A planning manager with over 20 years of experience in multi-disciplinary construction mega projects, including five years in hydro-power initiatives, power generation plants, sub-stations, hospitals, residential buildings, workshops, factories, water treatment plants, boosters, electric systems, and mega tunnels using mixed-shield TBMs. Currently, I serve as the planning manager for the AHPC consortium on Greater Cairo Metro Line 4.

As an enthusiastic and results-oriented professional, I have a proven history of leading successful planning initiatives. My passion for strategic development and teamwork drives my interest in joining your esteemed organization. I am eager to leverage my project management expertise and innovative planning solutions to contribute to your team’s success and help achieve your organizational objectives. Together, we can create impactful strategies!

I possess a solid background in strategic planning and resource optimization, bringing valuable experience in leading cross-functional teams to meet project milestones and enhance workflow efficiency. I am recognized for my exceptional organizational skills and a collaborative approach to problem-solving

Overview

20
20
years of professional experience
3
3
Certifications
1
1
Language

Work History

Planning Manager

AHPC- CONSURTIUM
03.2025 - Current
  • Project: Greater Cairo Metro line 4 phase 1.
  • Project Budget 26 billion EGP - Harmonized contract (FIDIC pink book).
  • Designer and Consultant: NOCE, NIPPON, Shaker
  • Owner: National Authority for Tunnels (NAT)
  • Project element.
  • Tunneling works: using a mix-shield TBM machine. Two Tunnels separate with 6.25m diameter and a total length of 19.5 km.
  • Segment factor for Tunnel segment and cable trough Stations: 12 no.
  • Diaphragm walls: 435, 000 M3
  • MEP works (Escalators, elevator, HVAC, firefighting, etc.).

Planning Manager

The Arab Contractors - El Sewedy Electric Joint Venture
01.2019 - 03.2025
  • Project: Julius Nyerere Hydropower Project.
  • Project Budget 2.9 billion$ - EPC contract (FIDIC Silver book).
  • Designer and Consultant: SMEC, Power China, Artilia (Third party).
  • Project element.
  • Main Dam: 1.6 Mm3 RCC Dam with 7 spillways and height 131.
  • Diversion Tunnel: 703 m length and dimension 12
  • 17 M.
  • Power waterway and Intake: Contains 3 headrace tunnels with dia. 11.5m and 9 penstocks with 3 surge tanks.
  • Powerhouse: 235x9 - Megawatt Francis turbine.
  • Saddle Dam: 17km earth-fill Dam and 1.7 km RCC emergency spillway dam.
  • Bridge: 250m length with height 50 m using cantilever carriage method.
  • Permanent Roads: 50 Km of permanent roads.
  • Switchyard (Substation).
  • Operation and Accommodation Villages

Planning Manager

The Arab Contractors - Orascom Construction Joint Venture
03.2015 - 12.2018
  • Project: Port Said Tunnels Projects.
  • Project Budget 2 billion$ - EPC contract
  • Project consultant: SYSTRA.
  • Designers: SENER, AMBERG 1. using a mix-shield TBM machine. Two Tunnels under the Suez Canal with 13.05m diameter and a total length of 2.85 km per each. Cut & cover for entrance and egress. Using Diaphragm walls and steel struts for support with a total length of 2 km.
  • Launching and exit shafts.
  • Segment factory.
  • Security area.
  • Precast road deck.

Senior Planner/Planning Team Leader

The Arab Contractors
11.2005 - 02.2015
  • Kurimat power station: 2006-2009 Electromechanical work.
  • NBE Cairo Plaza project: 2007-2008
  • New Cairo water Boosters Stations2,3,4: 2008-2011
  • Al- Ameriah Booster Sewage Station: 2008-2010
  • Azhar Medical University Hospital: 2007-2009
  • Gaber Al Ahmed hospital in Cairo: 2008-2012
  • Air Force Hospital New Cairo: 2007-2010
  • Heliopolis Factory 81 –Re-centralization,2009-2013
  • Rehabilitation Workshops Tractors Railways: 2012-2014

Education

Bachelor - Communication Engineering

Helwan University
05.2005

Skills

Budget preparation

Certification

PMP Certification

Timeline

Planning Manager

AHPC- CONSURTIUM
03.2025 - Current

PFMP Preparation Course

01-2024

PMP Certification

01-2022

Planning Manager

The Arab Contractors - El Sewedy Electric Joint Venture
01.2019 - 03.2025

Planning Manager

The Arab Contractors - Orascom Construction Joint Venture
03.2015 - 12.2018

Primavera Advance course

01-2007

Senior Planner/Planning Team Leader

The Arab Contractors
11.2005 - 02.2015

Bachelor - Communication Engineering

Helwan University
Hassan El Ghareeb HassanPlanning Manager