Youssef Mohamed Meslam

Youssef Mohamed Meslam

Construction&Operations Management | Railway Systems | Site Installations | Railway Electrification | Quality Management | System Engineering | Technical Engineering |Systems Execution&Delivery | E&M | EPC Project
Cairo

Summary

I am a self-confident, creative, energetic, and highly motivated electrical engineer with a strong focus on achieving results in railway construction projects. I possess exceptional skills and extensive experience in quality control, site work implementation, and project coordination. I worked for both local and multinational companies in the railway sector, including Light Rail Transit (LRT) projects. Currently, I am working on the Cairo Monorail, where I am responsible for ensuring work quality and effective coordination. With a solid technical background and in-depth knowledge of railway implementation, engineering practices, and finishing codes and standards, I consistently deliver high-quality outcomes.

Overview

5
5

Years of professional experience in Railway industry

2
2

Years of professional experience Smart building industry

Work History

Senior Quality Engineer

ALSTOM
01.2025 - Current
  • Project Overview :
    Alstom-led consortium also involving Orascom Construction and Arab Contractors signed a €2.7bn contract to design, construct, operate and maintain the two lines The project includes a 57km line connecting the New Administrative City with East of Nile and a second 42km line connecting West of Nile with Giza After the construction phase is completed, the Alstom-led consortium will provide 30 years of operation and maintenance (O&M) services .
  • After the construction phase is completed, the Alstom-led consortium will provide 30 years of operation and maintenance (O&M) services
  • Do the necessary to guarantee that Quality rules and procedures are in place in the subcontractors' organizations
  • Participate to 4M review for Quality before start of Installation and T&C
  • Ensure of adequate level of quality for FAT, Equipment Installation, T&C
  • Problem solving prevents the occurrence of potential defects
  • Report cost of non-quality (CONQ) and collect it as support for PM
  • Ensure that subcontractors perform tests and inspections according to the QC plan or ITP
  • Conduct on site quality issues investigations and analysis
  • Ensure and follow that all tools are calibrated on time
  • Perform regular audits and follow resolution of actions in place
  • Make sure that all site quality documents are achieved and controlled in the right place, like ITRs, Method statements, test reports, checklists, etc
  • Control all reserves come from customer FAT, inspections or testing and follow up with the team the action plans
  • Participate in closing all open items for snag lists regarding FAT - PICO test - SAT test
  • Support project manager and sub system installation managers to follow the quality of the supplier's activities
  • Create, maintain, and implement site quality control procedures and work instructions, inspection checklist
  • As applicable, assist in reviewing statements, inspection/ test plans (ITP) in close cooperation with relevant department and QM management
  • Collecting and compiling statistical quality data to generate quality reports at predefined frequencies
  • Highlight and report any unauthorized/undocumented site changes and initiate the change request process
  • Coordinate and work closely with all interested parties including but not limited to site/installation team/project consultants to carry out site activities inspection according to approved method statements and ITPs, highlight any deviation, discrepancies and/or nonconforming activities and report it to quality manager and involved department
  • Obtain and verify the quality records and maintain it in a traceable, easily retrievable and safe manners
  • Maintain a proper log for the records
  • Responsible for Hand over the Guideway beams at EON Line from Orascom construction to Alstom
  • Responsible for Interface and coordination between Civil contractors and Alstom Sub systems for the main line / Stations / Depot
  • Handover the Depot Building, Technical rooms, Track switches, manholes and ducts
  • Following the installation activities in sites for all systems related (power rail-power supply)
  • Verify the quality records in a traceable, retrievable, and safe manner and maintain a proper log for the records
  • Developed comprehensive quality assurance plans, ensuring compliance with industry standards and regulations.
  • Provided technical support in resolving complex quality issues by conducting thorough investigations and presenting data-driven recommendations.

Senior OPC Engineer

ALSTOM
03.2023 - 12.2024
  • Project Overview :
    Alstom-led consortium also involving Orascom Construction and Arab Contractors signed a €2.7bn contract to design, construct, operate and maintain the two lines The project includes a 57km line connecting the New Administrative City with East of Nile and a second 42km line connecting West of Nile with Giza After the construction phase is completed, the Alstom-led consortium will provide 30 years of operation and maintenance (O&M) services .
  • Company Overview: Alstom-led consortium also involving Orascom Construction and Arab Contractors signed a €2.7bn contract to design, construct, operate and maintain the two lines
  • The project includes a 57km line connecting the New Administrative City with East of Nile and a second 42km line connecting West of Nile with Giza
  • After the construction phase is completed, the Alstom-led consortium will provide 30 years of operation and maintenance (O&M) services
  • OPC functional scope: Key management principles of construction related activities to project management
  • The main mission of the OPC cell is to manage all construction related activities between different parties, arbitrate conflicts on a day-to-day basis and escalate on time to minimize impact due to any potential issues, quality, and delivery whenever necessary
  • Monitoring all site monorail Subsystems activities (Power supply, AFC &Scada, power Rail, SIG, Telecommunication, Depot equipment, LV, Platform screen doors) starting from reviewing Engineering method of statement, checking material till SAT test and H/O to T/C and T/O
  • OPC leads subsystems to deliver the project on time according to project specifications
  • Act as the point of contact in communicating projects' status to all participants, including reporting site progress and issues to the business unit director, as well as following up on outstanding issues until closure
  • Monitoring the site activities and ensure that the execution complies with specification of the project, approved shop drawing, applicable codes and standards
  • Participate to Quality review (4M) to ensure Manpower, Material, means (Plant & Tools) Method are available on site and validate to start installation
  • Act as the point of contact and communicate project status to all participants
  • Coordination of day-to-day site construction activities due to safety plan (EHS)
  • Management of site interfaces with Civil Works Contractors, System Wide Contractors
  • Participate in Platform Planning and Construction Review (PCR) for the validation of construction strategy using (TOUCHPLAN) Software
  • Visual management: involves using visual tools and displays to track progress, identify issues, and enhance communication for effective project execution
  • Coordinate with suppliers and vendors to ensure material quality
  • Coordinating project schedules, resources, equipment and information
  • Identify Systems requirements for site facilities, Site facilities procurement & installation: If 3rd party (i.e
  • Civil partner), follow-up of installation If Systems follow-up of procurement and installation
  • Define, implement and coordinate handover & hand back process of work areas, including quality control
  • Ensure completion of installation on time to allow the start of T&C activities
  • Validate Installation Release Notices for starting T&C activities
  • Support T&C activities during staged handover
  • Identify work interfaces on site, get commitments from partners and sub-systems
  • If necessary, assist sub-systems for the acceptance of their respective installations by Customer representatives
  • Identify administrative authorizations required for work execution and process to obtain these authorizations (if partner in charge of getting authorization assists him in the process as required)
  • Monitor administrative authorizations delivery and validity period (expiration date)
  • Implement Permit to Work process (tunnel Works Train Management) up to transfer to T&C (temporary site operation team)
  • Define documentation sequencing needs for basic and detailed design documents, drawings
  • Follow-up documentation delivery progress for execution
  • Identify work interfaces on site, get commitments from partners and sub-systems, and communicate agreements
  • Agree and close with CW partner and / or sub-systems any gap within scope of work
  • Liaise with external stakeholders and get agreement on site interface issues (sub-contractors, suppliers, local authorities and neighbors)
  • Attend progress reviews of the construction drawings of each subsystem and CW
  • Highlight any specific needs regarding the documentation required for execution
  • Review of deliverables list, internal and client submission dates of drawings with Project Technical Manager
  • Coordinate with Project Technical Manager updates of detailed delivery planning
  • Escalate potential risks and delay of documentation delivery to Project Technical Manager
  • Implement site quality control procedures, walkthrough, work instructions and an inspection checklist
  • Implement and maintain the Project Quality Management system requirement in accordance with the project quality plan and procedures
  • Verify the quality records in a traceable, retrievable, and safe manner and maintain a proper log for the records
  • Coordinate and work closely with all interested parties including site and installation team, project consultant to carry out site activities inspection according to approved method statements and ITPs
  • Conduct material testing and evaluation
  • Review and approve material submittals and samples
  • Develop material specifications and standards for the project
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.

Senior Quality Engineer

China Railway Group (CR-5)
06.2021 - 03.2023
  • Project Overview:
    Light Rail Train (LRT) project that links the city of Cairo to Egypt's New Administrative Capital and the 10th of Ramadan City with an initial 70 km route consisting of 12 stations.
  • Company Overview: Light Rail Train (LRT) project that links the city of Cairo to Egypt's New Administrative Capital and the 10th of Ramadan City with an initial 70 km route consisting of 12 stations
  • Installation Oversight: Monitored the installation of medium-voltage (20 kV) and low-voltage (400 V) systems, ensuring adherence to approved shop drawings, codes, and standards
  • Support installation of 220/20 kV and 220/27.5 kV transformers, auxiliary transformers, Supervise 20 kV switchgear, Substation Automation System (SAS) Emergency Cut-Off (ECO) systems
  • Power supply 20Kv, power lighting 400 v Systems Management: Led the quality control process, including preparation for inspections, material testing, and method statements
  • Supervised the installation and testing of transformers, switchgear, MDBs, power lighting panels, UPS, PLC, and earthing systems (infraactivities)
  • Compliance and Testing: Ensured compliance with project specifications and oversaw the testing procedures for MV& LV systems
  • Coordination and delivery: Coordinated with stakeholders, submitted Daily Site Reports and managed alignment with the installation schedule to deliver on time
  • Daily site check to follow construction work due to our quality plan
  • Lead construction teams to check and modify unqualified work if needed
  • Monitoring the site activities and ensure that the execution comply with specification of the project, approved shop drawing, applicable codes and standards
  • Ensure that the work carried out on site is in accordance of latest approval drawing and specification
  • Prepare ITP for each item
  • Prepare the site condition for the inspections (installations -Testing)
  • Preparing all requests for site works like the MIR, WIR, SO,TR and TRS
  • Studying shop Drawing extensively to make sure that work implemented on site accordingly
  • Facilitating the related procedures of material acceptance criteria such as factory acceptance tests (FAT) and material third party lab tests
  • Maintaining high standard of quality by following up site observations (SO), site instructions (SI) and non-conformance work report (NCR) comments and work on avoiding it in the future
  • Handing LV items which work finished in and coordinating to start its energization
  • Supervise cables testing (Hi-POT- VLF) and equipment's testing procedures
  • Establish, update, and maintain maintenance manuals and drawings
  • Compile and implement instructions, specifications and standards relating to safety aspects, technical clarification, implementation of new technology, work methods, commissioning, and testing
  • Implemented new strategies to reduce costs and improve efficiency of engineering team.
  • Enhanced customer satisfaction with thorough root cause analysis and timely resolution of complaints.
  • Managed risk assessments to identify potential hazards and implement corrective actions for continuous improvement.
  • Influenced supplier selection criteria by evaluating their capability to meet desired specifications consistently over time.
  • Documented and developed engineering procedures and processes.
  • Conducted regular audits of suppliers and vendors to maintain high-quality supply chain management.

Electrical Site Consultant Engineer

Technical Research and Consultation Center, Zagazig University
01.2021 - 05.2021
  • Project Overview :

This project involves the construction of a state-of-the-art smart building and a modern shopping mall in a rapidly developing area of the New City. The development is designed to meet contemporary architectural and technological standards, providing an innovative and sustainable solution for commercial and residential needs.

  • Follow up all electrical work and installations for the project
  • Follow up Preparation work - such as cutting of holes, provision of fixings and supports
  • Inspect Physical installation of electrical wiring systems onto and within the building
  • Inspect Testing or wiring systems (usually for insulation resistance and to check for any damage)
  • Installation of electrical equipment and its connection
  • Ensure all construction is being performed to quality standards in compliance with design specifications, drawings, budget, and schedule
  • Aware of all designs of LV and earthing concepts
  • Review design stage drawings
  • Review material submittal according to PTS, IEC standards
  • Review shop drawings

Electrical Site and Technical Engineer

ENCO MISR
07.2019 - 03.2020
  • Project Overview :
    This project involves the construction of a state-of-the-art smart building and a modern shopping mall in a rapidly developing area of the New City. The development is designed to meet contemporary architectural and technological standards, providing an innovative and sustainable solution for commercial and residential needs.
  • Monitoring the site activities and ensuring that the execution complies with specification of the project, approved shop drawing, applicable codes and standards
  • Review design stage drawings
  • Coordinate between suppliers and design requirements, standards codes, technical Specifications
  • Review voltage drop calculations, load schedules, load balance of MEP loads
  • Prepare ITP for LV and MV systems items
  • Prepare and review methods of statements for LV and MV systems
  • Coordination between MEP works
  • Prepare reports and letters due to any obstacles to the owner and consultant

Graduation Project Team Leader

Zagazig University
10.2018 - 07.2019
  • Project purpose: Maximization of output power of PV array by making solar beams perpendicular on PV surface
  • Total solar isolation calculation in a clear sky day

Education

BSc - Electrical Power and Machines Engineering

Zagazig University
01.2019

Skills

  • Construction&Operations Management
  • Coordination and Deivery
  • Railway Systems
  • Transportation
  • Mobility
  • LRT/Monorail
  • Systems Execution&Delivery
  • System Engineering
  • Technical Engineering
  • Quality Management
  • Visual Management
  • Smart Buildings construction
  • Process improvement techniques
  • Effective Communication with different cultures
  • Quality inspection techniques
  • Scheduling
  • Interface Engineering
  • Quality Control
  • Cross-functional teamwork

Personal Information

  • Date of Birth: 12/26/95
  • Nationality: Egyptian
  • Marital Status: Single

Certificatesandtrainings

  • Electrical Installations in Buildings, Egyptian Engineers Syndicate, 07/01/19, Good practice in each of these fields: Electrical installation project steps, Electrical load estimation, Electrical (lighting-Socket-Power Loads) systems, Low Voltage Distribution Boards, MV installation.
  • Industrial Automation Diploma, HA Consulting Group, 11/01/19, Good Practice in: Designing Classic control circuits and Simulation using EKTS.
  • Power Supply, National Authority for Tunnels (NAT), 07/01/17, I trained in The Egyptian National Authority for Tunnels(NAT), Where I gained practical experience in Subway maintenance workshops. I got acquainted about the electrical power systems feeding metro.
  • Electronics Course Training, BANHA Electronics Factory, 06/01/16, I trained in BANHA Electronics Factory, where I experienced all stages of designing and manufacturing power electronics applications.

Certification

-TQM

- lean projects

- PMP Certificate of Attendance

-EHS in Railway industry

- on time delivery

- high risk activities

-planning metro rail systems

- Quality improvements and managements

-systems Engineering

Accomplishments

1- I successfully managed and delivered the Cairo Monorail Systems, overseeing various subsystems, including Power Supply, AFC & SCADA, Power Rail, Signaling, Telecom, Depot Equipment, LV, and Platform Screen Doors. My responsibilities covered engineering and method reviews, installation, and handover for testing and commissioning (T&C) as well as temporary operations (T/O).

2- Successfully led a team to deliver the 10th of Ramadan Light Rail Train project, ensuring strict compliance with specifications and codes. Leveraging my expertise in traction power systems and quality management, I achieved project objectives with a focus on excellence and efficiency.


3- Successfully delivered two additional projects related to smart buildings and malls, managing all phases from inception to client handover.


I am committed to elevating industry standards and fostering a culture of safety and excellence in large-scale transportation projects.

Languages

English
Advanced (C1)
Arabic
Bilingual or Proficient (C2)

Quote

The price of anything is the amount of life you exchange for it.
Henry David Thoreau

Timeline

Senior Quality Engineer

ALSTOM
01.2025 - Current

Senior OPC Engineer

ALSTOM
03.2023 - 12.2024

Senior Quality Engineer

China Railway Group (CR-5)
06.2021 - 03.2023

Electrical Site Consultant Engineer

Technical Research and Consultation Center, Zagazig University
01.2021 - 05.2021

Electrical Site and Technical Engineer

ENCO MISR
07.2019 - 03.2020

Graduation Project Team Leader

Zagazig University
10.2018 - 07.2019

BSc - Electrical Power and Machines Engineering

Zagazig University