatment for enhancing the well production
Complete Well On Paper with customer, gathering well data, presentation skills
Technical support engineer – for tenders (technical part, commercial part and executing PAW)
Professional at designing and executing OHGP vertical or horizontal wells either using Newtonian or non-Newtonian fluids using AB-PAC, power pack & Mrs
Hang’s original spreadsheet
Professional at designing and executing all Cased-Hole pumping treatments applications i.e
CHGP, HRWP, H2O FRAQ, Frac Pack & Hydraulic Frac for either horizontal or vertical wells
Professional at analyzing Step-Up Rate Test and Step-down Rate Test data prior HRWP, FP & HF pumping treatment applications
Professional at analyzing Mini-Frac and Main Frac data (StimPlan with fully 3D license in hand and Meyer frac software user)
Stimplan Frac modeling user since late 2006
Professional at designing and executing acid stimulation and remedial treatment applications based on the well data
Training skills for junior/green applications engineers
Professional at sieving side wall core samples to better select the best sand control solution (screens type/size and gravel size)
General Lab skills
Service Delivery Coordinator for EGY_PE
Baker Hughes
07.2021 - 08.2024
Company Overview: BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
Service Delivery Manager for EGY_PP
Baker Hughes
01.2020 - 06.2021
Company Overview: BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
On-Site Services Manager
Baker Hughes
09.2006 - 01.2020
Company Overview: BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
Designing and executing more than 105 jobs i.e
OHGP, CHGP, H2O FRAQTM, Frac pack & acid stimulation for Egypt since 2007 under Baker Hughes
Designing and executing the Egypt’s First Deep Water in the Mediterranean (Mina Well – Burullus), Horizontal Open Hole Gravel Pack Job using BHI CS-APTM Gravel Pack System, EXCLUDER Screens and BetaBreakerTM Diverter Valves at January 2014 - I got awarded from BHI
Designing and executing the first frac pack treatment in the glob using Zink/Calcium gelled brine– well production exceeds customer satisfaction – (West Akhen#1 - ENI/PhPc) – in the Mediterranean Sea at Nov 2014
Designing and executing the first Cased Hole Gravel Pack treatment inside a pre-installed screen since 1995 in the red sea, A4 & A8 Well – Gempetco at August 2015
Designing and executing the first Open Hole Gravel Pack treatment in the glob using the torrent system (ExcellPak and LP140) in the Mediterranean Sea, Taurt-8 well – for ENI/PhPc at July 2016
Presenting a paper at Egypt Petroleum Show (EGYPS sponsored by the president of Egypt – Abdelfatah Elsisi) at February 2017 about 'Egypt’s Successful Frac Pack Case History in Baltim North Field Using Diamond FRAQTM Fluid System, CS-300 Gravel Pack Tools & EXCLUDER Screen Technology'
BHGE-Pressure Pumping / Fracturing, Sand Control & Acid Stimulation
Frac/Acid Service Supervisor/GP Service Supervisor
Halliburton Overseas Limited Company (H.O.L)
06.2001 - 09.2006
Pumping operator for 2 years (HT-400, Automatic Remote Control pump 2000 HP, Automatic Control Equipment pump 2000 HP, panther pump 750 HP)
Blender operator for 1 year (100 bbl ACE, 100 bbl ARC, 75 bbl ARC)
Running the batch mixer
Executing all kinds of acid jobs
Executing sand plug jobs operationally and calculation
On and off shore jobs (Acid, frac, gravel pack, pumping jobs)
Coordinating the gravel pack jobs (frac pack, extension pack, High rate water pack)
Work in Mauritania as a pumping operator in 2004 for 1 year in an off shore job in the Atlantic Ocean
Work in Libya as a Frac Master (running a frac job) for 1 month in feb-2006
Running frac and gravel pack jobs from the Pumping Service Work Station (PSW) by PCI software (Pumping Control Interface) and giving the call for running the frac job as a coordinator/frac-master
Running also the frac job by another software (Insite for Stimulation), new software used by Halliburton world wide
Supervisor For a frac crew (deal with company man, executing the job program, dispatching the Frac equipment needed for the job, running the frac job by either 2 software mentioned above)
Maintenance Shift Engineer
San Masr Company
02.2001 - 06.2001
Maintenance Engineer
Komatsu Company
06.2000 - 03.2001
Education
Bachelor in engineering science - Mechanical power
Ain Shams University
Cairo, Egypt
06.1999
Affiliations
SPE
Wadi Degla Club
Accomplishments
Designing and executing more than 105 jobs i.e. OHGP, CHGP, H2O FRAQTM, Frac pack & acid stimulation for Egypt since 2007 under Baker Hughes.
Designing and executing the Egypt’s First Deep Water in the Mediterranean (Mina Well – Burullus), Horizontal Open Hole Gravel Pack Job using BHI CS-APTM Gravel Pack System, EXCLUDER Screens and BetaBreakerTM Diverter Valves at January 2014 - I got awarded from BHI.
Designing and executing the first frac pack treatment in the globe using Zink/Calcium gelled brine– well production exceeds customer satisfaction – (West Akhen#1 - ENI/PhPc) – in the Mediterranean Sea at Nov 2014.
Designing and executing the first Cased Hole Gravel Pack treatment inside a pre-installed screen since 1995 in the red sea, A4 & A8 Well – Gempetco at August 2015.
Designing and executing the first Open Hole Gravel Pack treatment in the globe using the torrent system (ExcellPak and LP140) in the Mediterranean Sea, Taurt-8 well – for ENI/PhPc at July 2016.
Presenting a paper at Egypt Petroleum Show (EGYPS sponsored by the president of Egypt – Abdelfatah Elsisi) at February 2017 about 'Egypt’s Successful Frac Pack Case History in Baltim North Field Using Diamond FRAQTM Fluid System, CS-300 Gravel Pack Tools & EXCLUDER Screen Technology'
Militarystatus
Exempted
Hobbies and Interests
Reading
Running
GYM
Training
Frac Pack Design and Execution training Course, Perry Baycroft, Two weeks, Houston, TX, 02/05/07
Technical Service Laboratory training, Two months, BOT Houston, TX and Lafayette, Louisiana
Intermediate fluid pumping course, One week, BOT Lafayette, LA, 96%
Field Training at Gulf of Mexico, One month, HR Hughes Vessel
Sand Control Academy II, Houston, 11/08/10
Borehole Geoscience GeoMechanics, Dubai, 09/08/13
NSI Hyd Frac School, Kuwait, 03/11/18, Michael Berry Smith
Languages
Native, Fluent, Fluent
Email
Octo221976@yahoo.com, personal
Waleede.moustafa@Bakerhughes.com, work
Personal Information
Place of Birth: Cairo
Number of Children: 2 boys & 2 girls
Date of Birth: 10/22/76
Nationality: Egyptian
Marital Status: Married
Religion: Moslem
Timeline
Technical Support Engineer EGY_PP
Baker Hughes
09.2024 - Current
Service Delivery Coordinator for EGY_PE
Baker Hughes
07.2021 - 08.2024
Service Delivery Manager for EGY_PP
Baker Hughes
01.2020 - 06.2021
On-Site Services Manager
Baker Hughes
09.2006 - 01.2020
Frac/Acid Service Supervisor/GP Service Supervisor
Halliburton Overseas Limited Company (H.O.L)
06.2001 - 09.2006
Maintenance Shift Engineer
San Masr Company
02.2001 - 06.2001
Maintenance Engineer
Komatsu Company
06.2000 - 03.2001
Bachelor in engineering science - Mechanical power
Service Delivery Coordinator - Field Manager at Baker Hughes - Baker PetroliteService Delivery Coordinator - Field Manager at Baker Hughes - Baker Petrolite