Summary
Overview
Work History
Education
Skills
Certification
Timeline
Websites, Portfolios, Profiles
Hi, I’m

Hassan El Ghareeb Hassan

Planning Manager
Giza
Hassan El Ghareeb Hassan

Summary

A planning manager with over 20 years of experience in multi-disciplinary construction mega projects, including five years in hydro-power initiatives, power generation plants, sub-stations, hospitals, residential buildings, workshops, factories, water treatment plants, boosters, electric systems, and mega tunnels using mixed-shield TBMs. Currently, I serve as the planning manager for the AHPC consortium on Greater Cairo Metro Line 4 phase As an enthusiastic and results-oriented professional, I have a proven history of leading successful planning initiatives. My passion for strategic development and teamwork drives my interest in joining your esteemed organization. I possess a solid background in strategic planning and resource optimization, bringing valuable experience in leading cross-functional teams to meet project milestones and enhance workflow efficiency. I am recognized for my exceptional organizational skills and a collaborative approach to problem-solving

Overview

20
years of professional experience
6
Certifications
2
Languages

Work History

AHPC- Consortium

Planning Manager
03.2025 - Current

Job overview

  • Project: Greater Cairo Metro line 4 phase 1.
  • Project Budget 26 billion EGP - Harmonized contract (FIDIC pink book).
  • Designer and Consultant: NOCE, NIPPON, Shaker
  • Owner: National Authority for Tunnels (NAT)
  • Project element.
  • Tunneling works: using a mix-shield TBM machine. Two Tunnels separate with 6.25m diameter and a total length of 19.5 km.
  • Segment factor for Tunnel segment and cable trough Stations: 12 no.
  • Diaphragm walls: 435, 000 M3
  • MEP works (Escalators, elevator, HVAC, firefighting, etc.).
  • Mentored and supported 12 department employees to create strong workplace culture.
  • Created new methodologies to improve planning process and results.
  • Mentored and supported 14 department employees to create strong workplace culture.
  • Reduced costs through efficient resource allocation and strategic negotiations with suppliers.
  • Delay Analysis Using TIA Method.

The Arab Contractors - El Sewedy Electric Joint Venture

Planning Manager
01.2019 - 03.2025

Job overview

  • Project: Julius Nyerere Hydropower Project.
  • Project Budget 2.9 billion$ - EPC contract (FIDIC Silver book).
  • Designer and Consultant: SMEC, Power China, Artilia (Third party).
  • Project element.
  • Main Dam: 1.6 Mm3 RCC Dam with 7 spillways and height 131.
  • Diversion Tunnel: 703 m length and dimension 12 m width and 19 m Hight
  • Power waterway and Intake: Contains 3 headrace tunnels with dia. 11.5m and 9 penstocks with 3 surge tanks.
  • Powerhouse: 235x9 - Megawatt Francis turbine.
  • Saddle Dam: 17km earth-fill Dam and 1.7 km RCC emergency spillway dam.
  • Bridge: 250m length with height 50 m using cantilever carriage method.
  • Permanent Roads: 50 Km of permanent roads.
  • Switchyard (Substation).
  • Operation and Accommodation Villages
  • Evaluated project performance, identifying areas for improvement and implementing necessary changes.
  • Increased team productivity with regular progress monitoring and providing constructive feedback.
  • Improved project efficiency by streamlining planning processes and implementing effective communication strategies.
  • Optimized scheduling procedures for improved resource utilization, resulting in increased cost savings for the company.
  • Planned resources, conducted costing activities, and managed bid and proposal phases.
  • Reported issues to higher management with great detail.

The Arab Contractors - Orascom Construction Joint Venture

Planning Manager
03.2015 - 12.2018

Job overview

  • Project: Port Said Tunnels Projects.
  • Project Budget 2 billion$ - EPC contract
  • Project consultant: SYSTRA.
  • Designers: SENER, AMBERG 1. using a mix-shield TBM machine. Two Tunnels under the Suez Canal with 13.05m diameter and a total length of 2.85 km per each. Cut & cover for entrance and egress. Using Diaphragm walls and steel struts for support with a total length of 2 km.
  • Launching and exit shafts.
  • Segment factory.
  • Security area.
  • Precast road deck.
  • Improved project efficiency by streamlining planning processes and implementing effective communication strategies.
  • Evaluated project performance, identifying areas for improvement and implementing necessary changes.
  • Created new methodologies to improve planning process and results.
  • Delay Analysis using Impacted As planned

The Arab Contractors

Senior Planner/Planning Team Leader
11.2005 - 02.2015

Job overview

  • Kurimat power station: 2006-2009 Electromechanical work.
  • NBE Cairo Plaza project: 2007-2008
  • New Cairo water Boosters Stations2,3,4: 2008-2011
  • Al- Ameriah Booster Sewage Station: 2008-2010
  • Azhar Medical University Hospital: 2007-2009
  • Gaber Al Ahmed hospital in Cairo: 2008-2012
  • Air Force Hospital New Cairo: 2007-2010
  • Heliopolis Factory 81 –Re-centralization,2009-2013
  • Rehabilitation Workshops Tractors Railways: 2012-2014

Education

Helwan University
Cairo

Bachelor from Communication Engineering
05.2005

University Overview

Skills

Budget preparation

Issue resolution

Cross-functional collaboration

Team leadership

Multitasking

Delay Analysis (TIA, Impacted as planned)

Problem-solving

Scheduling

Project management

Scheduling coordination

Department management

Schedule management

Team building

FIDDIC (EPC ) Silver Book

Staff management

Certification

PMP Certification, 2022-01

Timeline

Planning Manager
AHPC- Consortium
03.2025 - Current
Planning Manager
The Arab Contractors - El Sewedy Electric Joint Venture
01.2019 - 03.2025
Planning Manager
The Arab Contractors - Orascom Construction Joint Venture
03.2015 - 12.2018
Senior Planner/Planning Team Leader
The Arab Contractors
11.2005 - 02.2015
Helwan University
Bachelor from Communication Engineering

Websites, Portfolios, Profiles

Websites, Portfolios, Profiles
https://www.linkedin.com/in/hassan-el-ghareeb-hassan-2b0528b2
Hassan El Ghareeb HassanPlanning Manager