Summary
Overview
Work History
Education
Skills
Certification
Timeline

Yasser Radwan

MEP Manager
Alexandria

Summary

Along experience more than twenty-four years of knowledge and qualification in the MEP field, I spent this period of experience moving over several titles, 1- Site Mechanical engineer 2- Quality control Engineer 3- Quality control Manager 4- Mechanical section head 5- MEP construction Manager 6- MEP project Manager 7- Director Operations This long period added many qualifications and experiences in “Technical & Managerial” throughout many types of Projects either Residential, Military or Industrial. Also, throughout multiple solid firms either national or international.

Overview

25
25
years of professional experience
1
1
Certifications
2
2
Languages

Work History

MEP Project Manager

ASGC
Cairo
06.2021 - Current
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Used computer software to design construction plans and perform calculations.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Scheduled utility service providers according to project timelines.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.

MEP Director

SOLID
Cairo
01.2021 - 06.2021
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Preparing department organization Chart.
  • Evaluate department employers.
  • Assigning “relocating” or hiring required and missing positions for all projects.
  • Meet and evaluate subcontractors.
  • Assisting procurement department in arranging subcontractors around projects.
  • Directing and follow up sites crew in preparing execution and procurement plan based on Material submission log, and project schedule.
  • Follow up execution and procurement plan execution with site crew and procurement department as well.
  • Directing and follow up MEP projects managers to prepare project MEP organization chart, along with expected indirect cost till end of their projects.
  • Follow up with the technical department the required drawings and technical support for each site.
  • Discussing with top management MEP department required target.
  • Arrange and discuss with MEP projects managers required target and methodology of achieve or exceed required target.
  • Meet with the new subcontractors and vendors to evaluate them and selecting the suitable of them to cooperate with the company.
  • Review subcontractors and vendor contract and edit it if needed.
  • Review and discuss tender department through the different stage of the project, "Tender stage, after awarded, While the project running" to improve and enhance the way of project study.
  • Preparing a monthly report about the department progress to the top management.
  • Receive and review a bi-monthly report from the MEP projects managers, and discusses their achievement based on it.

MEP Operational Director

BEMCO Egypt
Cairo
01.2020 - 12.2020
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Preparing the department organization Chart.
  • Evaluate the department employers.
  • Assigning “relocating” or hiring the required and missing positions for all the projects.
  • Meet and evaluate the subcontractors.
  • Assisting the procurement department in arranging the subcontractors around the projects.
  • Directing and follow up the sites crew in preparing the execution and procurement plan based on the Material submission log, and project schedule.
  • Follow up the execution and procurement plan execution with site crew and the procurement department as well.
  • Directing and follow up the MEP projects managers to prepare the project MEP organization chart, along with the expected indirect cost till the end of their projects.
  • Follow up with the technical department the required drawings and technical support for each site.
  • Discussing with the top management the MEP department required target.
  • Arrange and discuss with the MEP projects managers the required target and the methodology of achieve or exceed the required target.
  • Meet with the new subcontractors and vendors to evaluate them and selecting the suitable of them to cooperate with the company.
  • Review the subcontractors and vendor contract and edit it if needed.
  • Review and discuss the tender department through the different stage of the project, "Tender stage, After awarded, While the project running" to improve and enhance the way of project study.
  • Preparing a monthly report about the department progress to the top management.
  • Receive and review a bi-monthly report from the MEP projects managers, and discusses their achievement based on it.
  • Following equipment’s startup with the contractor QC and the equipment’s representative
  • Review O&M manuals, Training schedule and commission for each equipment.

Mechanical Resident Engineer

Middle East for Tourism and Development Co.
Alameen
05.2015 - 01.2020


  • Create design calculation, drawings, and specification.
  • Review and assure the availability for the product described.
  • Coordination with the other trade design, Firefighting, architectural...Etc.
  • Arranging the available places for the designed equipment.
  • Assure the quality of the site work with the Contractor Mechanical quality control.
  • Assure the contractor doing what described in the drawings and the specification.
  • Review the contractor submittal “Material or Drawings, .etc.” and approve or disapprove it.
  • Witness the site work test, leakage, pressure test or even welding quality.
  • Following equipment’s startup with the contractor QC and the equipment’s representative.
  • Review O&M manuals, Training schedule and commission for each equipment.

MEP Construction Manager

Hassan Allam Sons Co.
Hurghada
02.2015 - 05.2015
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.

MEP Construction Manager

American international contractors, Inc.
Manama
11.2012 - 12.2014
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Lead the MEP technical and site teams.
  • Review and evaluate the Subcontractors offers.
  • Create the required technical and site team crew.
  • Attending the meetings with the client.
  • Attend the meetings with subcontractors and suppliers.
  • Follow up the correction action required per the QC and the client as well.
  • Preparing the required purchase order in the proper time to have the material in site at the proper time.
  • Review daily reports of the construction MEP team.
  • Evaluate and pricing the required change order.
  • Review and edit the tendering documents.
  • Negotiate with the subcontractors for the best price.
  • Review and implement the project time schedule.
  • Follow up the QS department to get the required bill of quantity.
  • Finalizing the contracts with the subcontractors and with the main contractor.
  • Follow up the technical office to assure finalizing the shop drawings in time.
  • Follow up the RFI action and checking for the change order required.
  • Attend every meeting in and off site.
  • Coordinate between the different subcontractors to get the job accomplished.
  • Preparing and doing the site mobilization and demobilization as well.
  • Follow up the deficiency list, working list and punch list fixation.
  • Follow up the QC department with the QC manager.
  • Implementing the safety regulation required by the site standard.
  • Leading a weekly site meeting to follow up the work process and planning for the next project schedule.
  • Solving and coordinate any conflict appear through the work execution.
  • Assuring the material arrival to site as per specification requirements.
  • Follow up and organizing the equipment start up with their relevant agent.
  • Follow up the steel structural shop drawings and order the shortage of the materials.
  • Follow up the steel structural erection in site and taking care of the missing and required tools.
  • Maintain the mobilization area water, drainage and A/C working in order.

Mechanical Quality Control Manager

Contrack International Inc.
Herat
07.2012 - 10.2012


  • Review the specification, contract, and the shop drawing of the Project.
  • Preparing the agenda for the preparatory meetings and registering the meeting notes.
  • Preparing and reviewing the site, safety, and the work progress.
  • Attending the QA/QC meetings.
  • Review all shop drawings "HVAC, PLUMBING& Processing" before starting the actual work.
  • Review material submittal before submitting it to consultant office.
  • Coordinate and solving any conflict or problem especially if there is any variation or deviation of the specification or the previous approved submittals.
  • Identify and solve the problems between the different activities.
  • Preparing the startup reports for the equipment’s.
  • Follow up TAB company for HVAC activity to get the best solution for air balance and distribution problems.
  • Follow up with the subcontractors to get the required and best quality within the required time frame.
  • Negotiation with the consulting engineer to get the best solution for any site problem in site to save time.
  • Implementing test steps in site to assure the done work is complies with the standards and the specification then preparing the test reports.
  • Follow up the material in site and its arrival schedule to assure its compatibility with the specification and approved submittals.
  • Preparing and register the daily reports for any defect or good works through the day.
  • Follow up with equipment’s representative to get the perfect date to start up.
  • Preparing the required startup reports for the equipment.

MEP Project Manager

Argonaut International.
Manama
04.2011 - 04.2012
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Lead the MEP technical and site teams.
  • Review and evaluate the Subcontractors offers.
  • Create the required technical and site team crew.
  • Attending the meetings with the client.
  • Attend the meetings with subcontractors and suppliers.
  • Follow up the correction action required per the QC and the client as well.
  • Preparing the required purchase order in the proper time to have the material in site at the proper time.
  • Review daily reports of the construction MEP team.
  • Evaluate and pricing the required change order.
  • Review and edit the tendering documents.
  • Negotiate with the subcontractors for the best price.
  • Review and implement the project time schedule.
  • Follow up the QS department to get the required bill of quantity.
  • Finalizing the contracts with the subcontractors and with the main contractor.
  • Follow up the technical office to assure finalizing the shop drawings in time.
  • Follow up the RFI action and checking for the change order required.
  • Attend every meeting in and off site.
  • Coordinate between the different subcontractors to get the job accomplished.
  • Preparing and doing the site mobilization and demobilization as well.
  • Follow up the deficiency list, working list and punch list fixation.
  • Follow up the QC department with the QC manager.
  • Implementing the safety regulation required by the site standard.
  • Leading a weekly site meeting to follow up the work process and planning for the next project schedule.
  • Solving and coordinate any conflict appear through the work execution.
  • Assuring the material arrival to site as per specification requirements.
  • Follow up and organizing the equipment start up with their relevant agent.
  • Follow up the steel structural shop drawings and order the shortage of the materials.
  • Follow up the steel structural erection in site and taking care of the missing and required tools.
  • Maintain the mobilization area water, drainage and A/C working in order.

Mechanical Construction Manager

Orascom Construction Industry “Power Generation”
Ain Sokhna, Suez
10.2009 - 02.2011


  • Review and evaluate the Subcontractors offers.
  • Lead the MEP technical and site teams.
  • Create the required technical and site team crew.
  • Attending the meetings with the client.
  • Attend the meetings with subcontractors and suppliers.
  • Follow up the correction action required per the QC and the client as well.
  • Preparing the required purchase order in the proper time to have the material in site at the proper time.
  • Review daily reports of the construction MEP team.
  • Evaluate and pricing the required change order.
  • Review and edit the tendering documents.
  • Negotiate with the subcontractors for the best price.
  • Review and implement the project time schedule.
  • Follow up the QS department to get the required bill of quantity.
  • Finalizing the contracts with the subcontractors and with the main contractor.
  • Follow up the technical office to assure finalizing the shop drawings in time.
  • Follow up the RFI action and checking for the change order required.
  • Attend every meeting in and off site.
  • Coordinate between the different subcontractors to get the job accomplished.
  • Preparing and doing the site mobilization and demobilization as well.
  • Follow up the deficiency list, working list and punch list fixation.
  • Follow up the QC department with the QC manager.
  • Implementing the safety regulation required by the site standard.
  • Leading a weekly site meeting to follow up the work process and planning for the next project schedule.
  • Solving and coordinate any conflict appear through the work execution.
  • Assuring the material arrival to site as per specification requirements.
  • Follow up and organizing the equipment start up with their relevant agent.
  • Follow up the steel structural shop drawings and order the shortage of the materials.
  • Follow up the steel structural erection in site and taking care of the missing and required tools.
  • Maintain the mobilization area water, drainage and A/C working in order.

Chief Mechanical Engineer

OrascomContrack International Inc. Construction
Marrasi, Sidi Abd Elrahman
07.2008 - 08.2009
  • Skilled at working independently and collaboratively in a team environment.
  • Worked well in a team setting, providing support and guidance.
  • Paid attention to detail while completing assignments.
  • Resolved problems, improved operations and provided exceptional service.
  • Self-motivated, with a strong sense of personal responsibility.
  • Provided professional services and support in a dynamic work environment.
  • Applied effective time management techniques to meet tight deadlines.
  • Cultivated interpersonal skills by building positive relationships with others.
  • Worked effectively in fast-paced environments.
  • Passionate about learning and committed to continual improvement.
  • Proven ability to develop and implement creative solutions to complex problems.

Sr. QA Mechanical Engineer

Booz Allen Hamilton
Alexandria
10.2006 - 06.2008
  • Worked well in a team setting, providing support and guidance.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Provided professional services and support in a dynamic work environment.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Create design calculation, drawings, and specification.
  • Review and assure the availability for the product described.
  • Coordination with the other trade design, Firefighting, architectural...Etc.
  • Arranging the available places for the designed equipment.
  • Assure the quality of the site work with the Contractor Mechanical quality control.
  • Assure the contractor doing what described in the drawings and the specification.
  • Review the contractor submittal “Material or Drawings, .etc.” and approve or disapprove it.
  • Witness the site work test, leakage, pressure test or even welding quality.
  • Following equipment’s startup with the contractor QC and the equipment’s representative.
  • Review O&M manuals, Training schedule and commission for each equipment.

Quality Control Manager

Contrack International Inc.
Kabul
07.2004 - 09.2006


  • Review the specification, contract, and the shop drawing of the Project.
  • Preparing the agenda for the preparatory meetings and registering the meeting notes.
  • Preparing and reviewing the site, safety, and the work progress.
  • Attending for the QA/QC meetings.
  • Review all shop drawings "HVAC, PLUMBING& Processing" before starting the actual work.
  • Review material submittal before submitting it to consultant office.
  • Coordinate and solving any conflict or problem especially if there is any variation or deviation of the specification or the previous approved submittals.
  • Identify and solve the problems between the different activities.
  • Preparing the startup reports for the equipment’s.
  • Follow up TAB company for HVAC activity to get the best solution for air balance and distribution problems.
  • Follow up with the subcontractors to get the required and best quality within the required time frame.
  • Negotiation with the consulting engineer to get the best solution for any site problem in site to save time.
  • Implementing test steps in site to assure the done work is complies with the standards and the specification then preparing the test reports.
  • Follow up the material in site and its arrival schedule to assure its compatibility with the specification and approved submittals.
  • Preparing and register the daily reports for any defect or good works through the day.
  • Follow up with equipment’s representative to get the perfect date to start up.
  • Preparing the required startup reports for the equipment

Quality Control Manager, Site Engineer

Contrack International, HVAC
Alexandria
08.2000 - 09.2006
  • Base - Lashkar Gah Base - Pol-E-Charkhi Task# 4&13 - KMTC Military Training
  • Center - Fayed Air Base - Janaklis Air Base - Qalat, Afghanistan - Laskkar, Afghanistan -Pol-e-charkh,
  • Afghanistan -Pol-e-charkh,
  • Afghanistan - Ismailia, Egypt - Bahira, Flash for Trading &
  • Contracting - Zahran City Mall - Doctor Training Center - Psychical & mental
  • Hospital
  • Administration and
  • Commercial Building - Saudi Bank - Islamic Bank - Super Market Saudi - Villa Rasheed

Mechanical Quality Control Engineer

Contrack International Inc.
Fayed & Ganaklis
08.2000 - 06.2004
  • Exercised leadership capabilities by successfully motivating and inspiring others.
  • Worked effectively in fast-paced environments.
  • Demonstrated leadership skills in managing projects from concept to completion.
  • Adaptable and proficient in learning new concepts quickly and efficiently.

HVAC Site Engineer

Flash for Trading & Contracting
Cairo
11.1998 - 08.2000

Education

B.Sc. Engineering -

’ Graduation Project Solar Energy: “Heating an administration building by using solar collector” Grade of Project: Excellent

Skills

Subcontractor management

undefined

Certification

- MILITARY STATUS: FinalExemption.

Timeline

MEP Project Manager - ASGC
06.2021 - Current
MEP Director - SOLID
01.2021 - 06.2021
MEP Operational Director - BEMCO Egypt
01.2020 - 12.2020
Mechanical Resident Engineer - Middle East for Tourism and Development Co.
05.2015 - 01.2020
MEP Construction Manager - Hassan Allam Sons Co.
02.2015 - 05.2015
MEP Construction Manager - American international contractors, Inc.
11.2012 - 12.2014
Mechanical Quality Control Manager - Contrack International Inc.
07.2012 - 10.2012
MEP Project Manager - Argonaut International.
04.2011 - 04.2012
Mechanical Construction Manager - Orascom Construction Industry “Power Generation”
10.2009 - 02.2011
Chief Mechanical Engineer - OrascomContrack International Inc. Construction
07.2008 - 08.2009
Sr. QA Mechanical Engineer - Booz Allen Hamilton
10.2006 - 06.2008
Quality Control Manager - Contrack International Inc.
07.2004 - 09.2006
Mechanical Quality Control Engineer - Contrack International Inc.
08.2000 - 06.2004
Quality Control Manager, Site Engineer - Contrack International, HVAC
08.2000 - 09.2006
HVAC Site Engineer - Flash for Trading & Contracting
11.1998 - 08.2000
- B.Sc. Engineering,
Yasser RadwanMEP Manager