Reading
Experienced commercial director with 17+ years in construction, including 4 years in current role. Successful in developing and implementing cost-saving purchasing strategies. Skilled in cost estimation, proposal drafting, and leading estimator teams. Expertise in bid management and customer-compliant solutions. Committed to securing winning bids and achieving company goals.
Jop Responsibilities:
Jop Responsibilities:
Jop Responsibilities:
Project: Ain Shams sewage water pump station with a cost of 450 million EGP.
Owner: Construction Authority of Potable Water and Wastewater.
Consultant: Talaat and Emam
Jop Responsibilities
1- Implementation of slip form for the outer walls.
2 - making all reinforcement details and the wooden form for the inner walls.
3- Making all reinforcement details and the wooden form for the slabs at levels (+3.50), (+7.00), (+10.50), (+14.00), (+20.30), (+27.30), and (+30.70).
4-implementation of piles around the main sump, which has a diameter of 0.80 m and a depth of 22.5 m.
Project: Reallocation of Heliopolis Factory for Chemical Industries (Factory 81)
Owner: Ministry of Military Production.
· Consultant : arab consultant engineers ( Moharam – Bakhoum )
Jop Responsibilities:
Project: Alsaf water treatment plant (1,400 l/s) with a cost of 280 million EGP.
Owner: Construction Authority of Potable Water and Wastewater.
Consultant: Misr Consult Enviroment. And Infrastructure. Studies
Jop Responsibilities
Leadership
PMP from project management institute
Reading
Sports
Travel
PMP Certified From Project Management Institute
CLAC In Progress