Defining the company's technical vision, roadmap, plans, and standards
Leading and managing the design managers to ensure optimal performance and delivery
Making authoritative decisions and recommendations on technical matters
Monitor project progress against milestones and identify potential risks or delays
Ensuring adherence to design procedures and maintaining high quality standards
Developing the permitting strategy and overseeing compliance throughout the project lifecycle
Manage design processes and deliverables across all RIBA design stages
Leading design reviews from inception to completion, ensuring technical feasibility and alignment with project goals
Prepare scope of work and requests for proposals, shaping project requirements
Review and reply all the designers and contractors RFIs
Evaluating tenders and proposals to select the most suitable options based on technical and financial merit
Coordinating with consultants and contractors to leverage their expertise and support the project
Building and maintaining relationships with key stakeholders, including architects, designers, and external organizations
Developed and managed project budgets through collaboration with cost consultants, providing accurate technical cost estimates and implementing cost control measures
Proactively identified and mitigated potential cost overruns
Works closely with the design team to integrate Value Engineering findings into the design process
Identifies potential technical risks and develop mitigation strategies.
Supervision Consultant
Saudi Entertainment Venture
Responsible for all technical and engineering aspects for a portfolio of high-value residential, commercial, and mixed-use construction projects for top global contractors
Provided technical support to technical managers and staff for numerous projects
Managed design projects, including value engineering, schedule and cost control, team management, client management, and risk management
Performed design reviews throughout the design process, from conceptual design through schematic and detailed/contract documents
Organized and directed staff and activities for the technical office department, including the maintenance of structures
Managed and supervised the technical office team in performing delegated tasks
Ensured adherence to technical office policies and procedures through the continuous review of project contracts, terms and conditions, time schedules, and design drawings
Coordinated with the Site Manager and Project Control Manager to establish effective work procedures, work priorities, and suitable resource allocation
Managed the preparation of RFPs and RFQs for consultants, specialists, and subcontractors, and ensured full coordination with awarded parties from kick-off meetings to final handover documents
Conduct technical evaluations for consultants, specialists, and subcontractors, reviewing their technical proposals and providing recommendations for awarding scopes of work
Coordinate all technical matters between engineering, construction, procurement, and subcontractors to resolve any potential problems
Managed the BIM development process until LOD 500 and handover to the facility management of the project
Managed the shop drawing team to produce project shop drawings accurately and on time, obtaining consultant approval
Supported the Planning and Cost Control Department in monitoring monthly construction progress
Performed periodic performance appraisals for line reports and other staff in coordination with the HR department
Area of Experience : Towers, Commercial Building, Museums, Residential buildings, and Hotels
Operator, Project Manager
Hilton Worldwide
Dar SSH, Supervision Consultant: ERGA Qatar, Local Architect: MZP
Responsibilities:
Oversaw all technical aspects of high-value construction projects, including design management, engineering, and BIM coordination
Managed project execution, including scheduling, budgeting, resource allocation, and quality control
Led and developed the technical team, ensuring adherence to standards and procedures, while fostering a collaborative work environment
Develops and executes comprehensive project plans, budgets, and schedules
Leads and mentor high performing technical teams
Builds and maintain strong relationships with clients and stakeholders
Ensures project quality, safety, and compliance
Manages project risks and implements mitigation strategies
Utilizes advanced technologies, such as Building Information Modelling (BIM), to enhance project efficiency and collaboration
Provides technical expertise and support to the project team
Conducts regular project reviews and performance evaluations
Ensures effective communication and information sharing among all project stakeholders
Prepares the scope of work for each construction package and develops subcontract packages based on the overall scope
Coordinates with subcontractors to ensure compliance with the scope of work.
Project Manager, Supervision, Interior Designer
Turner International
Consultant: GEIC Consultancy
Executive Architect: Burns MacDonald, : David Collins Studio, UK
Sitewide Infrastructure Consultant: ARUP
Main Contractor: Carillion UK
Fit out Contractors: Fino International, Services & Trade Company (S&T)
Responsibilities:
Reviewed construction Schedules, reported on progress, and mitigated potential claims and delays
Oversaw construction contractors’ installation and construction methods, ensuring compliance with contract documents
Supervised the development of architectural details and specifications based on client/operator requirements
Supervised the project team for reviewing contractor shop drawings, material submissions, method statements, site inspections, and material inspections
Checked contractor's daily correspondence on all contractual issues, providing pertinent replies
Reviewed E1 and E2 logs and monitored weekly updates to match the project program
Issued instructions to the contractor to ensure the proper execution and control of works
Conducted on-site observations and compliance checks on previously reviewed design work
Area of Experience : Tram and Office Buildings
Finishing Packages Manager
Besix – Six
Main Consultant
Qatar Petroleum
KEO
Main Contractor: Bouygues Batiment International
JV Contractors: Midmac Contracting and El Jaber Engineering
Responsibilities:
Developing architectural designs, management, and coordination of assigned scope for all project stages
Coordination between architectural, landscape, structural & MEP design drawings and site works
Coordination between the production and the technical departments
Preparation of submittals, RFIs, logs, schedules, and reports
Supervise a group of AutoCAD draftsman and architects for the preparation and submission of shop drawings, and other drawing details for site implementation
Coordinate subcontractor's submissions for materials and drawings and prepare working details for site where required
Responsible for contractor and sub-contractor's conformance with the project’s requirements in terms of time, cost, and quality in accordance with the contract documents and other relevant governmental requirements
Execute timely implementation schedules and efficient follow through on deliverables and address issues as appropriate
Participates in progress, technical and coordination meeting as required
Conducting on-site observations and compliance checks on previously reviewed design work and QA/QC procedures
Area, : Hotels and Service Apartment Buildings
Project Manager, Consultant
Hill International
KEO
Discovery Gardens, another notable project, comprises 12 residential buildings and commercial spaces across three plots, with a total budget of AED 418 million.
Project Manager
Turner International
Main Consultant: ECG
In the Emirates Hills, the Greens development features Una Site 19, a residential building with commercial amenities, valued at AED 35 million.
Consultant
Holford Associates
Coordinate Design, working drawings and workshop details
Coordination between Architectural, Structural & MEP Works
Preparation of Submittals, RFIs, Logs, Schedules, and Reports
Preparation of workshop details and drawings
Revising all subcontractors’ shop drawings and coordinating with different trades
Revising specifications and tender documents
Attending meetings with Project Manager, Consultants, Subcontractors & the Suppliers and preparing the minutes of meetings
Area, : Towers, Commercial Buildings and Hotels
Main Consultant
Saudi Bin Ladin, Dar Al Handasah, Shair and Partners
Interior Design Consultant
Richmond International - Hotel &Leisure Design Consultants
Technical and Design Director
JASARA
10.2023
Technical and Design Director
Hotels and Resorts, JASARA Program Management Company
10.2023 - 11.2024
The Sharaan resort no
3 project entails the development of a comprehensive hospitality and recreational complex, encompassing a 123-key hotel with various room types, a spa and wellness centre, outdoor activities centre, youth and discovery centre, desert café, swimming pool, banquet facilities, business centre, 25 private villas, clubhouse, and supporting infrastructure such as site utilities, services infrastructure, recreational venues, public areas, and roads
Project Budget SAR 2.2 billion.
Technical and Engineering Director
Urbacon Holding, UCC
12.2022 - 10.2023
This project involves building three entertainment complexes in Tabuk, Madinah, and Yanbu
Each complex will offer a variety of entertainment options, including cinemas, restaurants, shops, and recreational facilities
The total budget for all three projects is SAR 2.2 billion.
Technical and Engineering Director
UCC Saudi
12.2022 - 09.2023
Senior Technical and Engineering Manager / Director
Urbacon Holding, UCC
09.2015 - 12.2022
Seef Lusail Residential high-rise towers, a mixed-use development worth QAR 1.3 billion
The Qatar Olympic Museum, a cultural landmark valued at QAR 480 million, showcases the nation's dedication to sports
Client: Qatar Museum Authority (QMA)
Supervision Consultant, Projacs
The residential towers of Viva Bahriya VB-08 – QAR 263 million
Client: Assets, Supervision Consultant: Lacasa
The Laguna Residence – QAR 742 million, along with the mixed-use Lusail Marina Mix 5 – QAR 320 million, represented significant investments in the real estate market
Client: Assets, Supervision Consultant: Lacasa
The Panorama Residence and Suites at the Pearl, a luxury development operated by Hilton in the hospitality sector, with a budget of QAR 718 million.
Senior Technical and Engineering Manager
UCC Holding
09.2015 - 12.2022
Assistant Resident Engineer
Hotels and Residential Buildings, GIEC Consultancy
02.2014 - 09.2015
Musheireb Downtown Development Phase 1B is a mixed-use project featuring the prestigious Mandarin Oriental Hotel as its centrepiece
This phase forms the heart of the entire Musheireb development, offering a blend of luxury hospitality, residential living, dining, retail, and cultural spaces
The Mandarin Oriental Hotel itself boasts 160 luxurious guestrooms and suites, complemented by 95 serviced apartments, along with world-class amenities
The total project budget is QAR 2.37 billion
Assistant Resident Engineer
GEIC Consultancy
02.2014 - 09.2015
Main Contractor
Faisal
02.2013 - 02.2014
Dubai Tram Project at Dubai Marina area is a design and built project
Dubai Tram is a 10.6 km system with 11 stations, depot building and RTA offices featuring advanced technology
It connects Dubai Marina to Al Sufouh, serving key areas like Jumeirah Lakes Towers, Dubai Media City, and Knowledge Village - Budget USD 1.2 billion
Client, : Aedas, Atkins, Parsons
Supervision Consultant: Systra
Main Contractor: Alstom - Besix Consortium
Responsibilities:
Reviewed and developed design documents and details produced by design firms
Coordinated design development phase approvals with the supervision consultant and the client
Led technical meetings with design consultants, the supervision consultant, and the client
Participated in the selection of material alternatives
Led a group of architects and engineers in the design and construction phases for the approval of design documents, material submittals, method statements, shop drawings, and all technical documents
Monitored progress and delivery key dates, interfacing with the commercial department for required warning/notice letters when needed
Reviewed shop drawings, material submittals, and method statements in coordination with the Design Department from a contract/specification’s compliance standpoint
Reviewed monthly requests for payment, invoicing, and back charges
Coordinated the production and issuance of relevant documentation required to define package scope and support commercial/procurement in tendering for package subcontractors
Area, Experience : Towers, Commercial, Hotel and Office Buildings, Islamic Bank branches in Ghamra and Domiette
The Nabea el Sagher resort development in, Design and produce professional design, working drawings, projects presentation, bill of quantities and general specifications for several touristy villages and official buildings including several banks.
Finishings Package Manager
Besix
02.2013 - 02.2014
Senior Architect
Bouygues Batiment International, BBI
11.2010 - 12.2012
Qatar Petroleum District (QPD) is a massive commercial development strategically located in Doha's West Bay district
Encompassing a vast 7-hectare plot, the project comprises nine office towers of varying heights, culminating in a 47-story skyscraper
To complement the office space, a 25-story, 405-room five-star hotel, a conference centre, and a shopping mall have been incorporated
The development also includes extensive parking facilities, both above and underground
This colossal project, requiring the construction of 696,000 square meters of space, with a budget of QAR 5.1 billion.
Senior Architect
Bouygues Batiment International
11.2010 - 12.2012
Senior Architect
Dar Al Handasah, Shair and Partners, Emirates
01.2007 - 10.2010
Months)
Achievements, Tiara Palm Jumeirah & Tiara Residence, and Movenpick Hotel & Spa and Oceana Residences are two large-scale, mixed-use developments in Dubai
Each project includes luxury hotels, high-end apartments, extensive amenities, and substantial infrastructure
(Budget AED 4.2 billion)
Client: Zabeel Investments / Seven Tides
Project Management: EC Harris / Asteco Development Management
Main Consultant: Dar El Handasah (Shair & Partners)
Interior Design Consultant: Studio Marco Piva, FB EYE, EH Creations
Main Contractor: Arabtec
Contractors: Dhabi Contracting, GTCC contracting, Multiform, Emirates Water Tech, SEF UAE, Arabian Profile, DEPA Interiors Finishing
Operator: Palm Jumeriah – Nakheel
Responsibilities:
Ensure the contractor staff implementation of Field Quality Control procedures, Safety and Progress aspects
Ensure contractor compliance with its contractual obligations concerning Design changes, Trend Notices etc
Checks Contractor’s correspondences on contractual issues (Variation order evaluation, extension of time, claims, etc.) and provides pertinent replies
Overviews the construction contractors’ installation and construction methods and ensures compliance with the contract documents
Coordination with the Client for additional design requirements
Development of architectural details and specifications
Communicating with governmental agencies or officials for the purpose of approvals and permits and coordination between different disciplines
Reviewing the contractors’ correspondences and submittals and issues replies within the contract stipulations
Reviewing the monthly payment, progress percentage and claims analysis
Supervising a team for site inspections and material inspections
Conducting on-site observations and compliance checks on previously reviewed design work and witness the testing during the construction period
Issues instructions to the contractor to ensure the proper execution and control of works
Preparation of the handing over documents, O&M manuals and taking over certificates
Participates in progress, technical and coordination meeting as required
Factories and showrooms visit for suppliers and subcontractors' technical evaluation and prequalification's approval
Area of Experience : Residential, Commercial Buildings and Luxury Villas
Senior Architect
Dar Al Handasah, Shair and Partners
01.2007 - 10.2010
Senior Architectural Coordinator
Al Shafar Transport and Contracting, ASTCC, Emirates
05.2005 - 01.2007
The Palm Jumeirah boasts 92 luxury villas, completed at a cost of AED 94 million, showcasing high-end finishes.
Senior Architectural Coordinator
Al Shafar Transport and Contracting, ASTCC
05.2005 - 01.2007
Architectural Coordinator
Marasem International for Urban Development, Saudi
01.2004 - 05.2005
Binladin Group (SBG) - Cairo Office, The King Abdul-Aziz Endowment for the Holy Mosques project in Makkah, known as Gabal El Kalaa, is a massive undertaking with a budget of 8 billion Saudi Riyals
This ambitious development encompasses a 16-story podium and seven high-rise towers, offering a mix of commercial, residential, dining, cultural, and office spaces
It creates a thriving urban centre that caters to the needs of both pilgrims and residents, while also serving as a prominent landmark in the holy city
Architectural Coordinator
Marasem International, Saudi Binladin Group
01.2004 - 05.2005
Technical Office Engineer
Square Engineering Firm
06.2001 - 01.2004
Coordinates Design, working drawings, workshop details
Material Submittals, Vertical Transportation Systems, Garbage Chutes Systems and Pods Submittals follow up with the consultants and the subcontractors
Preparation of Submittals, RFIs, Logs, Schedules, and Reports
Revising specifications and tender documents
Coordination between Architectural, Interior Design, Structural & E/M
Attending meetings with consultants, subcontractors & suppliers and preparing the minutes of meetings
Area, : Hotel Residential suites, Clubs, Private Luxury Villas, and Administration Buildings
Technical Office Engineer
Four Seasons
06.2001 - 01.2004
Hotel Suites at Nile Plaza, private villas in Katamia, Rabwa, and Mayfair El Shorouk
The Rehab Club and New Mall, Aresco Engineering Company headquarters, producing Design, working drawings and workshop details
Technical Supervision of sites belongs to the firm mainly in finishing
Interior designs & Presentation for private apartments and villas in many places
Preparation of time schedules and Bill of quantities for the firm projects
Preparation & Revision of the firm invoices & subcontractors’ invoices
Quantities Survey & Cost Analysis for all Architecture & Civil Items
Area of Experience: Governmental Buildings, Factories and Petrol Stations
First Lieutenant Design Engineer
Military Technical College Consulting Office, Egyptian Armed Forces
11.1999 - 06.2001
The Mubarak Public Library in Luxor, Journalist Syndicate downtown, VIP reception building at the Military Technical College, macaroni factory in Qena, and retail outlets through the Watania gas stations in multiple locations including Rafah, Abu Sultan, Sharm El Sheikh, Six October, and Suez
Responsibilities:
Design and produce professional design and working drawings for numerous projects including libraries, factories, refrigeration units, official buildings, and gas stations
Quantities survey & estimation
Supervised construction site work
Produced bill of quantities, general specifications and estimating costs for construction buildings
Technical and financial evaluation of Offers & Tenders.
Design Engineer
Banks and Resorts, Dr. Ali El Sawi Consulting Office
11.1999 - 06.2001
Design Engineer
Military Technical College Consulting Office, Egyptian Armed Forces
11.1999 - 06.2001
Design Engineer
Dr Ali El Sawi Consulting Office
11.1999 - 06.2001
Design Engineer
Hotels and Resorts, Hesham Marei Interior Design Office
07.1998 - 06.1999
Hurghada beach club at Hurghada, and old palace hotel at Sahel Hashish
Responsibilities:
Designed and produced professional interior design drawings, working drawings, workshop Details, bill of quantities and general specifications for several touristy hotels.
Design Engineer
Hesham Marei Interior design Office
07.1998 - 06.1999
Education
Bachelor of Science - Architectural Engineering
Cairo University
Cairo
07-1998
Skills
Teamwork skills
Layout design
Concept development
Computer literate
Timeline
Technical and Design Director
JASARA
10.2023
Technical and Design Director
Hotels and Resorts, JASARA Program Management Company
10.2023 - 11.2024
Technical and Engineering Director
Urbacon Holding, UCC
12.2022 - 10.2023
Technical and Engineering Director
UCC Saudi
12.2022 - 09.2023
Senior Technical and Engineering Manager / Director
Urbacon Holding, UCC
09.2015 - 12.2022
Senior Technical and Engineering Manager
UCC Holding
09.2015 - 12.2022
Assistant Resident Engineer
Hotels and Residential Buildings, GIEC Consultancy
02.2014 - 09.2015
Assistant Resident Engineer
GEIC Consultancy
02.2014 - 09.2015
Main Contractor
Faisal
02.2013 - 02.2014
Finishings Package Manager
Besix
02.2013 - 02.2014
Senior Architect
Bouygues Batiment International, BBI
11.2010 - 12.2012
Senior Architect
Bouygues Batiment International
11.2010 - 12.2012
Senior Architect
Dar Al Handasah, Shair and Partners, Emirates
01.2007 - 10.2010
Senior Architect
Dar Al Handasah, Shair and Partners
01.2007 - 10.2010
Senior Architectural Coordinator
Al Shafar Transport and Contracting, ASTCC, Emirates
05.2005 - 01.2007
Senior Architectural Coordinator
Al Shafar Transport and Contracting, ASTCC
05.2005 - 01.2007
Architectural Coordinator
Marasem International for Urban Development, Saudi
01.2004 - 05.2005
Architectural Coordinator
Marasem International, Saudi Binladin Group
01.2004 - 05.2005
Technical Office Engineer
Square Engineering Firm
06.2001 - 01.2004
Technical Office Engineer
Four Seasons
06.2001 - 01.2004
First Lieutenant Design Engineer
Military Technical College Consulting Office, Egyptian Armed Forces
11.1999 - 06.2001
Design Engineer
Banks and Resorts, Dr. Ali El Sawi Consulting Office
11.1999 - 06.2001
Design Engineer
Military Technical College Consulting Office, Egyptian Armed Forces
11.1999 - 06.2001
Design Engineer
Dr Ali El Sawi Consulting Office
11.1999 - 06.2001
Design Engineer
Hotels and Resorts, Hesham Marei Interior Design Office
07.1998 - 06.1999
Design Engineer
Hesham Marei Interior design Office
07.1998 - 06.1999
Designer
Royal Commission for AlUla
Supervision Consultant
Saudi Entertainment Venture
Operator, Project Manager
Hilton Worldwide
Project Manager, Supervision, Interior Designer
Turner International
Finishing Packages Manager
Besix – Six
Main Consultant
Qatar Petroleum
Project Manager, Consultant
Hill International
Project Manager
Turner International
Consultant
Holford Associates
Main Consultant
Saudi Bin Ladin, Dar Al Handasah, Shair and Partners
Interior Design Consultant
Richmond International - Hotel &Leisure Design Consultants