QC-Mechanical Inspector Engineer with 5+ years of experience in Oil & Gas projects. Specialized in inspection and quality control of crude oil storage tanks, process piping (ASME B31.3), pipelines, welding, and static/rotating equipment. Skilled in reviewing WPS/PQR, test packs, and QA/QC documentation, ensuring compliance with API 650/653, ASME IX, API 1104, and other international standards. Holder of CWI (2025), ASNT Level II NDT, and ASME B31.3 certifications. Experienced in material inspection (MRR), NDT supervision (VT, PT, MT, UT, RT), and project commissioning phases.
· Inspection & Repair of 3 Floating Roof Crude Oil Tanks - 250,000 BBL each
El Hamra Terminal: Contractors: PETROJET, APM, EMC / TPI: BV, DNV
replacement of shell courses, bottom/roof plates, attachments, mechanical sealing, process piping & firefighting system in addition to sandblasting & painting.
· Inspection & Repair of 2 Fixed Roof Oily Water Tanks 2,500 BBL each
El Hamra Terminal: Contractor APM and Full supervision by WEPCO.
Replacement of bottom, shell and roof plates, nozzles, process piping systems, attachment and roof structure in addition to sandblasting & painting.
· Construction of 2 new Floating Roof Crude Oil Tanks 550,000 BBL each
El Hamra Terminal. Contractor: PETROJET | Supervision: WEPCO/ENPPI
· Construction of Firefighting Stations (Onshore & Offshore) El Hamra Terminal: Contractors: PETROJET & Full supervision by WEPCO Including:
two firefighting water tanks and associated pumps and piping network>
· New Pump Station Project Contractors: ENPPI & PETROJET including:
6 centrifugal booster and main pumps, piping network and Tie-in to existing Pipeline.
· El Hamra Terminal Tank Farm Northern Extension -120 Acres including:
4 new tanks - 550,000 BBL each, Oily water tank, process and firefighting networks. Contractors: PETROJET & Full supervision by WEPCO.
· El Hamra Terminal Products Tank Farm Southern Extension - 420 Acres including:
9 fixed roof tanks with internal floating roof, process and firefighting piping systems
and two pipelines 30”- 5 KM each.
Contractors: PETROJET & Full supervision by WEPCO.