Experienced Technical office manger with over 17 years of experience in construction projects. Excellent reputation for resolving problems and Managing the technical office for construction projects
Preparing Invoices of the subcontractors and Invoice of the client -Project needs management- Contracts Management- Reviewing tender drawing.
.
The project of constructing a water treatment plant, Bahr al-Baqar,at a cost of 1.27 billion dollars
The station shall be from the main building of the pumps,the headquarters of the SCADA control unit,sewage treatment plant includes 4 units,with a discharge of 1.4 million m3/day for each unit.
( Concrete Works -Finishing Works -land Escap -hard escap )
- Preparing Invoices of the subcontractors and Invoice of the client - Project needs management. - Contracts Management. - Reviewing tender drawing. - Reviewing and preparing designs and Shop drawings . - Quantity survey. - Time schedules. - Submittal requests. - Prepare reports on projects.
- The project consists of the construction of four Four Foot Bridges on roads (Prince Majed Road - King Khalid Road - King Fahd Road - Makarunah Road) ، concrete towers works -
Steel structure Bridge - finishing works – electrical works and elevator work
- Preparing Invoices of the subcontractors and Invoice of the client
- Project needs management - Contracts Management-Reviewing tender drawing-Time schedules - Prepare reports on projects.
The project consists of a tunnel of cars with 600 m length and bridge with 580 m length to solve the traffic problem in Thumama road - Construction water tanks for irrigation -agriculture works - Road construction works 10Km-Landscape work 20000m2 - Strom water Pipes length of 8km.- Preparing Invoices of the subcontractors and Invoice of the client
- Project needs management- Contracts Management-Reviewing tender drawing-Reviewing and preparing designs and Shop drawings - Quantity survey -Time schedules-Submittal requests-Prepare reports on projects.
The project consists of two concrete bridges with 700 m length to solve the traffic problem in Imam Saud road .
- Preparing Invoices of the subcontractors and Invoice of the clint- Project needs management -Contracts Management-Reviewing tender drawing-Reviewing and preparing designs and Shop drawings -Quantity survey-Time schedules-Submittal requests-Prepare reports on projects.
The project consists of steel structure bridge on concrete foundations and piles with 550 m Length crosses a branch of the Suez Canal .- Preparing Invoices of the subcontractors and Invoice of the client
- Quantity survey-Prepare reports on projects.
Technical office engineer at korymat power station II Project & power station IIl Project , Project cost 40 Million.LE .
The project consists of steam turbine buildings, control building, Pipe Rack Foundation,Drainage building and transformer building.
- Preparing Invoices of the subcontractors and Invoice of the client - Reviewing and preparing designs and Shop drawings - Quantity survey.
- Time schedules-Prepare reports on projects.
- Preparing Invoices of the subcontractors and Invoice of the client
- Project needs management-Quantity survey.
Workflow planning
Rivit - Stucturel Bim Specialist
Microsoft (windows, office “word, excel, PowerPoint ”)
AutoCAD
MS project
Primavera
Fidic diploma
Fidic diploma
Modern engineer
Diploma in Civil Engineering