Summary
Overview
Work history
Education
Skills
LANGUAGES
Timeline
Generic

TALAAT BOULOS BADIR

HURHHADA/ RED SEA,Egypt

Summary

Accomplished professional with more than 25 years of experience in Alcoholic beverages industry (Beer, wine and Spirit), Engineering management, CAPEX, project management, preventive and predictive maintenance. Demonstrates strong team leadership and technical management skills Committed to driving operational efficiency and excellence through strategic planning and innovative solutions.

Overview

26
26
years of professional experience

Work history

Chief Engineer – Gianaclis Plant

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
10.2019 - 12.2025

Responsibilities:

  • Applying maintenance strategies and engineering standards for all packaging lines and production processes in wine and spirit plants.
  • leading engineering department (maintenance and utilities functions). to achieving the department objectives
  • Applying systematic approach to solve technical issues to enhance system performance.
  • Strong plan for restoring basic conditions for building and machinery
  • Facilitated training sessions to improve team's technical skills.
  • Maintained accurate records to streamline administrative tasks.
  • Conducted inspections of equipment to meet performance standards.
  • Monitored health and safety standards to ensure a safe workplace.
  • Organized tasks effectively to meet projects deadlines.
  • Collaborated with production packaging teams to achieve engineering objectives.
  • Manage budget for repairs and maintenance to be on track
  • manage energy and water consumption to be in targets

Achievements: -

  • Redesign water treatment plant, installation and startup to comply with the standard
  • Redesign cooling plant from three separate cycles and upgraded in one cycle, installation and startup for energy saving
  • Redesign fuel station with new fuel tanks and upgrade daily fuel tank for boilers, installation and startup for safe workplace
  • Upgrade packaging line for wine, new lay out and new machines installation
  • Gianaclis plant achieved first place in energy and water saving among Heineken worldwide plants 2025
  • Packaging lines performance more than 90% OPI
  • Distillery tower performance more than 92 % OPI

Project Manager – Obour Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
03.2018 - 09.2019

Responsibilities:

  • Project Planning and Scope Definition
  • Resource Allocation and Management
  • Time and Budget Management
  • Risk Management
  • Communication and Stakeholder Management
  • Documentation and Compliance
  • Project Closure

achievements:

  • installation of dust explosion protection system in malt intake with BUHLER company
  • installation of evaporative condenser in cooling plant with Johnson controls company
  • installation of cooling tower for canning line pasteurizer with Evapco company
  • installation of water degassing unit (DAW) in cellar with GEA company
  • installation of two oil free air compressors with Atlas Copco company
  • study and execution to increase the glycol cooling capacity by increase the plate heat exchanger plates and increase the capacity of pumps to meet the cooling loads

Project Manager – Sharkia Plant

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
03.2016 - 02.2018

Achievements:

  • WWTP upgrade to comply with environmental standards
  • installation of PET line palletizer with Jebo Company
  • installation of two tanks of liquid CO2 with Pentair company
  • installation of two evaporative condensers for cooling plant
  • installation of dust explosion protection system in malt intake with Kunzel company
  • installation of two bright beer tanks in cellar with Krones Company


Maintenance Manager – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
02.2011 - 03.2016

Achievements:

  • Dismantled of all machines and equipment related to Al-Ahram beverages from Gouna 2, transferred to Gouna 1 then installed it inside Gouna 1
  • Re-install the machines instead of that transferred to another plants
  • Install the CO2 recovery plant by brewery team
  • Install the boiler by brewery team
  • Install water treatment plant by brewery team
  • Install the secondhand keg line by brewery team
  • Startup and commissioning the brewery in July 2012
  • After brewery startup focusing on maintenance standards and PM plans that reflected to keg line achieved 100% OPI
  • Spare parts management system to secure critical spare parts
  • Contribution in Energy and water saving with other departments



Maintenance Manager -Gouna 2( EgyBev building)

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
04.2009 - 01.2011

Responsibilities:

  • Improved equipment efficiency by implementing preventative maintenance procedures.
  • Performed routine checks to ensure optimal machine performance.
  • Worked closely with operations department to prevent production interruptions.
  • Responded promptly to breakdowns, maintained high service uptime.
  • Conducted risk assessments for safer work environment.
  • Supervised maintenance team and reviewed completed work to evaluate performance.
  • Implemented improved training programs for maintenance employees.

Maintenance & Project Engineer – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
01.2002 - 03.2009

Responsibilities:

  • Gouna brewery was totally shutdown during this period, and I was responsible of taking care and maintain the equipment by run the machines according to the PM plan to keep it functionally like cooling compressors, boilers, air compressors. pumps, and all equipment contains moving part
  • Dismantle the machines needed from the brewery and transferred to other plants then install it in the other pants

Maintenance Engineer – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
01.2001 - 01.2002
  • Ensured optimal machine performance with regular maintenance and calibration.
  • Managed stock control of spare parts to ensure minimal operational disruptions.
  • Carried out detailed breakdown analyses leading to reduced downtime.
  • Solved complex technical issues to maintain smooth operations.
  • Carried out scheduled preventative maintenance requests on all machines, processes and assembly lines.

Maintenance & packaging engineer

Gouna water company
01.2000 - 12.2000

Education

Bachelor degree of mechanical engineering Jan 1997

Skills

  • Engineering Management for Alcoholic beverages industry (Beer, Wine and Spirit)
  • CAPEX & Project Management
  • Preventive & Predictive Maintenance
  • Team Leadership & Technical Management
  • AutoCAD 2D

LANGUAGES

Arabic (Native)
Native
English (Professional)
Upper intermediate

Timeline

Chief Engineer – Gianaclis Plant

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
10.2019 - 12.2025

Project Manager – Obour Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
03.2018 - 09.2019

Project Manager – Sharkia Plant

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
03.2016 - 02.2018

Maintenance Manager – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
02.2011 - 03.2016

Maintenance Manager -Gouna 2( EgyBev building)

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
04.2009 - 01.2011

Maintenance & Project Engineer – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
01.2002 - 03.2009

Maintenance Engineer – Gouna Brewery

AL AHRAM BEVERAGES COMPANY (HEINEKEN EGYPT)
01.2001 - 01.2002

Maintenance & packaging engineer

Gouna water company
01.2000 - 12.2000

Bachelor degree of mechanical engineering Jan 1997
TALAAT BOULOS BADIR